Search Documents

  • AUSIMM
    Electrochemistry Measurement, Using Chena Analyser, to Investigate Selective Separation of Pentlandite and Pyrrhotite

    Electrochemistry Measurement, Using Chena Analyser, to Investigate Selective Separation of Pentlandite and Pyrrhotite

    Sep 13, 2010

  • DFI
    Business Benefits Of An Integrated CFA Rig Instrumentation System

    By Jason N. Scott

    CFA piling is a ?blind? construction process that relies heavily on the rig instrumentation to produce sound piles. If the data measured and recorded during construction can be made available to engi

    Jan 1, 2006

  • SME
    Ground freezing resolves complex challenges ahead of SEM tunneling

    By Gregory T. Ziegler

    A complex soil profile and high water table, together with a below-grade active subway tunnel, an above-ground elevated railway line, and the heavily travelled Northern Boulevard all passing above the

    Sep 1, 2013

  • CIM
    Improving Mine/Mill Water Network Design by Reducing Water and Energy Requirements

    By M. Veiga

    "Mining is an energy and water intensive activity. Increasing energy efficiency and reducing water consumption are two of the key requirements in moving toward a more sustainable mining industry. Wate

    Jan 1, 2010

  • AUSIMM
    Software Tools for Open Pit Trucking Studies

    Ledcap Pty Ltd has developed two software tools for assisting in the determination of life-of-mine (LOM) trucking requirements. The first tool generates haul paths and the second calculates truck trav

    Dec 6, 2010

  • SAIMM
    Mining By Rock Cutting In Narrow Reefs

    By K. Moxham, A. Smit, R. Pickering

    Since the early 1970s research has been ongoing to develop a cost-effective way of continuously mining the narrow reef, hard rock, typical of South African gold and platinum mines. In the late1980s it

    Jan 1, 2006

  • AUSIMM
    Removal of Dilute Toxic Anions in Wastewater Using Aluminum Hydroxides Co-Precipitation Method

    Removal of Dilute Toxic Anions in Wastewater Using Aluminum Hydroxides Co-Precipitation Method

    Sep 13, 2010

  • SME
    Machine Learning and Deep Learning Methods in Mining Operations: a Data-Driven SAG Mill Energy Consumption Prediction Application "Mining, Metallurgy & Exploration (2020)"

    By Sebastian Avalos, Julian M. Ortiz, Willy Kracht

    Semi-autogenous grinding mills play a critical role in the processing stage of many mining operations. They are also one of the most intensive energy consumers of the entire process. Current forecasti

    Jun 16, 2020

  • AUSIMM
    Gold Production Costs

    The final criterion of the payability of gold production must necessarily be the cost per ounce. While the cost per ton or per cubic yard is a convenient comparative measure, and a necessary one for o

    Jan 1, 1940

  • CIM
    Achieving Reliability from Data at Cerrejón Coal

    By Gerardo Vargas

    Without an adequate data sample there can be no Reliability Analysis (RA). Without analysis there can be no systematic, verifiable improvement in reliability or in operational economy. A sample is a c

    May 1, 2011

  • CIM
    Ball Charge Dynamics and Liner Wear Simulation

    By Peter Raziszewski

    "A ball charge dynamics model is presented. Simulation results are compared with observed data showing good correlation. Based on the charge dynamics models, a liner wear model is presented along with

    Jan 1, 1997

  • NIOSH
    IC 7164 Mining Methods And Costs Of The Lava Cap Gold Mining Corporation, Nevada City, Calif. ? Introduction

    By John W. Chandler

    The property of the lava Cap Gold: Mining Corporation is in the Nevada City-Grass Valley mining district about 5 miles east of Crass Valley, Calif. At present (July 1940) the plant is mining end milli

    Jan 1, 1941

  • SAIMM
    Engineering Considerations In The Tolerability Of Risk - Mine And Occupational Health And Safety 2010 ? 1 Risk

    By Noel C. Joughin

    In making judgements on tolerable levels of risk in industry, and in all spheres of life, it needs to be understood that every action gives rise to risk. Without risk, nothing can be done. Without ris

    Jan 1, 2011

  • ISEE
    Florida Mining Blast Vibration Study Part 4: Conclusions and Recommendations

    By Tristan Worsey, Nathan Rouse

    Florida legislature allocated funding for the Florida State Fire Marshal to review the applicability of the United States Bureau of Mines (USBM) Report of Investigations (RI) 8507 blast vibration limi

    Jan 1, 2019

  • SAIMM
    Resistance of yielding rockbolts to multiple impact loads

    By D. O’Connor, A. Pytlik, D. J. Corbett

    The resistance of yielding rockbolts to multiple impact loads was tested by means of a drop hammer. The methodology was based on the ASTM D7401-08 standard as well as the requirements specified for ro

    Nov 6, 2023

  • AUSIMM
    Personal Liability - Chartered Practising Status and Best Practice Defences for Pacrim Practitioners

    Whether you are an employee, contractor or consultant working in the mineral industry, there are pressures to deliver the best possible performance. Technical professionals are usually driven by an in

    Jan 1, 1995

  • SAIMM
    Numerical modelling of brittle rock failure using a combined finite-discrete element approach: implications for rock engineering design

    By R. J. Pine, J. M. Rance, J. S. Coggan

    ABSTRACT: The safe design of excavations created in a fractured rock mass is of paramount importance in rock engineering. Depending on the nature of the stress regime acting on an excavation, and the

    Jan 1, 2003

  • CIM
    Tungsten Carbide Drilling at the Sullivan Mine

    By J. W. Reynolds

    Introduction The Sullivan mine, at Kimberley, B.C., is the principal source of ore for the Consolidated Mining and Smelting Company of Canada, Limited. Current production amounts to about 2,500,000 t

    Jan 1, 1951

  • SME
    Historical Dynamics Of One Steel Plant

    By R. L. Summers

    The tremendous engineering advances occurring during this past century are very evident within the boundaries of the Anthracite Section of AIME. The Steelton plant of Bethlehem Steel Corporation, loca

    Jan 1, 1971

  • AUSIMM
    Muck Pile Shaping for Draglines and Dozers at Surface Coalmines

    By M Nagarajan, S Esen

    This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang

    Aug 24, 2015