Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Understanding Tailings Geochemistry - Continuous Learning and Innovation When Planning for Mine Closure

    By N Kawashima, R St C Smart, A M. Robertson

    This paper focuses on a case study at a base metal mine located in a tropical semi-arid area of Western Australia (WA). It is demonstrated that understanding the geochemical nature of the mine tailing

    Jul 10, 2012

  • AUSIMM
    What Project Managers must Demand from an Economic Evaluation!

    By P Card

    Some project managers accept unsatisfactory economic evaluation modelling because they are unaware of what constitutes good practice. They tend to leave it to the evaluation specialist or others to de

    May 24, 2012

  • AUSIMM
    Mine closure bonds (financial assurances) – the ‘how much?’ conundrum

    By G Byrne, A Bowden

    There is often a difference in opinion about the allocation of risk in the establishment of mine closure bonds or financial assurances. From the State’s perspective, protection is needed to ensure tha

    Jul 25, 2018

  • AUSIMM
    Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel Segments

    By M Wieloch, D Wimpenny, M Chappell

    Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in

    Sep 17, 2014

  • AUSIMM
    Chromite in Beach Sands from Norrie's Head and Stradbroke Island

    By Baker G

    Chromite was recorded among the rare minerals in the natural beach sand concentrates on the coast of Northern New South Wales by Whitworth(l) in 1931, and the commercial production of zircon and rutil

    Jan 1, 1948

  • AUSIMM
    Defining Residual Risk for Successful Mine Closure – a Geochemical Perspective

    By T Baumgartl, B Noller, B Forsyth, J Park, M Edraki, P Pham

    Understanding and quantifying residual risk is the key to the successful closure and rehabilitation of mines. An important aspect of residual risk is predicting the long-term chemistry of mine water a

    Jun 28, 2016

  • AUSIMM
    Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiation

    By P J. Handley

    "Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock

    Sep 20, 2017

  • AUSIMM
    Tunnelling on Northern Beaches Storage Project, Sydney, to Improve Water Quality

    By N Taylor, P Hewitt

    The Northern Beaches Storage Project (NBSP) is part of Sydney Water’s SewerFix™ Program to improve the wastewater system and protect public health and the environment. It was built by the SewerFix Wet

    Sep 17, 2014

  • AUSIMM
    Integrating Sustainability Principles into Mineral Processing Plant Design

    By G Corder

    Even though most major operating companies in the minerals industry have Board-level endorsed sustainability principles and objectives, design engineers typically have no mechanism that allows them to

    Aug 8, 2011

  • AUSIMM
    Implementing condition-based wear surface management

    By P Velletri, N Gaylard

    The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi

    Nov 8, 2021

  • AUSIMM
    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • AUSIMM
    Effect of alkaline roasting conditions on the dephosphorisation of high-phosphorus iron ore

    By A Batnasan

    The main techniques for removing phosphorus as an impurity element in iron ores are physical separation (eg magnetic separation, flotation) and chemical separation (acid leaching, alkaline leaching an

    Aug 22, 2022

  • AUSIMM
    Experimental study and thermodynamic modelling of phase equilibria in the FeO-FeO1.5-SbO1.5-SiO2 system in equilibrium with metal

    By C Zschiesche, alam, A Abadias Llamas, A K

    An integrated experimental and thermodynamic modelling study of the phase equilibria in the FeOFeO1.5- SbO1.5-SiO2 system in equilibrium with liquid Sb and Sb-Ag metal has been undertaken to develop t

    Jun 17, 2024

  • AUSIMM
    Seismic Design of Upstream-raised Tailings Storage Facilities in a Semi-arid, Low-seismicity Setting

    By D A. Williams, P J. Chapman

    Constructing upstream raises with tailings is an accepted and cost-effective practice in Western Australia, where the climatic conditions are favourable, desiccation (and hence overconsolidation) occu

    Jul 27, 2015

  • AUSIMM
    Accurately defining failure geometries and their variability

    By E J. Hancock, K H. B Chu

    Failures within hard rock underground excavations have historically been defined by a depth of failure, estimated in the field or through individual measurements, with a simplified failure geometry; s

    Nov 29, 2022

  • AUSIMM
    Dry concentration of low-grade magnetic iron ores

    By C S. Kelsey, J R. Kelly

    Australia is presently enjoying the fruits of a booming iron ore market. Expectations are that market strength will be supported in the short to medium term by increasing feedstock demands from steel

    Nov 8, 2021

  • AUSIMM
    Reconciliation of Orebody Model Predictions – System and People

    By T Burns, P Savory

    In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data

    Aug 18, 2014

  • AUSIMM
    Discrete vein modelling – implications of a novel geology driven resource estimation methodology for vein hosted mineral deposits

    By J P. van Dijk, M Munro

    Discrete vein modelling presents an innovative geology driven 3D modelling method for quantification of vein hosted mineral deposits, with far reaching potential for critical mineral supply and low im

    Sep 1, 2024

  • AUSIMM
    Climate, safety leadership, and critical risk management in the Australian mining sector

    By A Fern, A Hawkes, o

    This presentation will cover: the importance of high-quality safety leadership; insights from a Safety Climate Survey that includes responses from 7903 employees working at 19 Australian mining organi

    Apr 16, 2024

  • AUSIMM
    Trucking, Rail or Conveyor?

    By R B. Venugopal, P Staples

    The selection of the mode of transport for moving bulk materials is never a simple task as there are various concerns/considerations applied to the selection of the most practical and cost-effective m

    Jan 1, 2005