Search Documents

  • AUSIMM
    Performance of Model Predictive Control on the Crushing Circuit at Sishen Mine

    By E K. Leeka

    Process control limitations have led to suboptimal performance of the crushing section of Sishen MineÆs Jig Plant. The performance of the PID (proportional-integral-derivative) controller implemented

    Aug 12, 2013

  • DFI
    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • IOM3
    Fused-salt electrorefining of bismuth-lead alloys in a recessed-channel cell

    By F. Tailoka

    Bi was electrorefined from alloys containing 10-90 wt% Pb, together with Cu and Ag as minor impurities, in a basic cell and in a recessed-channel cell with 27.5:72.5 NaCl-PbCl electrolyte at 450-470 d

    Aug 1, 1995

  • AUSIMM
    Preconcentration in the pit – size matters

    By T BoBo, D La Rosa, P Cameron

    Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u

    Nov 10, 2020

  • SME-ICGCM
    Probabilistic Analysis of Blasting Impact on Open Pit Stability (95ce6127-68ed-453f-9268-476a1af1dd45)

    By Dae S. Young

    A new probabilistic approach is introduced for slope stability analysis including adverse impact of blasting vibrations. The material strength within a slope area is randomized in this bi-variate join

    Jan 1, 1984

  • DFI
    Engineering The Mansion's Heritage

    By Ken MacLeod

    A development at 83 Queens Road in Melbourne, Australia required construction of a three level basement. The normal geotechnical constraints of excavating adjacent to an existing relatively new buildi

    Jan 1, 2006

  • ISEE
    Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk

    By Enver Alan

    This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the

  • AIME
    Programmed Training for New Employees Slashes Accidents by 50% at US Borax

    In 1973, US Borax & Chemical Corp. began investing three days wages and about $20 in training materials in every new employee before having him report to his first job. The result? Accidents involving

    Jan 4, 1976

  • SME
    A Small Texas Lignite Mine

    By D. B. Buddecke

    Powell Bend Mine, located in Bastrop County, Texas, is owned by the Lower Colorado River Authority (LCRA). The mine is operated under contract by the Powell Bend Mining Company (PBHC), an affiliate of

    Jan 1, 1990

  • SME
    St. Cloud Mining Company’s Stone House Zeolite Mine And New Uses For Clinoptilolite

    By G. S. Austin

    The St. Cloud Mining Company extracts clinoptilolite about 6.5 km south of Winston, Sierra County, New Mexico. Production is about 18,000 mt/year. Natural zeolites are good adsorbents for positively c

    Jan 1, 2002

  • CIM
    Teck Corona Operating Corporation, David Bell Mine, Concentrator Operating Highlights

    By K. Meyer

    "INTRODUCTIONThe David Bell Mine Concentrator started production in April 1985. A staff of twenty-seven people operate and maintain the concentrator. The crew is grouped into the following main areas.

    Jan 1, 1989

  • NIOSH
    RI 5203 Laboratory Results On Testing Mineral-Wool Raw Materials ? Summary

    By H. Kenworthy

    Laboratory experiments were conducted on several materials to determine their suitability for the production of mineral wool. By blending raw charges in the proper proportions and in some instances by

    Jan 1, 1956

  • SME-ICGCM
    Stability of Slopes in Discontinuously Jointed Rock (4d3fd7d1-f3a8-44f5-b86c-03d96a9b1123)

    By T. M. Tharp

    Attempts to analyze the stability of slopes, foundations and underground openings in discontinuously jointed rock have generally assumed full joint continuity or ignored the role of stress concentrati

    Jan 1, 1984

  • AUSIMM
    Pre-concentration – more than bulk ore sorting

    By P Holtham, K Duffy, L Pyle, W Valery

    The mining industry is becoming increasingly focused on pre-concentration due to its potential economic and environmental benefits, particularly for the more complex, low-grade, high throughput operat

    Aug 24, 2022

  • AUSIMM
    Contact Angle Measurements on Lignite Surface

    Contact Angle Measurements on Lignite Surface

    Sep 13, 2010

  • SME
    Geopolymer-Based Concrete To Reduce Carbon Foot-Print Of Construction Industry

    By H. Akbari

    The ordinary Portland cement (OPC) is the key pozzalonic component of the concrete mix, widely used as the construction material world-wide. Billions of tons of OPC are used in the construction indust

    Feb 27, 2013

  • AUSIMM
    Stockton Mine Acid Rock Drainage Remediation û Part 2 - Treatment

    By P Lindsay, J B. Hughes

    Underground and opencast coal mining has been ongoing since 1896 on the Stockton Plateau, West Coast, New Zealand. Acid Rock Drainage (ARD) from historic and current mine workings has had an adverse e

    Jan 1, 2007

  • SME
    Evolving Underground Communication and Connectivity - NAT2024

    By Tom Michaud, Rob Albinger, Ian Turner, Michael Rispin

    Data transmission, communication, tracking, and the connection of equipment such as gas detectors, cameras, and collision avoidance systems in today's tunnel industry are critical pieces of the constr

    Jun 23, 2024

  • CIM
    Comparisons and Estimated Costs of Working a Thick Pitching Coal Seam by Advancing and Downward Method, and by the Proposed Retreating

    By R. H. Watson

    A paper read by J. A. H. Church before the Northern Alberta Branch last February described a method of working thick inclined coal-seams from the dip upwards, with the view to preventing fire risk by

    Jan 1, 1924

  • AUSIMM
    Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic Dam

    By I Thin, L Morizzi, C Seymour, G Mungur

    Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,

    May 9, 2016