Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Precision Analysis of Iron Ore Sampling, Preparation and Measurement -Overcoming Deficiencies in the Current Standard ISO 3085

    At Cliffs Natural Resources Ltd (CNR) crushing and shipping sample stations, precisions are estimated for the sampling, preparation and measurement stages of iron ore sampling in accordance with ISO 3

    Mar 1, 2010

  • AUSIMM
    Reducing Bench Turnover Time and Improving Shovel Digability

    By D Kavanagh, C Michaud

    "A continuous improvement initiative was identified at Kalgoorlie Consolidated Gold Mine’s (KCGM) Fimiston open pit with the goal of reducing bench turnover time and increasing shovel digability by im

    Nov 15, 2016

  • AUSIMM
    Steve and Fred would have been mates – a comminution design evolution story

    By D David

    Amongst those whose task it is to design tumbling mills and other comminution machines there is an almost religious divide between devotees of the Bond method and devotees of other methods developed i

    Sep 11, 2017

  • AUSIMM
    Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network Approach

    By F M. Weir, M Fowler

    The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc

    Nov 5, 2014

  • AUSIMM
    The impact of ventilation on demand on impeller fatigue life

    By L Salvestro

    Ventilation on demand (VOD) has been demonstrated to significantly reduce operating costs for ventilation fans, by reducing fan output to meet demand. The most effective method for reducing operating

    Oct 12, 2022

  • AUSIMM
    Controlled Blasting for Civil Construction in an Urban Environment

    By R Domotor

    Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r

    Nov 8, 2011

  • AUSIMM
    Discovery, Geology and Development of the Tom's Gully Gold Mine, Northern Territory, Australia

    The Tom's Gully gold mine is located 90km ESE from Darwin, in the Northern Territory of Australia. The orebody is the auriferous portion of a large sulphide rich quartz reef, hosted in the Wildma

    Jan 1, 1990

  • AUSIMM
    Variability of Gravity Recoverable Gold Values in Relation to Test Sample Size

    By S C. Dominy

    The gravity recoverable gold (GRG) parameter reflects liberated gold or gold-dominated composite particles that can be recovered by gravity separation. Recoveries depend upon mineralogy, in situ parti

    Sep 29, 2013

  • AUSIMM
    Ernest Henry Underground Mine – Access and Support Infrastructure Design

    By P Christen

    The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in

    Mar 21, 2011

  • AUSIMM
    Oversize Reduction Project at the Iron Ore Company of Canada

    By R Pinksen

    The Iron Ore Company (IOC) of Canada Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1 m × 1 m × 1 m) being produced and its subseque

    Jul 11, 2011

  • AUSIMM
    The Simple Facts about Sampling Gold Ores

    By T Day, I G. Robertson, G J. Lyman

    "Various approaches are used in the industry for establishing procedures (sample mass estimation and method of subsampling) for sampling and analysis of gold ores. The key factors that determine the a

    Oct 10, 2016

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011

  • AUSIMM
    Seismic Stability Analysis of Sangan Iron Mine Project Tailings Dam

    By N Ganjian, A Delavar, F Rashidi Nejad

    Iran is one of the most seismically active countries in the world, being crossed by several major fault lines that cover at least 90 per cent of the country. As a result, earthquakes in Iran occur oft

    Jul 27, 2015

  • AUSIMM
    Future Climate – Is Heat Stress a Real Risk for the Future and How Can We Better Manage It?

    By C Killip

    Working in Australia’s harsh climate can have a significant impact on the health, safety and productivity of our teams, but is our working environment expected to be more prone to heat stress in the f

    Nov 4, 2015

  • AUSIMM
    Systems Modelling for Water Management in Mining and Minerals ù Bowen Basin Coal

    By C Hedemann, N Silveste, H Davis, C J. Moran

    For nearly two decades water scientists have been debating the need to use appropriate models for the questions being asked and the data available. This paper puts forward a rationale for a hierarchic

    Jan 1, 2006

  • AUSIMM
    Geology, Grade Control and Reconciliation at the Douglas Mineral Sands Deposit

    The Douglas mineral sands deposit is located 75 km north of Hamilton in western Victoria, Australia. The deposit was discovered in the late 1990s by Basin Minerals Limited and purchased by Iluka Resou

    Jan 1, 2009

  • AUSIMM
    Linking safety factor to probability of failure

    By S M. Gover

    Estimating the probability of failure for embankments is not intuitive. It requires not only an appreciation of the strength of the embankment, but an understanding of the variability and uncertainty

    Jul 23, 2018

  • AUSIMM
    IsaMills™ at Kalgoorlie Consolidated Gold Mines – from the M3000 to the M10 000 and Replacement of the Roasters at Gidji Processing Plant

    By G S. Anderson, N W. McDonald

    "The IsaMill™ was originally developed to address liberation issues at Mount Isa Mines (now Glencore) operations, McArthur River and Mount Isa in the early 1990s. Following on from the industria

    Oct 10, 2016

  • AUSIMM
    Design and Engineering of Flotation Circuits (in Australia)

    By D Mcleod, S Brindley, S Green

    The design and engineering of flotation circuits is driven by numerous inputs, including (in no particular order) testwork outcomes, site considerations, type of separation required, energy sensitivit

    Jan 1, 2005

  • AUSIMM
    Reserve Data for Project Planning

    Efficient project planning during the detailed feasibility to final engineering stages of a project requires not only the accurate prediction of the grade, tonnes and recovery, but their degree of v

    Jan 1, 1987