Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Effects of Overburden Characteristics on Dynamic Failure in Underground Coal Mining

    By Douglas Tesarik, Mark K. Larson, Habte Abraham, Heather E. Lawson

    Dynamic failures, or "bumps", remain an imperative safety concern in underground coal mining, despite significant advancements in engineering controls. While many factors have been empirically linked

    Jan 1, 2016

  • SME-ICGCM
    The Potential of Using Coal Washing Plant Waste As a Backfill in Room and Pillar Mines

    By Anthony (Sam) J. S. Spearing

    Backfilling using coal waste is not a novel means for waste disposal throughout the world; yet, backfilling using a high density (paste) backfill is relatively new, except in Germany and Poland. One o

    Jan 1, 2013

  • SME-ICGCM
    Outcomes of the Landmark Longwall Automation Project with Reference to Ground Control Issues

    By Michael Kelly

    Inertial navigation technology has, for the first time, allowed the position of a longwall shearer to be mapped in three dimensions. Following the success of the technology in highwall mining and succ

    Jan 1, 2005

  • SME-ICGCM
    Application Of DDM To Some Rock Pressure Problems In Japanese Deep Coal Mines

    By Yoshiaki Fujii

    Displacement Discontinuity Method (DDM), which was originally developed by Crouch,S.L., is a powerful tool to calculate mechanical disturbances due to tabular excavations. Three topics on DDM applicat

    Jan 1, 1992

  • SME-ICGCM
    RQD from the Barrel to the Box: Weatherability May be a Better indicator for Roof Support Design

    By Kot Unrug

    For the purposes of underground mine design, twelve cores of the Springfield (V) Coal (Pennsylvanian) roof and floor were retrieved. Each core was photographed, described fresh in the barrel, and the

    Jan 1, 2003

  • SME-ICGCM
    Multiple Seam Mining Interactions: Case Histories from the Harris No. 1 Mine (b50cab1b-ba36-4377-a652-1d452c62f433)

    By Frank E. Chase

    The Harris No. 1 Mine, located in Boone County, WV, has been longwalling the Eagle Coalbed for over 30 years. Harris has experienced numerous interactions associated with the extensive room-and-pillar

    Jan 1, 2005

  • SME-ICGCM
    Ultra-Close Multiple-Seam Mining ? Analysis and Verification

    By Daniel W. Su

    This paper presents the results of a detailed geotechnical study on the potential multiple seam interaction between the No. 2 Gas (upper) and the Powellton seams, which are separated by an average int

    Jan 1, 2012

  • SME-ICGCM
    25 Years of Progressive in Numerical Modeling for Ground Control ? What Have We Accomplished and Where Do We Go Next?

    By Keith A. Heasley

    Exactly 25 years ago this month (August 12, 1981), IBM introduced the ?Personnel Computer? with a 16 bit operating system called MS-DOS 1.0. Since then, Moore?s Law, which essentially states that

    Jan 1, 2006

  • SME-ICGCM
    Improvement in Roof Support Systems at a New Underground Coal Mine Developed from Open-Cut Highwall in Indonesia

    By Takashi Sasaoka

    Indonesia is the second largest coal exporter to Japan, accounting for about 30 M tons annually. They produced about 150 M tons in 2005, over 99% of which being from open-cut mines [1]. However, t

    Jan 1, 2007

  • SME-ICGCM
    The Forensics Of Underground Roof Falls (c5c31282-77d4-44b1-8aa1-d01534eb267d)

    By Steve Tadolini

    Underground roof falls can have devastating effects on the safety of operations personnel, and equipment, and seriously impact production. Immediate steps are usually taken to danger off and secure t

    Jan 1, 2009

  • SME-ICGCM
    Techniques To Investigate Subsidence Events Over Inactive Room-And-Pillar Mines (f8b483c2-2524-4334-950b-cd6315d7aeaa)

    By Yi Luo

    Subsidence events occurred over inactive room and pillar (R&P) mines, including abandoned mines or sealed portions of active mines, are classified as unplanned subsidence because of their timing and d

    Jan 1, 2009

  • SME-ICGCM
    The Evaluation of Empirical Coal Pillar Strength Formula Based on Uncertainty Criterion

    By Navid Hosseini

    Several empirical equations to estimate coal pillar strength have been presented in academic studies. The development processes of these equations are similar and are usually obtained by fitting the m

    Jan 1, 2012

  • SME-ICGCM
    Rockburst Prevention in the German Coal Industry

    By Rudiger Baltz

    The sudden failure of bodies of rock is a serious problem commonly experienced in the international mining industry. These explosive releases of energy are referred-to as ?bumps?, ?outbursts? and ?roc

    Jan 1, 2008

  • SME-ICGCM
    Effect of Roof Convergence on Stability of Underground Mine Seal Subjected to Explosion loading - Numerical Approach

    By Rajagopala Reddy Kallu

    After the Sago and Darby No. 1 mine incidents, the new regulatory standards for the design of mine seals in underground coal mines of the United States require the mine seals to withstand higher explo

    Jan 1, 2007

  • SME-ICGCM
    A Mine Evaluation Protocol Using Applied Rock Mechanics Techniques

    By Gary B. Petersen

    The author has developed a seven-step process called the Applied Rock Mechanics (ARM) Protocol that the author has used to solve numerous roof stability problems in mines throughout North America sinc

    Jan 1, 2012

  • SME-ICGCM
    A Management System to Develop Occupational Health & Safety in Ground Control Operations of Underground Mines

    By Kazem Oraee

    Falls of ground have historically been the main cause for fatalities in underground mines. Although recent advances in technology have reduced the number of such accidents, when failures occur they us

    Jan 1, 2012

  • SME-ICGCM
    Correlation of Acoustic Emission (A.E.) with Physical and Mechanical Properties of Different Types of Rock and Coal Specimens

    By Brijes Mishra

    This paper presents a correlation of acoustic emission (A.E.) with physical and mechanical properties of different types of rock and coal specimens which were tested under aegis of a consultancy proje

    Jan 1, 2006

  • SME-ICGCM
    Geology, Ground Control, and Mine Planning at Bowie Resources, Paonia, CO

    By Collin Stewart

    Bowie Resources maintains one of the most pro-active ground control programs in the U.S. mining industry today. Its guiding philosophy is that everyone in the organization, from the miners at the fac

    Jan 1, 2006

  • SME-ICGCM
    Ground Control in the Underground Coal Mines of Colombia

    By Christopher Mark

    Colombia is 11th largest coal producing nation in the world, and the world?s fifth largest coal exporter. But while most of Colombia?s coal is mined at large modern surface mines located near the Cari

    Jan 1, 2014

  • SME-ICGCM
    Ground Control and Safety Implications of Blast Damage in Underground Mines

    By Stephen Iverson

    The National Institute for Occupational Safety and Health (NIOSH) is currently performing research to help mine operators minimize the amount of loose or damaged rock surrounding a blasted opening. I

    Jan 1, 2007