Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines LimitedBy Mercer J. K
Shaft guide reaetions in No. 2 Ore Shaft, Mount Isa Mines Limited, have been reduced to a low order of magnitude by the use of self aligning slippers and spring loaded guide rollers. Before commission
Jan 1, 1961
-
Productivity improvement through collaborative shift planning and trackingBy E Deucker, A White
Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their
Oct 16, 2017
-
Analytical Approach for Stability Analysis of Rock Wedges with Soil-Infilled Joints Formed in a Tunnel RooBy D Oliveira
The use of an equivalent continuum for a rock mass is not always suitable for situations where the failure is structurally controlled by discontinuities as in the case of wedges in the tunnel roof. In
Mar 8, 2011
-
Eliminating Waste Streams on Synthetic Rutile Plants: Treatment of Electrostatic Precipitator Fume by Plant Acid EffluentBy M M. Collisson
The Synthetic Rutile (SR) plant operations, North Capel, produce electrostatic precipitator (ESP) fume and kiln scrubber residue. Typically ESP contains about 18 per cent Ti, 13 per cent Fe, 0.5 per c
Jan 1, 2001
-
Value Impacts of Truck Limited SchedulingBy P G. Doig
Recent drops in commodity prices and economic uncertainty have seen many businesses re-evaluate their operational expenditure to ensure mine profitability. The high capital and operational cost of tru
Jul 16, 2014
-
Analysis of Concentrate Operations at Mount LyellBy Weller K. R, Trahar W. J
The Mount Lyell Company treats some 2.3 million tonnes of ore annually, mined from a number of orebodies on the field. Blended ore is essentially a quartz-sericite schist containing about eight per
Jan 1, 1977
-
Underground Coal Mine Modelling-A Total Systems Simulation ApproachBy Manula C. B
The total systems model for underground oal mining planning and design is a set of omputer programs which encompasses a realis- ic reproduction of the interaction between he geological, environmenta
Jan 1, 1977
-
SIL904 Hong Kong – Drill and Blast Tunnels, Station Blasting Innovations (Double- and Triple-deck Blasting) and Lining SolutionsBy W Curlewis, D Hake, Z Cuthbert
The South Island Line (East) will be a medium-capacity railway covering approximately 7 km from Admiralty Station to South Horizons Station on the south side of Aberdeen Harbour in Hong Kong, with int
Sep 17, 2014
-
A Case History of the Crusher Level Development at HendersonBy W D. Rech, K W. Keskimaki
As an integral part of the conversion from rail haulage to conveyor haulage at Henderson, over six kilometres of drifting and several large complex openings were mined. The deepest of these areas was
Jan 1, 2000
-
State equity in mining and petroleum projects in Papua New GuineaThe Mining Act (1992) and the Petroleum Act (1980) provide for the Government of Papua New Guinea (PNG) to take up equity holdings in mining and petroleum projects. The price the Government pays for i
Jan 1, 1994
-
Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling EnvironmentBy E Corpuz, J Weissman, S Winter, R Evans
The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli
Aug 31, 2015
-
Management of High-pressure Groundwater in Underground Development at Ernest Henry MineBy T Purvis, J Calverd, A-K Greve
The Ernest Henry Mining (EHM) underground mine is situated adjacent to the Great Artesian Basin in North Queensland and within a fracture zone. Underground development commenced in February 2008 and h
Mar 24, 2014
-
Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut MineBy Tilley H. L
The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio
Jan 1, 1989
-
Geometallurgy of the South Middleback Ranges Magnetite Deposit – Predicting Plant Performance from the PitBy D Gerrard, J Begelhole, J Gerber
The Iron Magnet deposit has been mined since 2007 when Arrium (then OneSteel) commissioned the magnetite concentrator to supply feed to the pelletising plant in Whyalla. The concentrate quality requir
Jul 13, 2015
-
Differential Flotation of Copper, Lead, Zinc and Iron Sulphide Minerals at Lake George Mines Pty. Ltd., Captain's Flat, New South WalesBy Nixon J. C, Reynolds C
Three principal features of the ore at Captain's Flat, New South Wales, tend to complicate concentration of the valuable minerals, these being:1. The ore occurs in three more or less separate bod
Jan 1, 1952
-
XCT investigation on the generation of fatigue in autogenous grinding pebbles and its contribution to pre-weakening before fractureBy J Kuva, M Parian, B I. Pålsson
One of the main factors affecting the suitability of an ore for autogenous grinding is the ore’s competency, ie providing enough critical stones for the grinding process. Several experimental test rou
Aug 24, 2022
-
Viscosity evaluation of hot metal containing vanadium and titanium via a novel measurement technology and the thermodynamic analysis methodBy J Wen, P Hou, W Yu, M Hu, Z Jiang, C Bai
Vanadium titano-magnetite (VTM) is one of the important iron ore resources in the world. High viscosity and low fluidity are the basic characteristics of hot metal containing vanadium and titanium dur
Aug 21, 2024
-
Using Dynamic Simulation Throughout a Process Plant's Life CycleUsing Dynamic Simulation Throughout a Process Plant's Life Cycle
Sep 13, 2010
-
The Connection between Evaporites and Iron Oxide-apatite Deposits, Yangtze River, China – Laser Ablation Inductively Coupled Plasma Mass Spectrometry Analysis of Na, S, Cl and Br in Fluid InclusionsBy A Audétat, W T. Li
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Middle and Lower Yangtze River metallogenic belt is one of the most important polymetal
Mar 18, 2015
-
Optimisation of a Stochastic Rock Fracture Model Using Markov Chain Monte Carlo SimulationBy D Wyborn, P A. Dowd
The characterisation of rock fracture networks is an important component of rock engineering applications involving stability assessment or fluid flow analysis. However, the derivation of a reliable r
Sep 26, 2011