Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Investigation of Recovery of REE from Marvast Placer Deposits in Pilot Scale

    By A. Ojaghi, A. R. Mohammadi

    "The Marvast monazite deposit is located 35 kilometres south - southwest of Marvast in Yazd province of Iran. A representative sample weighing approximately 10 tons was prepared to study the amenabili

    Jan 1, 2016

  • CIM
    Managing Furnace Integrity by Utilizing Non-Destructive Testing (NDT) and Monitoring Techniques`

    By T. Gerritsen, R. MacRosty, R. Pula, P. Gebski, W. L. Ying

    Furnace run-outs can cause extended furnace downtime for repair, while leaks or more severe failures in the cooling system can lead to brick hydration or in severe cases, steam explosions. These incid

    Jan 1, 2015

  • CIM
    Understanding Single Particle Breakage Event to Evaluate the Effect of Applied Strain Rate

    By Fatemeh Saeidi, Luis Marcelo Tavares, Malcolm Powell, Mohsen Yahyaei

    "Understanding a single breakage mechanism is fundamental to the development of breakage testing techniques appropriate for mechanistic modelling of any breakage equipment. In the light of this insigh

    Jan 1, 2016

  • CIM
    The Use of Hydraulic Cyclones in the Filtration of Sullivan Lead Concentrates

    By D. B. Smith

    DURING the summer of 1953, test work commenced at the Sullivan Concentrator with a view to the modification of filtration practice by the inclusion of wet cyclone classification of the lead concentrat

    Jan 1, 1956

  • CIM
    Experiences with Real Time Equipment Monitoring ? Using Advanced Analytics to Equipment Life and Reduce Costs

    Mining Equipment Challenges Equipment Availability Unplanned downtime Maintenance Costs Secondary damage and catastrophic failures (T282 $750k) Emergency work is 4x the cost of planned work Ins

    May 1, 2013

  • CIM
    The Low Temperature Blast Furnace

    By Patrick E. Cavanagh

    "A pilot shaft furnace was operated for one year at Steep Rock to produce special high-grade products from coarse ore, using lignite as fuel. The furnace is 10 ft in diameter and 60 ft high. When oper

    Jan 1, 1968

  • CIM
    Research on Shearing Test of Bedding Planes Between two Different Rock Types in Badong Formation under Different Roughness Coefficient JRC Based on Particle Flow Code

    By Y. F. Jiang, K. Fang, Q. Q. Jiang, Q. Wu

    Inter formational sliding of bedding planes between two different rock types in Badong formation is an important reason that leads to the instability and fracture of rock mass in this stratum. There a

    Jan 1, 2015

  • CIM
    Some Legal Unitization and Engineering Problems of Oil and Gas Producing Concerning Properties

    By D. W. MacFarlane

    In the formation of Oil and Gas Producing Units lawyer& and engineers are interdependent members of the same team. Management is, there-fore, entitled to expect no less than a total cooperative effort

    Jan 1, 1960

  • CIM
    Electrolytic Treatment Of Highly Contaminated Effluents From Copper Smelters

    By S. R. Stopic

    The EU-financed INTREAT Project (Integrated treatment of industrial wastes to¬wards prevention of regional water resources contamination) addresses the environmental pollution associated with solid an

    Jan 1, 2007

  • CIM
    Effect of Neodymium on the High Temperature Oxidation and Ignition Behavior of Magnesium

    By M. O. Pekguleryuz, D. S. Aydin

    The high temperature oxidation and ignition resistance of Mg-(0-6) wt% Nd alloys have been investigated via isothermal and continuous heating experiments conducted in air atmosphere. Alloy composition

    Jan 1, 2015

  • CIM
    Applying Fractional Factorial Design in Optimizing Barite Flotation of Jig Tailing at Dorrin Kashan Mine

    By M. Zavvari

    Flotation, as with most engineering disciplines, involves testwork. Commonly this means going from lab scale to pilot scale to industrial scale. It is important to conduct tests to identify key parame

    Jan 1, 2009

  • CIM
    WMS @ SNC-Lavalin Works Management System

    WMS an Operation Service and Tool WMS is a the new SNC-Lavalin solution to complete and support your site?s operation. It targets phases in the project cycle including mechanical completion, pre oper

    Aug 1, 2013

  • CIM
    Discrete-Event Simulation in Underground Mining ? Applicability and Experience at Vale Canada Operations

    By Greg Yuriy

    Over the past two decades, Vale Canada has used discrete-event simulation in a key role to support many underground mining studies. Traditionally, general purpose simulation software was developed for

    Aug 1, 2013

  • CIM
    Crack in Corrosion (CIC) Failure in APL-5l X 52 Thin-Walled Linepipe

    By D. Cronin, A. Plumtree, A. Hosseini

    "Crack in corrosion (CIC) linepipe defects are hybrid defects not directly addressed by existing assessment methods. To investigate the collapse pressure of these defects, CIC defects were formed in 5

    Jan 1, 2012

  • CIM
    Surfactant Blinding Agents for Preg-Robbing Ores in Cil and Ril

    By J. Zachwieja

    As part of a general review on study of surfactant blinding agents to improve gold recovery during cyanide leaching of carbonaceous gold ores, processes of CIL and RIL leaching using surfactants were

    Jan 1, 2015

  • CIM
    The Use of Spectrographic Semiquantitative Analysis in Geological Exploration

    By W A. James

    The use of spectrographic semi-quantitative analysis has recently been of considerable value in establishing the geological relationships in a complicated orebody. The principal minerals found in the

    Jan 1, 1963

  • CIM
    An Overview of Valuation Practices and the Development of a Canadian Code for the Valuation of Mineral Properties

    By Keith Spence

    "The notion of ""value"" has always been a subjective and contentious issue. Indeed, Value is in the eye of the beholder. There are varied methods and practices for valuing property, as there are indu

    Jan 1, 2003

  • CIM
    Mechanical Properties of AA7068 Aluminum Alloy Fabricated by Twin Roll Casting and Rolling Process

    By Dong-Hyeun Koh, Yun-Soo Lee, Min-Seok Kim, Hyoung-Wook Kim

    High strength AA7068 (Al - 7.88 wt.% Zn - 2.68 wt.% Mg - 2.07 wt.% Cu) aluminum alloy strip was successfully fabricated by horizontal-type twin roll casting. A simulation technique was used to obtain

    Jan 1, 2015

  • CIM
    MDS Analysis of Film Stability and Bubble Attachment at Selected Mineral Surfaces

    By J. Jin, J. D. Miller

    "Bubble attachment at hydrophobic surfaces is of critical importance in the flotation recovery of mineral resources and fundamental experimental results have been reported in the literature describing

    Jan 1, 2016

  • CIM
    Study on the Fabrication Process of Advanced Radiation Resistant Oxide Dispersion Strengthened Steel Tube

    By Gae On Kim, Ki Baik Kim, Suk Hoon Kang, Tae Kyu Kim, Sanghoon Noh

    "Advanced radiation resistant oxide dispersion strengthened steel (ARROS) is being developed as a fuel cladding tube material for future nuclear reactor system applications. The research activities co

    Jan 1, 2017