Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Framework to Generate Accurate and Complete as-Built BIMS Based on Progressive Laser Scans

    By Te Gao

    It is a general expectancy that in most of the construction and renovation project, the contractor is going to hand over the as-built documents to the owner or the facility management team at the comp

    Aug 1, 2013

  • CIM
    Safety First – Remote Rehabilitation of Underground Excavations

    By G. P. van Greunen

    "The rehabilitation of underground excavations has been undertaken as long as mining has existed. The conventional methods have proven to be dangerous, time consuming and expensive. During the constru

    Jan 1, 2019

  • CIM
    Assessment of the Efficiencies of Auxiliary Ventilation Systems Using Empirical Methods

    By Raymond S. Suglo

    Increasing depths of mining coupled with the mechanization of most underground mining operations have led to growing complexities in the mine environments with the production of large amounts of gaseo

    May 1, 2001

  • CIM
    Modification of the Sarcheshmeh Copper Complex Flotation Circuit in Response to a Reduction in Feed Grade

    By S. Banisi, E. Arghavani, A. Akbari, Gh. A. Parsapour, S. Darvish Tafvizi

    The new copper processing plant of the Sarcheshmeh copper complex consists of two parallel circuits. After a primary crushing, the ore is sent to a SAG mill and the product is further ground in a ball

    Jan 1, 2016

  • CIM
    Computer Control of Brunswick Mining's No.12 CuPb Flotation Circuit

    By A. Trusiak

    "Increasing energy costs in mineral processing is making it necessary for tighter controls over various parts of the concentrating process. Continuous monitoring and control of critical process stream

    Jan 1, 1981

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 1

    By D. Berkley

    "The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining a

    Jan 1, 2003

  • CIM
    The Red Dog VIP Mill Optimization Project - A Study in Fast-Track Project Execution and Alliance Contracting

    By Steve W. Ciccone

    The Red Dog Mine is both the largest known zinc reserve and the largest zinc producer in the world. The mine started in 1989, and by 1999 had increased production from approximately 300,000 tonnes per

    May 1, 2002

  • CIM
    Improvement in Quality of Pyrite Concentrate by Low Cost Flotation-Gravity Separation Flowsheet at Fankou Mine

    By Zhao-shu Sun, Mao-lin Li, Rui Cui

    "Fankou Mine produced pyrite concentrate (PC) from the tailings by rougher and scavenger flotation before 2010, with the averaged S grade of 40.54% at recovery of 79.34%. The economic value of PC incr

    Jan 1, 2016

  • CIM
    A Historical Survey of the Methods Used to Reduce the Size of Ore at the Holliger Mine

    By I. M. Gordon, J. Blackshaw

    "Run-of-mine ore is reduced to 4 per cent on 4 mesh (3/ 16 inch), using four stages of dry crushing. The mill feed is then reduced to 2 per cent on 48 mesh and 60 per cent through 200 mesh, using one

    Jan 1, 1965

  • CIM
    Chameleons in northern Canada

    By Robert B. Parsons

    "For the fourth time in five years, residents of northern Canada have seen a change in the tax treatment of housing and travel costs. The latest changes announced in December 1990 by the Minister of F

    Jan 1, 1991

  • CIM
    Rock fragmentation and the design of underground materials handling systems

    By G. D. Just

    "Extensive mechanization of underground mining operations, improvements in blasting technology and the development of simulation models for systems evaluation has now made it feasible to optimize rock

    Jan 1, 1980

  • CIM
    The Evolution of Open-Pit Drilling and Blasting Practices at the Normandie Mine

    By J. E. McMenamin, R. B. Hall

    "With the emphasis in the past decade on larger and more efficient equipment for open-pit operations, the Normandie mine of the Asbestos Corporation has followed the trend, switching from the smaller

    Jan 1, 1966

  • CIM
    Breaking New Ground

    By Natasha A. Essar

    Nevsun Resources Ltd. Bisha Mine Project is a gold and base metal development project in the Gash Barka region of west-central Eritrea. The project has the potential to be one of the largest industri

    May 1, 2007

  • CIM
    Emergency Plan Methodology for Mine Fire Simulations in Chuquicamata Underground Mine

    By J. E. Carrasco, J. D. Stinnette, R. A. Alvarez

    "Chuquicamata Underground Mine is one of the main projects for the Chilean government copper company (CODELCO). Underground mine project has been under construction since 2013 and presents a solution

    Jan 1, 2019

  • CIM
    Bond Is Back!

    By Mark Sherman

    One of the main functions of a process technology and engineering services provider is to select grinding equipment that will meet the client?s throughput rate target. Prudent risk mitigation strategi

    Jan 1, 2012

  • CIM
    Geological Setting and Metalogenesis of Radioactive Mineral Resources in Bafq - Saghand Ore Belt (Central Iran)

    By Bahram Samani

    The Bafq - Saghand ore belt (metallogenic zone) is the main region, where the major discovered Uranium resources are located. This belt is a unique Upper Precambrian terrane experienced Katanga ? Pan

    May 1, 2007

  • CIM
    Corrosion-Wear Monitoring of TiN Coatings by Electrochemical Noise Measurements

    By P. -Q. Wu

    A modified electrochemical noise (EN) technique has been applied to monitor corrosion wear of TiN-coated ASP23 steel and TiN-coated AISI 316 stainless steel sliding against corundum in 0.5 M H2SO4. Ex

    Jan 1, 2005

  • CIM
    Predicting cave initiation and propagation

    "The most widely used method for predicting the onset of continuous caving is Laubscher’s caving chart. A detailed examination of this method was undertaken which concluded that it had limitations whi

    Jan 1, 2003

  • CIM
    Hangingwall sloughing mechanism in open stope mining

    By J. Ran

    "Hangingwall sloughing is the major cause of unplanned stope dilution in open stope mining. Understanding the hangingwall sloughing mechanism can guide the stope design in minimizing the unplanned dil

    Jan 1, 2002

  • CIM
    Gaining Insights on Career Satisfaction for Women in Mining

    By T. Nyabeze

    This paper presents the experiences and views of women involved in the mining industry as determined from a questionnaire that was circulated across the Canadian mining industry. Globally, there have

    Oct 1, 2010