Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Murphy's Law And The Pile Prediction Event At The 2002 ASCE GeoInstitute's Deep Foundations Conference

    By Bengt H. Fetlenius

    The "Pile Prediction Event" at the ASCE GeoInstitute's Deep Foundation Conference in February 2002 involved prediction of drivability and capacity of three 14m long, 324mm diameter, closed-toe pi

    Jan 1, 2004

  • DFI
    Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project

    By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim

    "Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the

    Jan 1, 2015

  • DFI
    Impact Of Groundwater Flow On Design Of Open Underground Excavation

    By Heman Manchanda, Sandeep Sharma

    Several infrastructure projects are in various stages of construction and planning in India and almost all of them involves open ground excavation extending to varying depths. These structures are gen

    Sep 1, 2022

  • DFI
    Jet Grouted Foundation for 57-Story Tower

    By Robert Alperstein, Nidal AbiSaab, Joe Pastore

    "This paper describes the design and construction aspects of the foundation support for a 57-story building currently under construction in lower Manhattan. The site is located near the East River wit

    Jan 1, 2016

  • DFI
    Improvements in Deep Compaction Using Vibratory Pile Hammers (a877ad8a-6d27-4e33-a419-f0edb9bac870)

    By Dennis Nottingham

    "Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971, L.B. Foster Company per

    Jan 1, 2005

  • DFI
    Vibrations Caused by Pile Driving (bb4f9935-841f-4be3-bb1b-f95875d26e25)

    By K. Rainer Massarsch

    "Part 1 of 2 By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenINTRODUCTIONConstruction activities, such as driving of piles and sheet piles, soil compaction or excavation generate noise an

    Jan 1, 2004

  • DFI
    Rock Socket Capacity Certification Using the Point Load Index Test

    By Burt G. Look, David W. Lacey

    "Certification of foundation capacity during the construction phase is often assessed by strength or weathering state descriptors based on visual observations. This case study used the Point Load Inde

    Jan 1, 1900

  • DFI
    Innovative Soe Solutions For Shaft Construction: Getting To Depth With Diaphragm Walls At Westerly Storage Tunnel

    By Ryan Sullivan, Lisa Smiley, Jewels Stover

    The Westerly Storage Tunnel (WST) Project is part of Project Clean lake, the North East Ohio Regional Sewer Dist years. When completed in 2020, WST will be nearly 2 miles of 25-ft diameter tunnel 200-

  • DFI
    CPT Methods for Helical Pile Design

    By Howard A. Perko, Margaret Dring, Gerald Verbeek, Scott Slaughter

    Helical piles have become a widely used deep foundation system in recent years due to their many inherent advantages. The cone penetration test (CPT) is commonly used in geotechnical practice to evalu

    Sep 8, 2021

  • DFI
    Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity Profiling

    By Garland Likins, Gray Mullins, George Piscsalko

    "Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or

    Jan 1, 2016

  • DFI
    Performance Based Excavation Support Design For Challenging Urban Site Geometry In Toronto, Canada

    By Shawna Munn, Carol Dounitch, Erika Acton

    The EQ Bank Tower, a 24-storey office tower with 4 levels of underground parking, is currently under construction at 25 Ontario Street in the downtown core of Toronto, Canada. The tower geometry requi

    Oct 1, 2022

  • DFI
    Quality Assessment Of Drilled Shaft Foundations At The Jane Byrne Interchange

    By Travis Coleman, Elvis Ishimwe

    Currently, more than 400 drilled shafts have been constructed by various contractors at the I-90/94 and I-290 Jane Byrne (Circle) Interchange, located near downtown Chicago, Illinois. Cross-Hole Sonic

  • DFI
    A Resilience Approach for Design of Earth Retaining Systems with Application on MSE Walls

    By George Gazetas, Sissy Nikolaou, Fani Gelagoti, Irene Georgiou, Rallis Kourkoulis

    "The need to shift geotechnical design from a “factor of safety” to a “performance based” design (PBD) approach has increased rapidly in the past years following examples from structural engineering.

    Jan 1, 2016

  • DFI
    Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 Walton

    By Joel B. Dellaria, Justin R. Lewis

    "No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca

    Jan 1, 2017

  • DFI
    Consideration on Liquefaction Resistance of Ground Improved by the Sand Compaction Pile Method

    By Kazunori Matsushita, Masaru Sakakibara, Kenji Harada, Naotoshi Shinkawa, Mitsuo Nozu

    The Sand Compaction Pile (SCP) method has been widely used as a typical countermeasure against liquefaction in Japan, and its effectiveness has been confirmed in many case histories of damages caused

    Jan 1, 2017

  • DFI
    Three-Dimensional (3D) Limit Equilibrium Method (LEM) Comparative Study of a Landslide Case Study Supported with Piles

    By Terence Ma, Seok hyeon Chai, Jeff Lam, Thamer Yacoub, Brigid Cami, Sina Javankhoshdel

    The Limit Equilibrium (LE) analysis of pile-supported geotechnical structures normally assumes a constant shear force for the pile instead of considering the non-linear capacity of the pile which is r

    Sep 8, 2021

  • DFI
    Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple Technologies

    By Dan Mahrt

    "In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti

    Jan 1, 2016

  • DFI
    Anchored Double-Tier Retaining Walls on Sloping Embankment

    By Chu E. Ho, Paul Napoli

    A new waterfront park was developed on Long Island in close proximity to the East River and Newtown Creek. The existing ground consisted of fill over soft organic clay, medium dense silty sand, glacia

    Jan 1, 2019

  • DFI
    Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design Parameters

    By Martin D. Larisch

    The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.

    Nov 1, 2022

  • DFI
    An Analysis of LRFD for Helical Anchors

    By Ronaldo Luna, Donald Deardorff

    "The use of load and resistance factor design (LRFD) is well documented since the 1960s for structural applications when it was first adopted into the American Concrete Institute Building Code in 1963

    Jan 1, 2009