Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A geological appraisal of the coal resources of Nova Scotia

    By Peter A. Hacquebard

    Recent drilling programs have shown that the in-situ coal resources of Nova Scotia are very substantial. The grand totals of the measured, indicated and inferred categories amount to 232 m, 646m and 9

    Jan 1, 1979

  • CIM
    Using Piston–Die Press Tests for Preliminary Sizing and Selection of a High-Pressure Grinding Roll

    By P. Rosario

    "Industry practice for high-pressure grinding roll (HPGR) assessment and sizing relies on tests using pilot-scale machines with 0.7–1.0 m roll diameters. Typically 1–10 t of sample are required, depen

    Jan 1, 2019

  • CIM
    The Future of Canada's Uranium Mining Industry

    By W M. Gilchrist

    This paper gives an estimation of the future requirements of the western world in relation to energy re-sources. It then goes on to outline the role that atomic power -with its basic raw material, ura

    Jan 1, 1964

  • CIM
    Geostatistical Modeling of McMurray Oil Sands Deposits

    By Oy Leuangthong

    The McMurray formation in the Athabasca oil sands deposits of Northern Alberta is part of the world?s second largest proven crude oil reserves. The formation is characterized by stratigraphic layers t

    May 1, 2004

  • CIM
    Minerals Used in the Ceramic Industries

    By Norman B. Davis

    THE ceramic group of industries is comprised of those engaged in the manufacture of cement, glass, artificial abrasives, whiteware, including earthenware, stoneware, porcelain tableware, porcelain san

    Jan 1, 1938

  • CIM
    The Key Tuffite, Matagami mining district: Origin of the tuff components and mass changes

    By W. H. MacLean, S. Liaghat

    Abstract- The Key Tuffite is a thick (0.3 m to 6 m) and laterally extensive (-10 km) cherty, sulfide-bearing tuff unit in Archean greenstones in the Matagami mining district in northwestern Quebec. It

    Jan 1, 1992

  • CIM
    The Ecstall Story: The Underground Mine .

    By John Ramsay, Frederick A. Edwards, J. Eric Belford, Clarence V. Amyotte

    "DEVELOPMENT of the underground mine is carried out from a main ramp driven from surface to the 800 and 1200 levels and from a shaft sunk to 3050 ft. Sub-levels at approximately 100-ft vertical interv

    Jan 1, 1974

  • CIM
    Autoclave Leaching of Zinc Concentrate at a Bench Scale.

    By Claudio Acuña, Sergio Romo, Gerardo Fuentes

    The leaching kinetics of a zinc concentrate in autoclave reactors were studied. A sample of concentrate from Bolivia, with typical mineralogical characteristics of the Andes region, was used. A concen

    Jan 1, 2015

  • CIM
    Mineralogical Characteristics and Beneficiation of An Oolitic Iron Ore From the Peace River District, Alberta

    By W. Petruk

    Mineralogical studies and concentration tests were conducted on samples from an oolitic iron deposit from the Peace River district in Alberta to determine what concentrate grades and metal recoveries

    Jan 1, 1977

  • CIM
    A Shield-Data-Based Horizon Control Approach for Thin Seam Coal Mining Utilizing Plow Technology

    By S. Beitler

    The availability of renewable energy does not meet the demands of consumption. Hence, fossil fuels will continue to be an important energy source, and coal promises to cover the requirements for the c

    Aug 1, 2013

  • CIM
    Design, Implementation, and Commissioning of the Gibraltar Development Plan 3

    By S. A. H Tyrrell, R. Rotzinger

    "Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G

    Jan 1, 2014

  • CIM
    Crushing, Grinding and Concentrating

    By David Runnels

    The Mount Wright iron are mine and upgrading plant were brought on line in the fall of 1975. The mine is located near the Quebec - Labrador border some six hundred miles northeast of Montreal. This pa

    Jan 1, 1977

  • CIM
    Arsenic Stability and Characterization of CESL Process Residues

    By K. Mayhew, R. Bruce, A. Heidel, G. P. Demopoulos

    "Teck and Aurubis are working together to commercialize a technology for the processing of copper arsenic sulphide concentrates that is economic and sustainable with regards to the environment and com

    Jan 1, 2012

  • CIM
    International mineral development a banker's view

    By P. D. Waters

    "Mineral deposits are where you find them; they have no allegiance to territorial boundaries. Over the past decade much of the new investment in mining has been outside of continental North America, l

    Jan 1, 1986

  • CIM
    Reducing maintenance costs through predictive fault detection

    By Y. Faitakis

    In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.

    Jan 1, 2004

  • CIM
    Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)

    By Y. Faitakis, G. J. Powley, C. Mackenzie

    "In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis

    Jan 1, 2004

  • CIM
    Maximizing Gravity Recovery through the Application of Multiple Gravity Devices

    By J. A. Abols, P. M. Grady

    Recovery via gravity is one of the oldest mineral processing methods available. Unfortunately, the use of gravity techniques for gold recovery has been in decline for the past century as more effectiv

    Jan 1, 2005

  • CIM
    The Fuel Market Situation in the Pacific Northwest

    By Joseph Daniels

    When Dame Nature shook her horn of plenty and distributed her bounties over the face of the earth, she blessed the Pacific coast with many riches, but with these she added many offsetting disadvantage

    Jan 1, 1924

  • CIM
    Simultaneous Optimization of Ultimate Pit and Production Scheduling Using a Heuristic Approach

    By A. K. Mahto, B. Samanta

    "A heuristic model was developed to simultaneously generate the ultimate pit and production scheduling at a mining project. The method consists of a preprocessing step to select a starter pit, the imp

    Jan 1, 2017

  • CIM
    New Initiatives in Swedish Mining Research and Development

    By Göran Bäckblom

    The Swedish mining companies LKAB and Boliden, the equipment supplier Atlas Copco, the general contractor NCC and the specialist company Reflex joined forces in 2005 to advance the field of rock techn

    May 1, 2006