The Use of Shape Accel Arrays (SAAS) for Measuring Retaining Wall Deflection
By Paul Thurlow, Richard K. Lipscombe
The measurement of deflection of designed diaphragm walls is critical for near real time information to assess wall and soil behaviour as the internal area is excavated in a controlled manner. Data en
Jan 1, 2017
-
Development Of The Osterberg Load Cell
By Charles L. Guild
I will add a few facts about the use and development of the Osterberg Test Load Cell and my association with Jorj. I first met Jorj in 1965 when the Guild Construction Co. drove 12" diameter cast-in-p
Jan 1, 1989
-
Pile Load Test Results Using The New Statnamic Method
By Matthew Janes
Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa
Jan 1, 1990
-
Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit
By A. R. Dover
The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew
Jan 1, 2008
-
Trends In Deep Foundations In Europe ? Synopsis
By R. Stenne
This paper presents the trends in deep foundations in Europe, both in terms of design and construction. Eurocode 7 which is a design code for geotechnical engineering will be introduced in the Eur
Jan 1, 2000
-
Long Term Behavior Of Piles - Presented At An ASCE-Penn DOT Seminar Innovations In Geotechnical Engineering - Harrisburg, PA, April 1985
By Donald J. Murphy
Longevity of structural units, as compared to the planned useful life of a facility, always is a design consideration. Typical concerns include slow decay due to environmental factors, and changes in
Jan 1, 1986
-
Automated Installation Monitoring For Augercast And Driven Piles
By Garland Likins
Where soil conditions are favorable, augercast piles have significant economic advantages, but they also have some uncertainty due to the in construction methods. To confirm structural integrity, stat
Jan 1, 1999
-
Innovative Use of an Active Soil Nail Wall in Lieu of Pit Underpinning for a Historic Building
By Tai Luu, Maxim C. Schisler, Yaser Taheri
The Stevens Gateway Project is an expansion of the Stevens Institute campus overlooking the Hudson River in Hoboken, NJ. The plans call for 90,000 ft2 (8360 m2) of new classroom, research, and student
Jan 1, 2019
-
Reverse Circulation Drilling (Rcd) Technology For Largediameter Piles
By Nikolas Schmitz
For today’s construction industry, large-diameter piles are common practice, as they are more competitive than drilling a larger number of smaller piles. More and more piles are installed by drilling
Nov 1, 2022
-
Axial Pile Analyses For The New East Span Of The San Francisco-Oakland Bay Bridge
By Jacob Chacko
The east span of the San Francisco-Oakland Bay Bridge (SFOBB), which is one of the most heavily traveled bridges in the world, will be replaced due to seismic safety concerns. The majority of the new
Jan 1, 2002
-
Combined Loading Tests On Large Diameter Piles
By A. Lyndon
Combined loading tests are described to three 1.2m diameter cast-in-place bored piles, 12m long, formed through cohesionless material into stiff sandy clay. The maximum loading conditions imposed at t
Jan 1, 1989
-
Common Sense Changed Conditions
By Bert R. Oastler
BERT R. OASTLER: Born Atlanta, Georgia, October 19, 1933; B.S. Civil Engineering, Duke University, 1956; Doctor of Laws, Emory University, 1966; Bryan Honor Society; Associate Editor, Journal of Publi
Jan 1, 1988
-
Underwater Concrete - Mix Design And Construction Practices
By Sam X. Yao
The underwater concrete technology has historically evolved largely through a trial-and-error process of constructing marine works. Many outstanding examples exist of high quality concrete placed unde
Jan 1, 2013
-
2 Recent Technological Developments In Deep Foundations Without Soil Excavation - Recent Technological Developments In Deep Foundations Without Soil Excavation - Brief Review Of Papers To Session 2
By Bengt H. Fellenius
Session 2, Deep Foundation without Soil Excavation, has attracted no fewer than 22 papers dealing with subjects from soil improvement by grouting, injection, and deep mixing techniques through vibrofl
Jan 1, 1994
-
Experimental Study Of Axial Bearing Capacity Of Half-Closed End Steel Pipe Piles ? Synopsis
By Y. G. Qin
In this article an experimental study of axial bearing capacity of half-closed steel pipe pile installed at BKSH dock is presented. In comparison with open and closed end piles, half-closed end pile i
Jan 1, 2010
-
Challenges in Managing an Aging Infrastructure, Lessons Learned from a Near Miss at the Lake Manatee Dam
By Glen R. Andersen
"Two of the greatest challenges we face in managing our aging infrastructure are to perform accurate condition assessments and to realistically predict the risk of non-action. The aim of this paper is
Jan 1, 2017
-
Construction And Design Of Drilled Shafts In Hard Pinnacle Limestones
By Dan A. Brown
The following paper was written by Dr. Dan A. Brown, P.E. Brown is an Associate Professor at Auburn University's Department of Civil Engineering. The paper was originally presented at a FHWA&apos
Jan 1, 1991
-
Piling The Gateway To Europe
By Howard Roscoe
Linking Ashford International Station to the new Channel Tunnel Rail Link required over 5000 rotary bored and CFA (continuous flight auger) piles to form tunnel walls and viaduct foundations and to su
Jan 1, 2002
-
Influence of Presence of Overlaying Sand on Rock Socket Length of Bored Pile
By Priyadharshini M. R., Premalatha K
"Abstract With the development in the construction of heavily loaded structures, the necessity of pile foundations has increased. For the transfer of heavy loads, it is mandatory that the piles need t
Jan 1, 2014
-
Instrumented Driven Steel Tube Piles At Canary Wharf, London
By A. R. Gaba
Phase I of the Canary Wharf development in London's docklands involves the construction of six fifteen storey buildings located predominantly over water of the West India Docks. The buildings are
Jan 1, 1989