Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of Spray Collers for Cooling Deep Coal Mines

    By Hagen G, Uhlig H

    In the Federal Republic of Germany the thermal environment in underground coal mines has deteriorated progressively over the past years. The number and capacity of refrigeration plants have increa

    Jan 1, 1988

  • AUSIMM
    How to Increase LHD Productivity in Hard Rock Mining

    The high maintenance of load-haul-dumps (LHDs) and front end loaders in hard rock affects mine planning with reduced availability and productivity. Intensive study of maintenance costs and availabilit

    Jan 1, 1991

  • AUSIMM
    Platinum Group Metals Recovery from Recycled Autocatalyst by Aqeous Processing

    By Distin P. A

    The extraction of platinum and rhodium from scrapped honeycomb autocatalyst into hydrochloric acid/aluminum chloride/nitric acid solutions is described. Results are given for the effects of leachant

    Jan 1, 1992

  • AUSIMM
    Recent Developments in Blast Furnace Practice

    Developments in furnace construction and design have been very rapid in recent years. Larger furnaces operating at high top pressures with much improved burdens are giving extremely high productio

    Jan 1, 1972

  • AUSIMM
    Underwater Blasting in Landslide Blocked River

    By Dhawan AK

    On 8 July 1993, a landslide of about one million cubic metres of rock blocked the river Satluj near Sanjay Vidyut Pariyojana - Bhaba project and caused flooding into the Bhaba Power House (120 MW) r

    Jan 1, 1995

  • AUSIMM
    Pressure Filtration of Weipa Kaolin

    Extensive reserves of kaolin of the type suitable for use as a high quality paper coating exist on the Weipa Peninsula. In 1986 a commercial processing plant was constructed to produce 100 000 tonn

    Jan 1, 1989

  • AUSIMM
    Computer Simulation of In-Situ Leaching Relevant to the Broken Hill District

    A simulation of the fluid flow, minera- logical and chemical aspects of in situ leaching is being developed for application to the recovery of metals from unbroken, naturally jointed rock. The flui

    Jan 1, 1984

  • AUSIMM
    Blasting and Grinding - An Integrated Comminution System

    By Kristiansen J

    A series of laboratory blasting and ball mill grinding tests have been done on four different types of hard and competent rocks. The results show that exposing these rock types to a higher level of

    Jan 1, 1995

  • AUSIMM
    Economic Influeces on a Base Metals Project

    By Cooper P. G

    I he Electrolytic Refining and Smelting Company (ER&S) has oper- ated a copper smelter at Port Kembla, NSW since 1908. The feasibility of modernising the smelter was recently studied and external inf

    Jan 1, 1988

  • AUSIMM
    Conceptual and Geochemical Modelling at Mt Mackenzie, Central Queensland

    High sulphur volcanic-hosted hydrothermal environments are favourable geological environments for gold mineralisation. Numerous world-class gold deposits including Pueblo Viejo (Dominican Republic),

    Jan 1, 1994

  • AUSIMM
    Reduction of Costs and Environental Impacts in Quarry Rock Blasting

    The operation of quarries for the production of crushed stone and aggregates, depends heavily on rock blasting efficiency, which usually represents a major share of total production costs. After inv

    Jan 1, 1990

  • AUSIMM
    The Break Up of Recoverable Reserves at High Cut-offs

    By Armstrong M, Kleingeld W. J

    Current low prices for many metals mean that deposits have to be mined at high cut-offs (relative to their mean grade), which means that only a small percentage of mining blocks are above cut-off.

    Jan 1, 1995

  • AUSIMM
    Increasing Value in Mining Operations Through the Application of Paste

    By F Palkovitz, S Wilson, F Felipe

    The management of waste from mining operations is a significant aspect of bringing a mineral commodity to final market. The ore beneficiation process and transport/disposal of waste involves significa

    Jan 1, 2009

  • AUSIMM
    Social Responsibility and Obligations to Indigenous Populations

    By Taylor MN

    The influx of an industrial environment into or adjacent to the indigenous society has in the past frequently caused the breakdown of traditional be- haviour and culture, and the generation of socia

    Jan 1, 1978

  • AUSIMM
    Mathematical Modelling of Heat Transfer in Flash-Smelting Burners

    By Taylor R. N

    Flow simulations have been performed on the flash-smelting burners currently used at KNS. This paper presents studies of the heat transfer between gas and particles at the burner exit. Gas and parti

    Jan 1, 1992

  • AUSIMM
    Mathematical Modelling of the Convergence and Vertical Stress Patterns Around a Longwall Panel in New South Wales

    By Pattinaja MA

    Mathematical modelling was carried out to determine the probable convergence and vertical stress patterns around a retreating longwall panel in an underground coal mine in New South Wales. An &apo

    Jan 1, 1986

  • AUSIMM
    Modified Open Cut Equipment in Underground Mining at King Island Scheelite

    By McLaughlin R. G, Brammer R. A J

    King Island Scheelite had been using dealer modified front end loaders for two years when in 1974 it started to increase production. Suppliers were then quoting long deliveries for underground die

    Jan 1, 1977

  • AUSIMM
    The Influence of Bed Structure on Fluid Flow and Heat Transfer in Beds of Iron Ore Pellets

    By Newell R

    The situation in which a gas stream flows through a bed of solids is found in many extractive metallurgy operations. Examples include blast furnace smelting, sintering and pellet firing. In such cas

    Jan 1, 1991

  • AUSIMM
    A Possible Alternative to Hardwood Chock Pieces.

    By Thompson D, Somerville JM, Brock DA

    The development of a softwood alternative to the hardwood chockpiece used to build the waste-edge breakers commonly incorporated in gateroad packs is described. The results of laboratory tests on so

    Jan 1, 1992

  • AUSIMM
    Computerised Geological Information for Mine Planning at Mt ISA Mine

    Copper grades of diamond drill hole and development samples are determined in the core shed logging area at Mount Isa Mine using a Bulk Mineral Analyser. All geological and grade data on the copper or

    Jan 1, 1985