  • AUSIMM
    Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines Limited

    By Mercer J. K

    Shaft guide reaetions in No. 2 Ore Shaft, Mount Isa Mines Limited, have been reduced to a low order of magnitude by the use of self aligning slippers and spring loaded guide rollers. Before commission

    Jan 1, 1961

  • AUSIMM
    Productivity improvement through collaborative shift planning and tracking

    By E Deucker, A White

    Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their

    Oct 16, 2017

  • AUSIMM
    Analytical Approach for Stability Analysis of Rock Wedges with Soil-Infilled Joints Formed in a Tunnel Roo

    By D Oliveira

    The use of an equivalent continuum for a rock mass is not always suitable for situations where the failure is structurally controlled by discontinuities as in the case of wedges in the tunnel roof. In

    Mar 8, 2011

  • AUSIMM
    Eliminating Waste Streams on Synthetic Rutile Plants: Treatment of Electrostatic Precipitator Fume by Plant Acid Effluent

    By M M. Collisson

    The Synthetic Rutile (SR) plant operations, North Capel, produce electrostatic precipitator (ESP) fume and kiln scrubber residue. Typically ESP contains about 18 per cent Ti, 13 per cent Fe, 0.5 per c

    Jan 1, 2001

  • AUSIMM
    Value Impacts of Truck Limited Scheduling

    By P G. Doig

    Recent drops in commodity prices and economic uncertainty have seen many businesses re-evaluate their operational expenditure to ensure mine profitability. The high capital and operational cost of tru

    Jul 16, 2014

  • AUSIMM
    Analysis of Concentrate Operations at Mount Lyell

    By Weller K. R, Trahar W. J

    The Mount Lyell Company treats some 2.3 million tonnes of ore annually, mined from a number of orebodies on the field. Blended ore is essentially a quartz-sericite schist containing about eight per

    Jan 1, 1977

  • AUSIMM
    Underground Coal Mine Modelling-A Total Systems Simulation Approach

    By Manula C. B

    The total systems model for underground oal mining planning and design is a set of omputer programs which encompasses a realis- ic reproduction of the interaction between he geological, environmenta

    Jan 1, 1977

  • AUSIMM
    SIL904 Hong Kong – Drill and Blast Tunnels, Station Blasting Innovations (Double- and Triple-deck Blasting) and Lining Solutions

    By W Curlewis, D Hake, Z Cuthbert

    The South Island Line (East) will be a medium-capacity railway covering approximately 7 km from Admiralty Station to South Horizons Station on the south side of Aberdeen Harbour in Hong Kong, with int

    Sep 17, 2014

  • AUSIMM
    A Case History of the Crusher Level Development at Henderson

    By W D. Rech, K W. Keskimaki

    As an integral part of the conversion from rail haulage to conveyor haulage at Henderson, over six kilometres of drifting and several large complex openings were mined. The deepest of these areas was

    Jan 1, 2000

  • AUSIMM
    State equity in mining and petroleum projects in Papua New Guinea

    The Mining Act (1992) and the Petroleum Act (1980) provide for the Government of Papua New Guinea (PNG) to take up equity holdings in mining and petroleum projects. The price the Government pays for i

    Jan 1, 1994

  • AUSIMM
    Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling Environment

    By E Corpuz, J Weissman, S Winter, R Evans

    The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli

    Aug 31, 2015

  • AUSIMM
    Management of High-pressure Groundwater in Underground Development at Ernest Henry Mine

    By T Purvis, J Calverd, A-K Greve

    The Ernest Henry Mining (EHM) underground mine is situated adjacent to the Great Artesian Basin in North Queensland and within a fracture zone. Underground development commenced in February 2008 and h

    Mar 24, 2014

  • AUSIMM
    Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut Mine

    By Tilley H. L

    The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio

    Jan 1, 1989

  • AUSIMM
    Geometallurgy of the South Middleback Ranges Magnetite Deposit – Predicting Plant Performance from the Pit

    By D Gerrard, J Begelhole, J Gerber

    The Iron Magnet deposit has been mined since 2007 when Arrium (then OneSteel) commissioned the magnetite concentrator to supply feed to the pelletising plant in Whyalla. The concentrate quality requir

    Jul 13, 2015

  • AUSIMM
    Differential Flotation of Copper, Lead, Zinc and Iron Sulphide Minerals at Lake George Mines Pty. Ltd., Captain's Flat, New South Wales

    By Nixon J. C, Reynolds C

    Three principal features of the ore at Captain's Flat, New South Wales, tend to complicate concentration of the valuable minerals, these being:1. The ore occurs in three more or less separate bod

    Jan 1, 1952

  • AUSIMM
    XCT investigation on the generation of fatigue in autogenous grinding pebbles and its contribution to pre-weakening before fracture

    By J Kuva, M Parian, B I. Pålsson

    One of the main factors affecting the suitability of an ore for autogenous grinding is the ore’s competency, ie providing enough critical stones for the grinding process. Several experimental test rou

    Aug 24, 2022

  • AUSIMM
    Viscosity evaluation of hot metal containing vanadium and titanium via a novel measurement technology and the thermodynamic analysis method

    By J Wen, P Hou, W Yu, M Hu, Z Jiang, C Bai

    Vanadium titano-magnetite (VTM) is one of the important iron ore resources in the world. High viscosity and low fluidity are the basic characteristics of hot metal containing vanadium and titanium dur

    Aug 21, 2024

  • AUSIMM
    Using Dynamic Simulation Throughout a Process Plant's Life Cycle

    Using Dynamic Simulation Throughout a Process Plant's Life Cycle

    Sep 13, 2010

  • AUSIMM
    The Connection between Evaporites and Iron Oxide-apatite Deposits, Yangtze River, China – Laser Ablation Inductively Coupled Plasma Mass Spectrometry Analysis of Na, S, Cl and Br in Fluid Inclusions

    By A Audétat, W T. Li

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Middle and Lower Yangtze River metallogenic belt is one of the most important polymetal

    Mar 18, 2015

  • AUSIMM
    Optimisation of a Stochastic Rock Fracture Model Using Markov Chain Monte Carlo Simulation

    By D Wyborn, P A. Dowd

    The characterisation of rock fracture networks is an important component of rock engineering applications involving stability assessment or fluid flow analysis. However, the derivation of a reliable r

    Sep 26, 2011