Search Documents

  • NIOSH
    RI 3043 Use and Value of Air Analyses in Ill. Mines

    By A. U. Miller

    "Ventilation is one of the meet important factors in mining, although until recent years less thought has probably been given to effective ventilation than to any other one phase of mining. In the pas

    Oct 1, 1930

  • CIM
    From Theory to Practice: Designing For Situation Awareness to Transform Shovel Operator Interfaces, Reduce Costs, And Increase Safety

    By E. Onal, C. Craddock, A. Chapman, M. R. Endsley

    ABSTRACT Mining equipment operators must interpret and respond to complex information delivered by technology-centric rather than user-centric systems. The ability to achieve high situation awareness

    Jan 1, 2013

  • NIOSH
    OFR-29-75 A Feasibility Study On The Use Of Foam To Reduce Respirable Dust On A Joy 10cm Continuous Miner

    By T. R. Achenbach

    1. This, the final report to the U. S. Bureau of Mines on the program with the subject title, presents the data obtained from June 29, 1973, to April 20, 1974. 2. Operating in the Illinois #6 coal

    Jan 1, 1974

  • NIOSH
    OFR-100(4)-77 Design And Development Of A Machine Familiarization Trainer For Dragline Operators - Appen A: Program Of Instruction-Modules 10-17 - Appen B: Instructional Time Breakdowns - Phase II Report ? Appen A (Continued) Program Of Instruction

    [Module 10. Internally Cued Operating Contingencies Prerequisite: Modules 1-7 - Estimated Instructional Time: 2.42 hrs. Module Abstract Trainees, using programmed instruction, describe the cues

    Jan 1, 1976

  • SME
    Mixed Face Tunnel Jacking with a Grillage

    By J. E. Bernick, J. Davies

    This paper describes the design and construction of a 22.86 m (75 ft) long jacked tunnel, which was successfully installed, despite difficult mixed face conditions at Metro-North’s Westport Station, i

    Jan 1, 2005

  • SME
    Investigating the Kinetics, Mechanism, and Activation Energy of Limestone Calcination Using Isothermal Analysis Methods "Mining, Metallurgy & Exploration (2021)"

    By Meisam Ghiasi, Mohammadreza Khalesi, Mahmoud Abdollahy

    In the current research, isothermal experiments of kinetic analysis were performed at different temperatures (800–1050 °C) and particle sizes (885 to 10,763 μm) to investigate the calcination kinetics

    Sep 15, 2020

  • SME
    Comparison Of Methods: Dynamic Versus Hydrostatic Testing Of Mine Ventilation Seals

    By M. J. Sapko

    From 2001 to 2007, the Pittsburgh Research Laboratory (PRL) of the National Institute for Occupational Safety and Health (NIOSH) conducted studies to develop alternative methodologies to full-scale ex

    Jan 1, 2008

  • CIM
    Publicity and the Mining Industry

    By C. M. Campbell

    Canadian newspapers from coast to coast, have been, for months, denouncing those articles entitled, "The Whisper of Death," which have been appearing in the Montreal Star. I have not read these articl

    Jan 1, 1923

  • NIOSH
    RI 4168 Mirror Harbor Nickel Deposits, Chichagof Island, Alaska

    By W. M. Traver

    As a direct result of the second World War, consumption of nickel in the United States has increased to such an extent that it has been considered timely to investigate undeveloped deposits of the nic

    Jan 1, 1948

  • SME
    Silica Sand Symposium Draws A Large Crowd In Minneapolis

    By Greg Beckstrom

    On Oct. 1-3, SME?s Twin Cities chapter (SME TC), in cooperation with the University of Minnesota ? Duluth?s Precambrian Research Center (UMD-PRC), cohosted a symposium on silica sand mining and proces

    Jan 1, 2012

  • CIM
    GET: A Function for Preferential Site Selection of Additional Borehole Drilling

    By M. Sharafodin, A. A. Hassanipak

    Abstract - The essential aims of additional borehole drilling are to improve the reliability of grade and tonnage estimates in each reserve class and to increase ore tonnages. The "GET" function prese

    Jan 1, 2004

  • AUSIMM
    Ore Localization by Preconsolidation Structures

    Some major mineral deposits in northern Australia are found in preconsolidation slump disturbances in the sediments.In the retransported marine sediments at Tennant Creek, breccia beds and disturbance

    Jan 1, 1960

  • AIME
    Reservoir Engineering - General - The Heat Efficiency of Thermal Recovery Processes

    By M. Prats

    Most of the information available on the heat efficiency of hot fluid injection processes, both water and steam, has been obtained from calculated temperature distributions in the pay zone and adjacen

    Jan 1, 1970

  • SME
    Removing Diesel Particulate from Underground Mining; A View from the Frontlines

    By Stuart Lister

    "When MacLean Engineering chairman and founder Don MacLean got the first question from a minesite about the possibility of addressing ventilation limits through incremental fleet electrification, he w

    Jan 10, 2018

  • AUSIMM
    Sustainable Development and the Minerals Sector ù Leaving a Lasting Legacy

    By L Chaffey, M Buckland

    The minerals industry has enormous potential to positively contribute to sustainable development and many leading companies have concluded that their long-term success is directly linked to their abil

    Jan 1, 2006

  • NIOSH
    RI 3114 Some Experimental Data on the Influence of Dry and Wet Cleaning on Coke Properties and on Gas and By-Product Yields of Pittsburgh and Mary Lee Coals

    By A. C. Fieldner

    "INTRODUCTION In a previous report3 prepared for the American Gas Association, the influence of washing coal on coke properties and on gas and by-product yields was discussed on the basis of answers t

    May 1, 1931

  • AUSIMM
    Synthetic Rutile from Westport Ilmenite by the Austpac ERMS Process

    The ERMS Process was developed during four years of testwork by Austpac Gold NL to overcome the severe metallurgical problems of the ilmenite atWestport, in the South Island. These deposits have been

    Jan 1, 1993

  • AUSIMM
    Translating the Challenges of Sustainability and Eco-Efficiency into Improved Business Performance at Newmont Operations

    By A J. Minns

    This paper addresses the question: how can the minerals industry remain viable; viable in the sense that we are able to access land for exploration and discovery, we are able to develop and operate mi

    Jan 1, 2004

  • SAIMM
    Impact of the South African Mineral Resource Royalty on Cut-off Grades for Narrow, Tabular Witwatersrand Gold Deposits

    By C. Birch

    "A mineral resource royalty is payment to the holder of mineral rights for the utilization of the mineral resource. In South Africa, this payment is made to the State as holder of the mineral rights (

    Jan 1, 2016

  • AUSIMM
    Opening Supports to Segmental Linings – A Novel Shotcrete Support Solution

    By M Burdick, A Harding, M Krulc, M Chappell

    Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How

    Sep 17, 2014