Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Design Parameter For Jacked Pile

    By Sugie Prawono

    Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr

    Jan 1, 1999

  • DFI
    Pittsburgh Steelers Stadium - Deep Foundations Case Study

    By Larry Rayburn

    In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified

    Jan 1, 2001

  • DFI
    Steel Pile Foundations For Transmission Line Towers, As Used In Western Europe. - 1. Introduction.

    By Alexander J. Verstraeten

    The design and construction of foundations for power transmission line towers present some special problems. This paper describes a system of design and construction for these foundations that was dev

    Jan 1, 1987

  • DFI
    Recent Developments In Secant Bored Pile Wall Construction

    By D. E. Sherwood

    Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in

    Jan 1, 1989

  • DFI
    High Capacity And Fully Removable Soil Anchors

    By Anthony D. Barley

    Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit

    Jan 1, 2002

  • DFI
    Deep Foundation Design For Liquefaction Induced Lateral Spreads

    By Zia Zafir

    Design of the deep foundations for the loads imposed by lateral spread include the estimate of the pressure applied by the liquefied material as well as amount of anticipated displacement. In the abs

    Jan 1, 2006

  • DFI
    Quality Control For Installation Of Augered Cast-In-Place Piles

    By Francis J. Arland

    The installation of augered cast-in-place (ACIP) piles requires careful quality control to assure a successful pile installation. Unlike steel, pre-stressed concrete or other types of driven piles, wh

    Jan 1, 1997

  • DFI
    Large Diameter Drilling Operations Of Multi Head Down The Hole Hammer Drill Through Boulders And Granite - Mach Drilling System And Some Construction Examples

    By J. Nakayama

    Construction of foundation piles or diaphragm walls through rocky or boulder containing formations has been long-standing difficulty. It has been widely understood that the down-the-hole hammer is t

    Jan 1, 1989

  • DFI
    New Technology For An Old Seawall: Micropile Installation At Ellis Island National Park In New York Harbor

    By Helen D. Robinson

    The seawalls that surround Ellis Island were constructed in the early 1900s and now show varying degrees of deterioration. An innovative approach to the structural repair of the seawalls was develope

    Jan 1, 2008

  • DFI
    The Determination Of The Property Index Of Stabilizing Agent And Computer Simulation For The Optimum Mix In Deep Foundation Construction

    By Li Huimin

    In this paper the step of determining the property index and the program of mixture ratio design of stabilizing agent in deep foundation construction are presented. According to the principle of compu

    Jan 1, 1991

  • DFI
    Case History: Effect Of Plastic Clays On The Behavior Of APGD Piles In Central Florida

    By Amr M. Sallam

    In recent years, with the increase of the number of high-rise buildings that are proposed and being built in Central Florida especially in Downtown Orlando, Augered Pressure Grouted Displacement (APGD

    Jan 1, 2006

  • DFI
    Assessing the Bearing Capacity of Existing Wood Pile Foundations

    By Almer E. C. van der Stoel

    "Abstract This paper deals with assessing the bearing capacity of existing wood pile foundations. With a wide range of restoration projects being performed in the Netherlands, on many locations deep e

    Jan 1, 2014

  • DFI
    Analyzing Drivability Of Open Ended Piles In Very Dense Sands

    By James A. Schneider

    The successful installation of long piles driven into very dense sands relies on the occurrence of the reduction in local friction with increased pile embedment, a phenomenon known as ?friction fatigu

    Jan 1, 2010

  • DFI
    Session III - Foundation Techniques In The Urban Environment - Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building - Synopsis

    By Martin J. Kenwright

    Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi

    Jan 1, 2000

  • DFI
    Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a Seawall

    By Paul J. Sabatini, Yazen A. Khasawneh

    "A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse

    Jan 1, 2017

  • DFI
    Tapertube ™ Piles

    By Alexander Filotti, Stanley Merjan

    "Abstract. The paper shows the benefits and accomplishments of this relatively new but established product on the pile foundations market in the United States. The first part of the paper describes ge

    Jan 1, 2014

  • DFI
    Developing Effective Specifications For Tremie-Concrete Placement In Drilled Shafts

    By Giuliana A. Zelada-Tumialan

    Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.

    Jan 1, 2009

  • DFI
    Engineering The Mansion's Heritage

    By Ken MacLeod

    A development at 83 Queens Road in Melbourne, Australia required construction of a three level basement. The normal geotechnical constraints of excavating adjacent to an existing relatively new buildi

    Jan 1, 2006

  • DFI
    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • DFI
    Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:

    By Alun J. Davies

    This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co

    Jan 1, 2000