Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Dense Medium Process Efficiency

    By W. Lamb

    Feed Preparation ? Five primary parameters affect the screening efficiency ? Ore characteristics ? Operational characteristics ? Screen characteristics ? Water addition and washing ? System des

    Apr 1, 2005

  • CIM
    Quasi-Real Time Seismic Hazard Maps for Mining

    By Marty Hudyma

    Mining-induced seismicity and rockbursting is one of the primary risks in deep mines. Seismic data management software has been created to facilitate analysis of mining-induced seismicity. The Mine Se

    Oct 1, 2009

  • CIM
    Low-Temperature Geothermal Energy in Mining Environments

    By R. Therrien, L. Gosselin, J. Raymond

    ABSTRACT: The ground-source heat pump is a low-carbon technology that uses the earth’s renewable geothermal energy to heat and cool buildings, with an ef?ciency 3 to 4.5 times that of conventional sys

    Jan 1, 2010

  • CIM
    Trends in Mobile Equipment Monitoring

    By David Fisk

    Mining: Current Business Environment ? Commodity prices are high, but cyclic ? Increasing global competition ? Equipment costs remain high ? Maintenance costs continue to increase ? Aging experts

    May 1, 2008

  • CIM
    Upgrade of Autocatalyst Scrap for Recycling Platinum Group Metals

    By A. Suzue, T. H. Okabe, Y. Taninouchi

    Methods for the physical separation and enrichment of platinum group metals (PGMs) from autocatalyst scrap were studied in order to develop an environmentally friendly and efficient recycling process.

    Jan 1, 2014

  • CIM
    The Navachab Optimisation History; Exceeding SAG Performance Benchmarks (f5436527-39a2-4fcf-bc24-e97b0f996808)

    By H. Wilhelm, W. I. van Drunick

    The Anglogold Ashanti (AGA) Navachab single stage SAG mill has provided an excellent setting for incremental optimization. Over the past decades, several interventions have resulted in marked improvem

    Jan 1, 2012

  • CIM
    Optimisation and Continuous Improvement of Antamina Comminution Circuit (f8192cd7-9bd8-4215-8434-d5a9df56e042)

    By Edward Rybinski, Serkan Dikmen, Walter Valery, Jorge Ghersi, Roberto Valle, Alex Jankovic, Javier Linares, Frank Davila

    Compañía Minera Antamina is a polymetallic mining complex that produces copper and zinc concentrates as primary products and molybdenum and lead/bismuth/silver concentrates as by-products. In 2007, Me

    Jan 1, 2012

  • CIM
    Light Stable Isotope Evidence for a Metamorphogenic Origin for Bedding-Parallel, Gold-bearing Veins in Cambrian Flysch, Meguma Group, Nova Scotia

    By Alan L. Sangster

    Auriferous, bedding-parallel veins occur in zones of carbonaceous, argillaceous and sulfidic turbidites in the Lower to Middle Cambrian sandy flysch of the Goldenville Formation. The 0348 values for v

    Jan 1, 1992

  • CIM
    Post-mineralization Breccia Dike from the Sar Cheshmeh Porphyry Copper Deposit, Kerman, Iran (26971b14-1e95-4a1a-9cca-4e98e7d5067c)

    By J. Shahabpour

    "Breccias with angular and rounded clasts of a late-mineralization, ""barren"" hornblende porphyry dike set within a comminuted matrix consisting of rock fragments and quartz, cemented by quartz and K

    Jan 1, 1994

  • CIM
    Renewable Energy and Property Re-Use On Surface Mined Lands

    By George Carico

    Research and related demonstration projects are being conducted in West Virginia on both existing and former coal surface mine lands to determine potential post-mine land re-use options that offer the

    Aug 1, 2013

  • CIM
    Fugitive Dust in Surface Crushing Plants

    By G. V. Lewis

    "INTRODUCTORY REMARKS""I believe we need to communicate as much as possible with the industry. I don't think that we should be a body that just goes around doing dust surveys and writing nasty letters

    Jan 1, 1976

  • CIM
    The Merelani Graphite-Tanzanite Deposit, Tanzania: An Exploration Case History (f453b99b-0704-440a-8188-3812d53498c1)

    By R. J. Chase, C. Davies

    "The Merelani graphite-tanzanite deposit is located in northeast Tanzania, 14 kilometers south of Kilimajaro International Airport and in close proximity to the towns of Moshi and Arusha. The graphite

    Jan 1, 1994

  • CIM
    Vanadium Market Structure and Outlook

    By T. T. Perles

    This paper will review the state of the global vanadium industry and outline the implications for the market in the coming years. Global vanadium resources and reserves will be defined. Current produc

    Jan 1, 2014

  • CIM
    An Integrated Open Pit Optimization with Material Scheduling

    By George Dogbe

    Open pit optimization forms the basis of mine design, production planning and construction of mine facilities. The negative effects of this phase may include substantial reductions in ore recoveries,

    May 1, 2004

  • CIM
    Mill Expansion at Les Mines Selbaie

    By K. Wood, L. Duval

    "The paper discusses the approach used to add a new, separate 5000 t/d copper-zinc treatment circuit to an existing, 1650 t/d copper circuit, essentially within the existing mill building. Temporary i

    Jan 1, 1987

  • CIM
    A New Technology for Arsenic Sequestration from Mining Operations

    By B. Dubreuil, J. -M. Lalancette, D. Lemieux

    Arsenical bearing deposits are posing an increasing challenge for the mining industry. In particular, mineral processing of arsenical sulfidic ores for base and precious metals recovery tend to produc

    Jan 1, 2014

  • CIM
    Vanadium Electrolyte Cost and Purity Considerations for Vanadium Redox Flow Battery Applications

    By Maria Skyllas-Kazacos

    The All-Vanadium Redox Flow Battery that was pioneered and has been developed at the University of New South Wales (UNSW) in Sydney since the mid-1980s is currently regarded as one of the most attract

    Jan 1, 2014

  • CIM
    Application of Continuous Improvement, 5S and Standard Work in an Underground Mining Environment

    By G. Molloy

    The purpose of this paper is to demonstrate the value of applying continuous improvement, in particular 5S and standard work, in an underground environment. 5S and standard work are two aspects of Lea

    Aug 1, 2013

  • CIM
    Optimizing Bullion Fineness by 2³ Factorial Design of a Flux Composition for Gold Precipitates

    By G. E. Rodger, R. Jugoon

    "SUMMARYSamples of Aunor gold precipitates which varied widely in gold content were fluxed to produce a bisilicate slag with various oxidizers and combinations of oxidizers. On the basis of some preli

    Jan 1, 1970

  • CIM
    Managing Technical Drilling in the Resource Exploration Program

    By Ben Cottrell

    In this paper technical drilling is referred to as the process of collecting engineering and metallurgical parameters for subsequent mine design considerations. Throughout the development of a mineral

    Aug 1, 2013