Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Value of Geological Human Capital in the Improvement and Maximisation of Ore Deposit Value – The Kalgoorlie Consolidated Gold Mines Experience

    By D Cooke

    In 2010, Kalgoorlie Consolidated Gold Mines (KCGM) was Australia’s largest gold producer, with total annual production of 788 000 ounces. Of the gold produced by KCGM in 2010, 95 per cent was extracte

    Aug 22, 2011

  • AUSIMM
    The Energy Equation-Oil

    A forecast of energy demand in the non-commu- nist world to the year 1990 is presented with com- ments on the expected effectiveness of conservation efforts in achieving more efficient utilization of

    Jan 1, 1978

  • AUSIMM
    Analysis of Twin Road Tunnels Using Numerical Modelling Techniques

    By D R. Wines

    The design of near-surface civil infrastructure requires detailed consideration of the geological/ geotechnical conditions, excavation geometry and sequence and ground support measures to ensure stabi

    Mar 8, 2011

  • AUSIMM
    Buzwagi Open Pit Study

    By M Sebbag, T Taimre

    Barrick Gold Corporation is proceeding with development of the Buzwagi Mine in the Lake Victoria Greenstone Belt District of Tanzania. The Buzwagi orebody occurs in the Nzega Shear zone within the Gre

    Jan 1, 2007

  • AUSIMM
    Eco Underground Coal Mining Systems for Ultra-Thick Coal Seam – Utilisation of Flyash and CO2 Storage

    By A Hamanaka

    EGAT Mae Moh Lignite Mine in Thailand produces about 16 Mt of lignite annually from open-cut mining. The coal is used to generate 2400 MW of electricity. In the near future, however, the coal must be

    Nov 22, 2011

  • AUSIMM
    Process Implications of Ferrolysis in Hyper-Saline Water

    By J Bean

    Iluka Resources Ltd developed the Jacinth-Ambrosia Mine (Jacinth) in the Eucla Basin during 2009 and 2010. In this arid climate the operation relies on hyper-saline groundwater from a palaeochannel fo

    Oct 5, 2011

  • AUSIMM
    Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western Australia

    By D R. Anstey

    The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from

    Jul 11, 2011

  • AUSIMM
    Hydraulic Fracturing as a Cave Inducement Technique at Northparkes Mines

    By R G. Jeffrey

    The Northparkes, Endeavour 26 orebody is a porphyry copperûgold deposit and comprises a moderately to well jointed rock mass characterised by gypsum veining, the intensity of which decreases with dept

    Jan 1, 2000

  • AUSIMM
    Analysing impact forces and overcoming speed, heat and pressure issues in high capacity belt support applications

    By C T. Portelli

    Belt conveyor transfers are the most likely location for high wear rates and failures. Belt transfers are necessary to change the direction of conveyed material and will remain a part of belt conveyor

    Sep 18, 2023

  • AUSIMM
    Dewatering the Bowmans Trial Pit

    By Waterhouse J. D, Harris B. M

    This paper briefly describes the construction in 1979/80 of a 70m deep trial open pit coal mine near Bowmans S.A. and describes more fully the hydrogeological aspects of the exercise. The primary p

    Jan 1, 1981

  • AUSIMM
    The Approvals Process Through to Mining Lease Grant for a Small-Medium Sized Mining Development: The Mt Sinvit Gold Projects, East New Britain Province

    The Mt Sinivit gold project is located approximately 50km SSW of Rabaul in the Baining Mountains of the Gazelle Peninsula, East New Britain Province. The deposits were discovered in mid- 1983 and fo

    Jan 1, 1997

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    Alluvial Mineral Property Valuation

    Outline of situations when valuations required - from capital raisings and takeovers, stamp duty, rates and capital gains tax, to probate and litigation between joint venture parties. Definition of t

    Jan 1, 1992

  • AUSIMM
    Application of Risk-Cost-Benefit Analysis to Highway Subsidence Due to Mining

    By J Joy, A Bye, G V. Kizil

    This paper demonstrates an application of a recently developed Risk-Cost-Benefit (RCB) Framework to environmental risk management in the mining industry. The environmental application of the RCB Frame

    Jul 10, 2012

  • AUSIMM
    Some Bosh and Hearth Features of Blast Furnaces in India Operating with High Ash Coke

    By Singh BN, Chakravarty PK, Chatterjee LM

    Indian blast furnaces operate with coke gener- ally containing 24 to 28% ash compared to 10-15% ash in coke in most other parts of the world. The operating problems are further aggravated by the hi

    Jan 1, 1981

  • AUSIMM
    Through Seam Blasting – Leighton Wahana Experience

    By S Agdaca

    Leightons is the sole contractor at the Wahana Coal Mine Project (part of the Bayan Group), a multi-seam thermal deposit consisting of 13 coal seams with thicknesses ranging from 20 cm to 500&#16

    Nov 8, 2011

  • AUSIMM
    Critical and Deleterious Metal Deportment in Sulfidic Waste Rocks, Baal Gammon, North Queensland

    By A Parbhakar-Fox, B G. Lottermoser, N Fox

    "Determining the deportment of economic and environmentally significant elements in sulfidic mine materials (eg ore, gangue and waste) requires the use of advanced microanalytical techniques, includin

    Jun 15, 2016

  • AUSIMM
    Mining at the Redross and Mariners Nickel Mines

    By D Will

    RedrossThe Redross orebody averages 1 m wide, has a strike of 50 - 350 m, dips at 55° and has a basalt footwall and an ultramafic hanging wall. The most successful and innovative aspects of mining Red

    Mar 21, 2011

  • AUSIMM
    Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel Mine

    By J Foster

    The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte

    Mar 21, 2011

  • AUSIMM
    Mine Shafts – Planning, Optimising and Constructing

    By D J. Kilkenny

    Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq

    Mar 21, 2011