Search Documents

  • AUSIMM
    Chelopech Mining EAD and Best Available Techniques for Management of Waste Rock in Mining Activities

    Chelopech Mining EAD and Best Available Techniques for Management of Waste Rock in Mining Activities

    Sep 13, 2010

  • SME
    Piedras Verdes: Mexico?s Newest Copper Mine

    By P. J. Rua

    The Piedras Verdes copper mine is a new run-of-mine (ROM), heap leach, solvent-extraction/electrowinning (SX-EW) operation located 21 km (13 miles) north-northwest of the town of Alamos in the state o

    Jan 1, 2008

  • CIM
    Design, Commissioning, and Operation of a Heavy Rare Earth Separation Pilot Plant

    By Jack Zhang, Yunguo Tang, Baodong Zhao

    "Rare earth elements (REEs) have numerous key applications in both traditional and advanced technologies. A shortage of some critical REEs is expected due to the discrepancy between the REE abundance

    Jan 1, 2017

  • DFI
    Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile Construction

    By Andrew L. Peterson

    CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac

    Jan 1, 1997

  • NIOSH
    IC 6956 Coal-Mine Explosions In Ohio, 1874-1936 - Introduction

    By C. W. Owings

    The number of major coal-mine explosions occurring annually in the United States is decreasing, due mainly to fuller recognition of explosion hazards in coal mines and knowledge of methods to prevent

    Jan 1, 1937

  • SAIMM
    Virtual reality applications in the Australian minerals industry

    Virtual Reality (VR) simulations are excellent tools for training, education, simulation of abnormal and dangerous conditions in mines and solving complex problems. Although the concept of VR has been

    Jan 1, 2003

  • AUSIMM
    Commissioning and Operating an Autogeneous Mill at Karowe Diamond Mine

    By N A. Sikwa, L M. van Niekerk, G N. Ndlovu

    In June 2012, Lucara Diamond Corporation officially commissioned its Karowe Diamond Mine in Letlhakane, Botswana. The processing plant circuit incorporates variable speed autogeneous milling, a first

    Jul 15, 2013

  • SAIMM
    Evaluation of some optimum moisture and binder conditions for coal fines briquetting

    By P. Venter, N. Naude

    "Coal mining is a thriving industry and 53% of the coal mined in South Africa is used for electricity generation. Mechanization has made coal mining more efficient, but fines generation has subsequent

    Jan 1, 2015

  • NIOSH
    RI 8275 Instrument To Measure the Initial Deformation of Rock Around Underground Openings

    By Michael J. Beus

    This Bureau of Mines report describes a tunnel stress relaxation gage (TSR) developed to measure initial radial displacement around full-sized underground openings. The TSR technique was shown to b

    Jan 1, 1978

  • TMS
    Elimination of Crystallinity in Fractured Surface of Medium Carbon Low Alloy Steel Plates Through Process Improvement

    By Ram Avtar

    High tensile thick plates (>80mm, weight ~3000 Kg) of medium carbon low alloy steel, when heat treated, manifested higher percentage of crystalline area (>20%) in fractured surface. Such problem was n

    Jan 1, 2009

  • ABM
    Application And Operational Results Of Technological Packages To Eliminate The Human Operation Around The Eaf And Improve The Safety Level

    By Ivo Filipovic

    The steel melting process in an Electric Arc Furnace is a complex set of tasks, coping with highly dangerous hazards as fire, explosions, uncontrolled reactions, hot metal projections and gas or dust

    Aug 17, 2017

  • NIOSH
    OFR-47-77 Reducing The Operator Sound Level Of A Mining Service Vehicle - A Demonstration Project

    By G. G. Huggins

    A demonstration project has been completed to reduce the operator sound level of an underground service vehicle, a personnel dispatch wagon, to go dB(A) or less. The program objective was to implement

    Jan 1, 1975

  • SME
    Adventures in Microtunneling

    By Joseph Clare, Elizabeth Anderson, Mike McGinley, Ron Hines, Judy Cochran

    The South Lake Union Pipelines contract for King County Wastewater Treatment Division and Seattle Public Utilities in Seattle, Washington included three 1.8 m (72-in)inside diameter microtunneled pipe

    Jan 1, 2005

  • CIM
    Long-Range Terrestrial Digital Photogrammetry for Discontinuity Characterization at Palabora Open-Pit Mine

    By M. Sturzenegger

    This paper documents a field survey using long-range terrestrial digital photogrammetry at the Palabora open-pit mine, South Africa, for multi-scale characterization of rock mass discontinuities. Ster

    May 1, 2009

  • AUSIMM
    Washability Characteristics of the Liddell Seam

    CONTENTSSummary.Introduction.Location and Geology.Historical and Exploitation.Part 1. Washability Characteristics of the Liddell.Seam.Foybrook Open Cut, Top Bench.Sampling.Size and Ash Distribution.Wa

    Jan 1, 1954

  • TMS
    Thermodynamic Properties of Equilibrium Phases in the Ag-Cu-S System Below 500 K: Experimental Study

    By Fiseha Tesfaye, Pekka Taskinen

    "Thermodynamics of the equilibrium phase assemblage Ago_9Cul.lS-Cu2-xS-CuS have been studied by an EMF -method. The ternary phase was synthesized from the pure Cu2S and Ag2S in vacuum furnace at high-

    Jan 1, 2014

  • SME
    Dual Concentrate From The Egyptian Baritic Iron Ore

    By F. Hassan, M. A. Arafa

    At El-Gedida iron ore deposits there is a block of about 30million tons neglected due to its higher sulfur content due to the presence of barite gangue minerals. From this bluk by magnetic separation

    Jan 1, 1999

  • NIOSH
    IC 8862 Land Utilization And Reclamation In The Mining Industry, 1930-80

    By Wilton Johnson

    The Bureau of Mines study indicates that land utilized by the mining industry for mineral extraction and processing from 1930 through 1980 amounted to 5.7 million acres, or 0.25 percent of the land ma

    Jan 1, 1981

  • DFI
    Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill Dam

    By Eric M. Klein

    As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad

    Jan 1, 2006

  • NIOSH
    IC 6488 Methods And Costs Of Milling Feldspar At The Minpro Plant, Tennessee Mineral Products Corporation, Spruce Pine, N. C.

    By B. C. Burgess

    This paper, describing the milling practices at the Minpro plant of the Tennessee Mineral Products Corporation, Spruce Pine, N. C., is the first of a series being prepared by the U.S. Bureau of Mines

    Jan 1, 1931