Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Formcoke

    The major incentives for developing continuous processes for the production of formcoke are to achieve a wider range of coals which can be used, greater operating flexibility enabling the production

    Jan 1, 1975

  • AUSIMM
    Contract Considerations and Other Critical Ventilation Aspects in Achieving a New Mine Ramp Up

    By B Broad

    "Establishing ventilation in the early stages of a new mine is an essential step to achieve scheduled outcomes that ultimately drive the financial success of an operation. If the primary ventilation i

    Jul 1, 2013

  • AUSIMM
    Application of Ground Penetrating Radar to Testing Tunnel Integrity

    By J Karlovšek

    Civil engineering infrastructures are often subjected to different types of natural and mechanical activities. These influences may result in serviceability or even in stability of structures due to m

    Mar 8, 2011

  • AUSIMM
    Teach Yourself Economic Evaluation

    By P B. Card

    "The website www.economicevaluation.com.au, which had its origins at the Project Evaluation Conference 2009, provides a free way for industry professionals to teach themselves economic evaluation. At

    Mar 8, 2016

  • AUSIMM
    Thermodynamic modelling of species distribution in AlCl3:BMIC salts

    By M K. Nahian, R G. Reddy

    The thermodynamic model for species distribution in aluminium chloride (AlCl3) and 1-butyl-3- methylimidazolium chloride (BMIC) system was developed. The experimental thermodynamic data, considering a

    Aug 21, 2024

  • AUSIMM
    A Flotation Study for Effective Separation of the Heavy Mineral Sands

    By Takiuchi T, Kurita M, Owada S

    This paper describes the possibility of the application of flotation to the separation of monazite from xenotime and of columbite from ferberite, which have been said to be difficult with generally

    Jan 1, 1993

  • AUSIMM
    Development of the 1 in 5.3 Conveyor Decline at Ridgeway Gold Mine

    Located 350 km west of Sydney and 20 km outside Orange, NSW, lies the Ridgeway Gold Mine û NewcrestÆs flagship Underground Gold Mine. Key to success at Ridgeway has been the fast tracked development o

    Jan 1, 2002

  • AUSIMM
    Design of Grade Control Sampling Programs for Underground Gold Mines

    By S C. Dominy

    Grade control programs aim to deliver economic tonnes to the mill via accurate definition of ore and waste. The foundation of a successful program is high quality sampling supported by geology and a s

    Aug 22, 2011

  • AUSIMM
    The Use of High Pressure Grinding Rolls for Crushing Magnetite

    The paper describes data from test work programs on a range of magnetite ores in Australia and overseas. The analysis looks at the behaviour of material of different sizes fed to the rolls and the cha

    Jan 1, 2009

  • AUSIMM
    Orepass Monitoring and Management at Olympic Dam Mine

    By J Rose, D O’Toole, D Grant

    Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed

    May 9, 2016

  • AUSIMM
    Reaping the First Fruits – Infrared Spectroscopy: the New Standard Tool in BHP Billiton Iron Ore Exploration

    By M Haest, O Dominguez, D Mittrup

    With the current focus in the mining industry on reducing costs, while simultaneously improving ore quality, infrared spectroscopy is a tool that can potentially assist companies to meet both challeng

    Jul 13, 2015

  • AUSIMM
    Implementation of an Advanced Milling and Flotation Control System at Mopani Mufulira Copper Mine

    By B E. De Gee, N Viviers, A Naidoo

    In 2013 the Mopani Copper Mine Mufulira plant in Zambia embarked on a project that was aimed at improving concentrator recoveries. The project commenced with the automation of the milling and flotatio

    Sep 1, 2014

  • AUSIMM
    Open Cut Mining Adjacent to Ephemeral Creek and Spring Systems ù Pilbara, Western Australia

    The Pilbara region, located in the north-west of Western Australia, is significant as the second-largest source of iron ore on the planet. Iron ore mines owned and operated by Pilbara Iron are located

    Jan 1, 2006

  • AUSIMM
    A Geometallurgical Study of the Witwatersrand Gold Ore at Carletonville, South Africa

    By D L. Reid, G Nwaila, J Petersen, J-P Franzidis, Y Ghorbani, M Becker, F C. de Beer, L C. Bam

    Traditional methods of gold extraction have involved comminution and processing via cyanide leaching, all of which are associated with energy, cost and environmental implications. Subsequently, numero

    Sep 29, 2013

  • AUSIMM
    Ventilation Considerations for the New Level Mine Project Access Tunnels

    By E Acu±a, B Prosser, R Alvarez, K Wallace

    This paper describes the ventilation analyses performed for the access tunnels at the New Level Mine project (NLMP) at CodelcoÆs El Teniente operation outside of Rancagua, Chile. This new mine is anti

    Jul 1, 2013

  • AUSIMM
    New Life for the Argyle Diamond Mine – Block Cave Style and Beyond

    By D C. Ford

    The Argyle AK1 orebody was discovered in 1979 and subsequently found to be a large, economically viable reserve with high grade diamondiferous ore. Production began via an open pit operation

    Aug 22, 2011

  • AUSIMM
    HARP Modelling – A New Method of Representing Complex Stratigraphic Deposits

    By P Odins

    Traditionally, stratigraphic deposits have been represented by a large number of gridded surface and product analytical models, related to each other by naming convention. This approach, though suitab

    Aug 22, 2011

  • AUSIMM
    Performance Enhancing Blends – Concentrator Feed Blending at Iron Magnet

    By M Darvall

    Magnetite ore blending has yielded signifi cant performance improvements in OneSteel’s magnetite concentrator. The magnetite concentrator beneficiates magnetite ore from the Iron Magnet Deposit and pr

    Jul 11, 2011

  • AUSIMM
    "Sampling and Test Work Protocol Development for Geometallurgical Characterisation of a Sheeted Vein Gold Deposit"

    By Y Xie, L O’Connor, S C. Dominy

    "Sheeted vein gold deposits are characterised by multiple subparallel veins and free milling gold. In situ heterogeneity of mineralisation results in grade and process parameter variability, which wil

    Jun 15, 2016

  • AUSIMM
    Sustainable Waste Rock Remediation and Revegetation - A Real-World Longitudinal Study Comparing ViroMine Technology to Standard Applications and Doing Nothing

    By D Blair, L Fergusson, G Barros

    "The purpose of this paper is to present the findings of a waste rock remediation program conducted at a gold mine in New South Wales (NSW) over a six-year period. The treatment of waste rock dumps in

    Jul 10, 2012