Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Precision Analysis of Iron Ore Sampling, Preparation and Measurement -Overcoming Deficiencies in the Current Standard ISO 3085At Cliffs Natural Resources Ltd (CNR) crushing and shipping sample stations, precisions are estimated for the sampling, preparation and measurement stages of iron ore sampling in accordance with ISO 3
Mar 1, 2010
-
Reducing Bench Turnover Time and Improving Shovel DigabilityBy D Kavanagh, C Michaud
"A continuous improvement initiative was identified at Kalgoorlie Consolidated Gold Mine’s (KCGM) Fimiston open pit with the goal of reducing bench turnover time and increasing shovel digability by im
Nov 15, 2016
-
Steve and Fred would have been mates – a comminution design evolution storyBy D David
Amongst those whose task it is to design tumbling mills and other comminution machines there is an almost religious divide between devotees of the Bond method and devotees of other methods developed i
Sep 11, 2017
-
Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network ApproachBy F M. Weir, M Fowler
The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc
Nov 5, 2014
-
The impact of ventilation on demand on impeller fatigue lifeBy L Salvestro
Ventilation on demand (VOD) has been demonstrated to significantly reduce operating costs for ventilation fans, by reducing fan output to meet demand. The most effective method for reducing operating
Oct 12, 2022
-
Controlled Blasting for Civil Construction in an Urban EnvironmentBy R Domotor
Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r
Nov 8, 2011
-
Discovery, Geology and Development of the Tom's Gully Gold Mine, Northern Territory, AustraliaThe Tom's Gully gold mine is located 90km ESE from Darwin, in the Northern Territory of Australia. The orebody is the auriferous portion of a large sulphide rich quartz reef, hosted in the Wildma
Jan 1, 1990
-
Variability of Gravity Recoverable Gold Values in Relation to Test Sample SizeBy S C. Dominy
The gravity recoverable gold (GRG) parameter reflects liberated gold or gold-dominated composite particles that can be recovered by gravity separation. Recoveries depend upon mineralogy, in situ parti
Sep 29, 2013
-
Ernest Henry Underground Mine – Access and Support Infrastructure DesignBy P Christen
The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in
Mar 21, 2011
-
Oversize Reduction Project at the Iron Ore Company of CanadaBy R Pinksen
The Iron Ore Company (IOC) of Canada Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1 m × 1 m × 1 m) being produced and its subseque
Jul 11, 2011
-
The Simple Facts about Sampling Gold OresBy T Day, I G. Robertson, G J. Lyman
"Various approaches are used in the industry for establishing procedures (sample mass estimation and method of subsampling) for sampling and analysis of gold ores. The key factors that determine the a
Oct 10, 2016
-
Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushersBy J V. Mehrabani, A R. Sayadi
Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul
Sep 26, 2011
-
Seismic Stability Analysis of Sangan Iron Mine Project Tailings DamBy N Ganjian, A Delavar, F Rashidi Nejad
Iran is one of the most seismically active countries in the world, being crossed by several major fault lines that cover at least 90 per cent of the country. As a result, earthquakes in Iran occur oft
Jul 27, 2015
-
Future Climate – Is Heat Stress a Real Risk for the Future and How Can We Better Manage It?By C Killip
Working in Australia’s harsh climate can have a significant impact on the health, safety and productivity of our teams, but is our working environment expected to be more prone to heat stress in the f
Nov 4, 2015
-
Systems Modelling for Water Management in Mining and Minerals ù Bowen Basin CoalBy C Hedemann, N Silveste, H Davis, C J. Moran
For nearly two decades water scientists have been debating the need to use appropriate models for the questions being asked and the data available. This paper puts forward a rationale for a hierarchic
Jan 1, 2006
-
Geology, Grade Control and Reconciliation at the Douglas Mineral Sands DepositThe Douglas mineral sands deposit is located 75 km north of Hamilton in western Victoria, Australia. The deposit was discovered in the late 1990s by Basin Minerals Limited and purchased by Iluka Resou
Jan 1, 2009
-
Linking safety factor to probability of failureBy S M. Gover
Estimating the probability of failure for embankments is not intuitive. It requires not only an appreciation of the strength of the embankment, but an understanding of the variability and uncertainty
Jul 23, 2018
-
IsaMills™ at Kalgoorlie Consolidated Gold Mines – from the M3000 to the M10 000 and Replacement of the Roasters at Gidji Processing PlantBy G S. Anderson, N W. McDonald
"The IsaMill™ was originally developed to address liberation issues at Mount Isa Mines (now Glencore) operations, McArthur River and Mount Isa in the early 1990s. Following on from the industria
Oct 10, 2016
-
Design and Engineering of Flotation Circuits (in Australia)By D Mcleod, S Brindley, S Green
The design and engineering of flotation circuits is driven by numerous inputs, including (in no particular order) testwork outcomes, site considerations, type of separation required, energy sensitivit
Jan 1, 2005
-
Reserve Data for Project PlanningEfficient project planning during the detailed feasibility to final engineering stages of a project requires not only the accurate prediction of the grade, tonnes and recovery, but their degree of v
Jan 1, 1987