Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Time ? A Key Seismic Source Parameter

    By Marty Hudyma

    There are five independent seismic source parameters: seismic energy, seismic moment, source size, location, and time. These parameters are investigated primarily for evaluating seismic hazard and und

    Jun 1, 2012

  • CIM
    Oil and Gas - Off shore

    By D. F. Sherwin

    "THE AREA which is described in this paper (Fig. 1) includes the continental margin of eastern Canada extending from the Gulf of Maine to the north edge of the Grand Banks, which, including the contin

    Jan 1, 1972

  • CIM
    Blast-Hole Diamond Drilling at Flin Flon

    By G. M. Proudfoot

    IN June, 1940, a .Longyear 3420 blast-hole drill rig was purchased by the Hudson Bay Mining and Smelting Company for the purpose of experimental blast-hole drilling. The early work showed that the dia

    Jan 1, 1943

  • CIM
    Multi-Criteria Optimizing Method of Earthwork Machine Group Selection Implemented into Soil Processes

    By J. Ga?parík

    The optimal selection of machine or machine group for building processes is very important role of building planner during the process of building planning. During this process building planner have t

    Aug 1, 2013

  • CIM
    Deportment of Toxic Trace Elements in the CIP/CIL Cyanidation Process

    By K. Bunney, R. Pleysier

    The deportment of a suite of elements through representative gold ore processing unit operations in cyanidation has been investigated. Chromium and lead are not soluble in alkaline cyanide solutions.

    Jan 1, 2011

  • CIM
    State of the Art Review: Monitoring-While-Drilling for Mining Applications

    By D. J. Lucifora

    Monitoring-While-Drilling (MWD) is a proven technique that records instantaneous on-drill parameters which can be used to supply contextual information for in-situ, down hole conditions, such as: chan

    Aug 1, 2013

  • CIM
    Use of LCA in the Mining Industry and Research Challenges

    By Pascal Lesagel

    Life Cycle Assessment (LCA) is a holistic environmental assessment tool that allows the compilation and evaluation of the inputs, outputs, and potential environmental impacts of a product or service t

    Nov 1, 2008

  • CIM
    Competitive Metal Adsorption Phenomena in Acid Mine Drainage Treatment using Blast Furnace Slag as Functional Adsorbent

    By J. Manchisi

    This study has investigated the use of blast furnace slag as functional adsorbent for metal ions in acid mine drainage treatment. This opportunity has not yet been developed into a practical process p

    Aug 1, 2013

  • CIM
    Accurate Live Measurments for Shaft Aligment during Sinking or Shaft Remediation

    By G. Bonin, A. Jamal, G. Preciado, S. Gillis

    "Accurate, easy to obtain, and reliable methods of measurement are the cornerstone of shaft and tunnel developments - during their sinking, operation and maintenance, or in some cases, remediation. Th

    Jan 1, 2019

  • CIM
    The Line Creek Operation-an update

    By D. A. Riva

    "The Line Creek Project is located in southeastern British Columbia, approximately 25 kilometres north of Sparwood. The design is to produce a total of2.7 million tonnes of coal annually. This is made

    Jan 1, 1982

  • CIM
    Addressing our Workforce Challenges

    By Jerry Handford

    Investing in the Development of our Future Workforce ?Collaborative partnerships with educational institutions, industry associations, governments and other businesses. ?Programs: »Co-op / Discip

    May 1, 2006

  • CIM
    A Techno-Economic Evaluation of the Use of Seawater for Copper Flotation

    By Nawshad Haque, Leanne Smith, Hal Aral, Joseph Cho, Warren Bruckard

    "Water availability is one of the principal parameters in determining the feasibility of mining projects in arid and semi-arid regions. The volumetric water footprint (VWF) of a conceptual model of a

    Jan 1, 2016

  • CIM
    Degradation of Copper Solvent Extraction Reagents in the Presence of Nitrate ? Contributing Factors

    By G. Kordosky

    The experience of one plant regarding degradation of copper solvent extraction reagents in the presence of 20 to 30 g/1 nitrate in the leach solution was described at Cobre 2003. However, little infor

    Jan 1, 2007

  • CIM
    Microstructure and Properties of Plates for Line Pipe Steels for Onshore and Offshore Application

    By V. Schwinn, P. Fluess, N. Cauderlier, J. Bauer

    From a strategic and economic point of view, the development of fine grain high strength steels for long distance pipelines is intensified world wide to satisfy the demand for natural gas in the futur

    Jan 1, 2005

  • CIM
    A Role of Flocculant Conformation in the Flocculation Process

    By M. Pawlik, E. Arinaitwe, V. Ferrera

    A series of flocculation tests were performed on dilute quartz suspensions with the use of five polyacrylamide-based flocculants of similar molecular weights but of different degrees of anionicity. Th

    Jan 1, 2009

  • CIM
    Haul Roads for Surface Mines in Canada

    By Dwayne D. Tannant

    This paper presents a summary of results from a questionnaire sent to surface mines in western Canada seeking information on haul road design, construction, and maintenance. There has been a marked in

    May 1, 2001

  • CIM
    Optimization of the Technological Parameters for the Copper Electrorefining Using Interference Microscopy and Digital Image Analysis

    By D. Zagidulin

    Short term electrodeposition experiments (up to 80 min.) at two current densities 220 and 275 A/m2 with varying concentrations of thiourea and glue were performed to determine the optimum levels of gl

    Jan 1, 2007

  • CIM
    Recovery of Copper from a Massive Polymetallic Sulpidde by High Concentration Chloride Leaching

    By G. B. Harris

    A new process for the recovery of copper and associated base metals from a polymetallic massive sulphide ore is described. The massive sulphide contains copper and especially nickel sulphide in a mine

    Jan 1, 2007

  • CIM
    Effect of workpiece temperature on the machinability of alumina / aluminum metal matrix composites

    By A. Saigal

    The effect of temperature on the cutting forces during machining of alumina reinforced aluminum composites was investigated, Aluminum 6061, 10% Al2O3 reinforced composite and 20% Al2O3 reinforced comp

    Jan 1, 2005

  • CIM
    Rheology of Mineral Pastes and its Implications on Underground Pipeline Delivery

    By Michael Li

    Paste backfill as a means of supporting underground mining is gaining popularity. Despite this trend, engineering and design of mine paste backfill systems are still largely based on empirical methods

    Nov 1, 2002