Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Making use of potentially contaminating mine waste in cover design

    By N Jamson, T K. Rohde

    The Mine is an underground zinc (Zn), lead (Pb) and silver (Ag) operation in central New South Wales (NSW). Broadly speaking the Mine has two domains that require rehabilitation, the mine industrial a

    Jul 23, 2018

  • AUSIMM
    Comparison of Diamond Drill Size on Iron Ore Geometallurgical Results

    By T Sua, B Wright

    "BHP Billiton West Australian Iron Ore (WAIO) conducts an extensive geometallurgy program for its iron ore deposits in the Pilbara with the focus on determining the lump yield (the mass percentage of

    Jun 15, 2016

  • AUSIMM
    Justifying Slope Design Risks and Costs

    By N M. Player, R P. Varden, E Jones

    "An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t

    Nov 15, 2016

  • AUSIMM
    Developing an evaluation method for bulk ore sorting

    By S Dykes, R J. McCarthy, B Klein

    There is growing interest in the mining industry on the application of ore sorting. While many are familiar with particle sorting, including the limitations that technology presents (e.g. throughput),

    Nov 10, 2020

  • AUSIMM
    Measuring the Effectiveness of Change through Best Practice Reconciliation

    By G Pattenden, R Hargreaves, P Pettit

    "Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera

    Nov 15, 2016

  • AUSIMM
    High Energy Bulk Explosives and Mine to Mill Focus – the Mt Rawdon Story

    By D Morton, G Wallace

    "Evolution Mining is the sole owner of the Mt Rawdon open cut operation, located 75 km south-west of Bundaberg in Queensland, Australia (Figure 1). It is a massive, volcanically hosted, low-grade gold

    Nov 15, 2016

  • AUSIMM
    MMG Century Mine, A Case Study – Maximising Project Net Present Value Through Targeted Capital Expenditure and Process Optimisation Against a Backdrop of Falling Metal Prices and Feed Grades

    By R Wynn, T J. Akroyd, C Costa

    In an environment of lower zinc prices, falling revenues and reducing zinc feed grades, Century mine implemented a fast-tracked capital upgrade program in less than 15 months. The program was designed

    Sep 1, 2014

  • AUSIMM
    Grinding Circuit Improvements at Evolution Mining’s Edna May Operation

    By D Atheis, S Williams, A Dance, D Taplin

    "Resurrected from its former life at the Big Bell operation, the grinding circuit at Evolution Mining’s Edna May operation in Western Australia has many a story to tell. The task of optimising a plant

    Sep 1, 2014

  • AUSIMM
    Case Study of Iron Ore Value Chain Optimisation

    By J Foo, T Kleinschmidt, B Reynolds, K Kennewell

    The consideration of complex supply chains often highlights multiple system bottlenecks that are localised and dynamic – they shift depending on what variability last influenced the system. Using the

    Jul 13, 2015

  • AUSIMM
    Vertical and inclined raise bore performance at Dugald River mine

    By M Lee, J F. Carswell, G Reitsema

    "The increased costs of underground mining have continually challenged engineers to identify opportunities for alternatives to common approaches to underground development. Considerations to the desig

    Oct 16, 2017

  • AUSIMM
    Secondary Copper Processing using Outotec Ausmelt TSL Technology

    By J Wood

    Steady depletion of the world’s primary copper reserves coupled with a meteoric rise in electronic waste (e-waste) generation has led to secondary copper processing assuming an ever-increasing importa

    Aug 8, 2011

  • AUSIMM
    The Implementation of Snowden's Reconciliation Software - A Case Study from Telfer

    By J Gotte, C Morley, J Froud

    Newcrest Mining LimitedÆs Telfer Mine is a world-class gold and copper producer, situated in the Great Sandy Desert, in the north west of Western Australia. The mine has a number of distinctive charac

    Jan 1, 2007

  • AUSIMM
    Development and Implementation of the CaveCAD Ground Support Module for Cost and Safety Improvements in Block Cave Mines

    By S Talu, E Savage, P Sturm, A van As

    It is estimated that substandard ground support installations and elements cost the Rio Tinto Copper Group millions of dollars between 2000 and 2014. These issues have also created significant safety

    May 9, 2016

  • AUSIMM
    Productive Partnership – Controlling Vibration and Maintaining Critical Electricity Supply

    By M Nagarajan

    Orica Mining Services (Orica) in partnership with Coal and Allied’s Hunter Valley Operations (HVO) has developed a risk management process to maximise mining efficiency whilst controlling vibration an

    Nov 8, 2011

  • AUSIMM
    2020 Vision ù The Manager of the 21st Century

    By E Hondros

    Innovation and Business Skills Australia (IBSA) commissioned The Boston Consulting Group (BCG) to undertake a study into how the role of AustraliaÆs senior managers is likely to change between now and

    Jan 1, 2006

  • AUSIMM
    Sustainable Mining – Indigenous Community Benefit

    By J A. Meadows, M G. Annandale, G Castelain

    Bauxite mining on Cape York Peninsula (CYP) commenced in the early 1960s in the region surrounding the town of Weipa. Rio Tinto Alcan (RTA) operates its bauxite mines on the homelands of 11 Indigenous

    Jun 28, 2016

  • AUSIMM
    Strain-dependent Stiffness of the Weathered Melbourne Formation

    By Z Terzic, M Schult, D Chu, S Macklin

    The East West Link road tunnels are proposed to provide a connection between the CityLink toll road and the Eastern Freeway north of the Melbourne CBD. The alignment passes from Moonee Ponds valley be

    Sep 17, 2014

  • AUSIMM
    Reverse circulation drill commissioning at Lihir open pit to provide data for medium term planning

    By M Akop, G Phillips, L Elliott

    An estimation geologist has many tools in their kit and using the correct one for the job is vital for creating a useful model. Reconciliation is a key step to monitor the performance of a resource mo

    Mar 22, 2022

  • AUSIMM
    Unlocking mine productivity by changing-the-equation on the where, what and when of orebody characterisation

    By S Warden, T Neville, P Leckie

    At its simplest, the classification and characterisation of an orebody is a matter of Where, What and When. Where and with what spatial resolution are measurements taken, What properties are measured,

    Sep 1, 2024

  • AUSIMM
    Scenario Thinking - A Powerful Tool for Strategic Planning and Evaluation of Mining Projects and Operations

    By G Nicholas, S Coward, J Vann, R Wolff, S Jackson, S Moayer, A Bye

    "A new approach to mineral project evaluation is described called Scenario-Based Project Evaluation (SBPE). SBPE incorporates well established æscenario planningÆ and æscenario thinkingÆ approaches, w

    May 24, 2012