Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Translating the Challenges of Sustainability and Eco-Efficiency into Improved Business Performance at Newmont Operations

    By A J. Minns

    This paper addresses the question: how can the minerals industry remain viable; viable in the sense that we are able to access land for exploration and discovery, we are able to develop and operate mi

    Jan 1, 2004

  • AUSIMM
    Hearth Behaviour of Port Kembla Blast Furnaces

    By Munive L

    As a result of commissioning No.5 B F, 2670m3 inner volume, in March 1972, the largest B F in Australia; new expertise in maintenance, furnace operating practices and design have been obtained. Th

    Jan 1, 1981

  • AUSIMM
    Fluid Inclusion Study of the Martha Gold-Silver Deposit, Waihi

    By S B. Martin, M P. Simpson, J L. Mauk

    The Martha deposit in Waihi, New Zealand, is a giant adularia-sericite epithermal gold-silver deposit that formed 6.0 to 6.1 Ma, and has produced over 6.4 Moz gold and 39.9 Moz. Fluid inclusion analys

    Jan 1, 2007

  • AUSIMM
    Densimetric Analysis

    Many metallurgical beneficiation and primary concentrating processes rely upon discrimination of products from gangue based on particulate density of the different minerals and combinations of mineral

    Jan 1, 2004

  • AUSIMM
    A Study of the Induration of Iron Ore Pellets

    By Armstrong G. J, Bowling K. McG, Gray C. H

    An experimental induration facility has been developed and used for conducting iso- thermal tests and plant simulation studies on the thermal induration of iron ore pellets. The influence of time, t

    Jan 1, 1973

  • AUSIMM
    Minerals Processing Automation Technology in 2007

    By R A. Medower

    This paper provides a glimpse into the future of minerals processing with emphasis on æAutomation InnovationsÆ for the new millennium, particularly those involving advanced process control and innovat

    Jan 1, 2000

  • AUSIMM
    Community Consultation for the Wimmera Industrial Minerals Project (WIM)

    Although a formal EES was not prepared for the WIM project due it winding down, CRA Ltd has been through the EES and planning scheme amendment process for its demonstration plant. Community consultati

    Jan 1, 1992

  • AUSIMM
    Removal and Recovery of Thallium from Impure Lead

    By Milner E. F

    Thallium is largely volatilized during sintering in the conventional sinter/blast furnace production of lead. The new direct oxygen smelting processes will force the thallium into the bullion, nece

    Jan 1, 1989

  • AUSIMM
    Case Study of Installation of Compact Bucket Wheel Excavators on Ironsands at N.Z. Steel

    By Hogan C. J

    The compact BWE system set up in 1984 to mine ironsand dunes and the underlying ironsand-clay has been an effective high volume produc- tion unit for New Zealand Steel Mining Ltd at the Waikato North

    Jan 1, 1989

  • AUSIMM
    Tailings and Water Management in Wet Climates from Initial Planning to Final Abandonment

    By Brett D

    Tailings disposal and water management are one of the most important environmental issues in mining projects. The nature and the method of disposal of the tailings will determine the long term envir

    Jan 1, 1991

  • AUSIMM
    Pilot Plant Work as an Aid to Process Flow Line Development and Process Choices

    Pilot plant work has played a major role in the process development and design phase of the Iscor Heavy Minerals project. The pilot plant campaigns have been aimed at three process areas, namely prima

    Jan 1, 2001

  • AUSIMM
    Reliability of Pillar Design in Coal Mines Based Upon Existing State of the Art

    The far reaching consequences of designing pillars for coal mines, while retaining concern for safety and economics, are cause for the search for refinement of the existing engineering methods to cont

    Jan 1, 1991

  • AUSIMM
    The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe

    By R Chinamatira

    Several technical and economic factors have to be taken into consideration in developing an optimal mining method. This paper describes some of the important factors learnt during the evolution of the

    Jan 1, 2000

  • AUSIMM
    Considerations for Mechanised Excavation of Rock Tunners

    This paper discusses considerations to be made for the selection of rock tunnelling machines, as opposed to drilling and blasting. A systematic approach is presented in terms of utilizing data frc

    Jan 1, 1987

  • AUSIMM
    The Impact of Raiseboring on a Major Mining Operation

    The capabilities of the three 61R and one 81R Robbins Raiseborers currently in use at Mount Isa are defined. Their applications in the development of ventilation and hoisting shafts, orepasses, esc

    Jan 1, 1974

  • AUSIMM
    Lining of Ball and Rod Mills at Mount Isa - Installation, Design, and Materials

    By Ehlers HK

    Mount Isa Mines Limited has 25 rod and ball mills of various sizes installed in two Concentrators at Mount Isa. A continuing investigation into installation, design and materials of liners for the

    Jan 1, 1978

  • AUSIMM
    The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand

    By T J. McGavin

    This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm

    Sep 17, 2014

  • AUSIMM
    Recent Development in the Cement Manufacturing Process

    By Veal FL

    Technological changes in Portland cement manufacturing during past years have reflected changes in the economics and availability of various types of fuel such as coal, fuel oil and natural gas. Th

    Jan 1, 1976

  • AUSIMM
    Late Cenozoic Volcanic Secessions in Northern New Zealand and Their Relationship to Tectonic Setting

    The Northland Peninsula of northern North Island, New Zealand contains a complex and diverse record of volcanism which reflects rapid tectonic changes during the late Cenozoic. The main volcanic assoc

    Jan 1, 1990

  • AUSIMM
    Ore Characterisation for Mine to Mill Fragmentation

    By A Scott, S Kanchibotla, J Segui

    The æMine to MillÆ concept is not new. In fact, it is the underlying objective of every mine. Unfortunately, in many operations the management structure and reporting systems have created independent

    Jan 1, 2000