Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Appendix C – Production Of Coal In 1863, 1864, 1865During the latter part of the Civil War an income tax was placed upon coal and the production of coal in the various collection districts during the life of this tax is shown in the tabulation that fo
Jan 1, 1942
-
Appendix D - Input Data And Computer Output: Simulation Of Methane Flowrate In A Mine EntryBy R. V. Ramani, A. S. C. Owili-eger
List of Numbers
Jan 1, 1974
-
Appendix D - Definitions Of Program VariablesBy C. B. Manula, R. L. Sanford, R. A. Rivell
A - Contains the coordinate pair information for deriving the co¬efficients of the 3rd degree polynomial which approximates the loading station equation. C(N) - Coefficients for third degree approx
Jan 1, 1974
-
Appendix D - Development And Experimental Verification Of Acoustic Seal Checker TheoryBy David A. Monaghan, Kenneth R. Maser, Adi R. Gurdar, D. Randolph Berry
APPENDIX D DEVELOPMENT AND EXPERIMENTAL VERIFICATION OF ACOUSTIC SEAL CHECKER THEORY 1. Introduction In Section 7 of the report the acoustic seal checker concept was described in a general m
Jan 1, 1973
-
Appendix D - Methods For Controlling Respirable Coal Mine Dust From Overburden Drilling At Surface Coal Mines - D.l Engineering ControlsEngineering controls for overburden drilling include dry dust collection systems, wet dust suppression systems, and enclosed cabs [Zimmer and Lueck 1986; Volkwein et al. 1979]. Proper maintenance of t
Jan 1, 1997
-
Appendix D - Shuttle Car - Weighing ExperimentBy Thomas V. Falkie, R. Venkataramani
Hand portable truck axle scales were purchased from the Martin¬Decker Company, Santa Ana, California, for weighing the rubber-tired mine shuttle cars. The scales consisted of two hydraulic load-pads,
Jan 1, 1972
-
Appendix D - USBM Method Program OutputBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
TEST DECK – ALTMETER SURVEY WITHOUT PLTTMETER TEMPERATURE CCRRECTION DATA INPUT
Jan 1, 1977
-
Appendix E - Unsaturated FlowBy Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg
The term unsaturated flow refers to the conditions in which soil pores are filled partially with water and partially with air. This situation constitutes a porous material filled with immiscible fluid
Jan 1, 1986
-
-
Appendix F - Simulation Summaries of the Uranium and Lead MinesBy Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg
Jan 1, 1986
-
Appendix F – Free Read Program For PSU/MVSBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
THIS PROGRAM TRANSFORMS FREE FORHATED BRANCH DATA INTO A FORMAT SUITABLE FOR INPUT TO THE PENNSYLVANIA STATE UNIVERSITY MINE VENTILATION SIMULATOR (PSU/HVS 1. BRANCH RESISTANCES ARE ASSUMED TO H
Jan 1, 1977
-
Appendix H – Computer Output for Initial SimulationBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
MINE VENTILATION NETWORK ANALYSIS
Jan 1, 1977
-
Appendix I - Cost Analysis SystemBy R. V. Ramani, V. T. Burgos, J. A. McClay
Introduction The Cost program was developed to provide the planning engineer with a tool to evaluate the cost implications of the technical mine design decisions. Direct costing methods are empl
Jan 1, 1975
-
Appendix I - The Art of Creating a Financially Rewarding RoyaltyBy Craig Haase
A. Introduction
Jan 1, 2003
-
Appendix I – Addition of Andrews Shafts – Input DataBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
1 11 THIS IS A DIGITAL COMPUTER SIMULATION OF THE VENTILATION SYSTEM OF A MINE LOCATED IN WASHINGTON COUNTY, PENNSYLVANIA. THE VENTILATION SURVEY ON WHICH THIS SIMULATION IS BASED WAS RUN FROM OCT.
Jan 1, 1977
-
Appendix I – Computer Program ListingBy R. V. Ramani, C. B. Manula, A. Owili-Eger
• MINE VENTILATION NETWORK PROBLEM (NATURAL SPLITTING; FIXED • QUANTITY BRANCHES; METHANE SIMULATION; NETWORK TOPOLOGY REVISION; • ABSOLUTE PRESSURE) • NFIXB = NO. OF FIXED QUANTITY BRANCHES • DD(
Jan 1, 1975
-
Appendix II – Model Verification Test IBy R. V. Ramani, V. T. Burgos, J. A. McClay
The data for Test I describes an underground bituminous coal mine operation in a 48 inch seam, with an estimated production rate of 1,056,000 tons per year. The system includes four continuous mining
Jan 1, 1975
-
Appendix II – Part I to Part IV - Each part contains the input, output, and a schematic showing the flows from computer solutionsBy R. V. Ramani, C. B. Manula, A. Owili-Eger
PART 1 THE INPUT AND OUTPUT DATA AND THE MINE SCHEMATIC SHOWING THE FLOWS FROM COMPUTER SOLUTIONS FOR APPLICATION I
Jan 1, 1975
-
Appendix II. Royalty Check ListBy Karl J. C. Harries
"The following is an outline or check sheet of some things that might be looked at when considering the concept of a royalty or royalty provisions. It is not intended as a guide to what is right or wr
Jan 1, 2003
-
Appendix III - Analytical Pressure - Volume Computations For The Mine PrototypeBy R. V. Ramani, C. B. Manula, A. Owili-Eger
ANALYTICAL PRESSURE - VOLUME COMPUTATIONS FOR THE MINE PROTOTYPE A new coal mine is projected, with entrance by slope 1,500 feet long. Nine main entries will be standard for development, five as in
Jan 1, 1975