Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Tunnel Boring Machines in Mines – A?Brief Review of Past Use with a Status Report on Use Today in Australia

    By M Rauer

    With a worldwide growing population the demand for higher living standards, food and the development of new technology is rapidly rising. To allow for a continuous growth, larger quantities of mineral

    Sep 17, 2014

  • AUSIMM
    The Paulsens Transformation – A Shining Light under a Northern Star

    By C Jones

    When the Paulsens operation was poised to be placed on care and maintenance, Bill Beament and the rest of the Northern Star Resources (NSR) team capitalised on the opportunity to send the Ashburton re

    Mar 24, 2014

  • AUSIMM
    Development and Implementation of Major Hazard Management Plans

    By D Hume

    During 2001 the Ridgeway Gold Mine, driven by company initiatives and recent NSW legislation (General Rule 2000), developed and implemented Major Hazard Management Plans to control significant hazards

    Jan 1, 2002

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    Preparation of Mine Fill from Process Plant Tailings

    This paper reports the advances made during the development of underground mine fill technology from circa 1960 to the present and, in particular, indicates where increased input from process plant me

    Jan 1, 2006

  • AUSIMM
    A Review of European Acid Rock Drainage Initiatives

    By B Dold

    Western Europe is a dynamic region, with an emerging co-operation between the individual nations both politically, economically, technically and scientifically. The European Union, today with 15 membe

    Jan 1, 2003

  • AUSIMM
    Cape Lambert Upgrade Project

    By S Russell

    The completion of the $1.1 B Cape Lambert Upgrade project is the second ‘pillar’ in Rio Tinto Iron Ore’s expansion program that has enabled Rio Tinto Iron Ore to effectively double iron ore shipping c

    Jul 11, 2011

  • AUSIMM
    A Multibody Simulation Solution to Analyse Attachment Kinematics of Hydraulic Excavators andáOther Linkages

    By M Dietrich

    The paper describes an efficient method for analysing the different attachment kinematics of excavators and other linkages by taking into account digging forces, the workspace and the stability of the

    Sep 26, 2011

  • AUSIMM
    Scientific Evaluation of Fauna Sensitivity to Blasting

    By D Martin

    The Rio Tinto (Mount Bruce Mining Pty Ltd) Koodaideri Iron Ore Project is located approximately 110 km north-west of Newman in the Pilbara region of Western Australia. During detailed ecological studi

    Aug 24, 2015

  • AUSIMM
    Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia

    By B Chapman, B Gaida, L Drowley

    The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw

    Sep 17, 2014

  • AUSIMM
    The use of Geometallurgical Relationships in Process Route Selection and Mine Plan Optimisation for the Dutwa Nickel Project

    By C Czerny, T Elkington, L Lorenzen

    The Dutwa Nickel Project is a nickel laterite atmospheric leach project located in Tanzania that has been under development by African Eagle Resources plc (2012). A bankable feasibility study (BFS) ha

    Sep 29, 2013

  • AUSIMM
    Two Companies, Three Years, Four Sites, Five Managers and Six Projects in the Life of à

    Leaving the relatively simple life on a uni student and venturing off in to the outside working world is a big step. There are two paths to follow, the æContikiÆ style graduate program where you pick

    Jan 1, 2004

  • AUSIMM
    South-west Ventilation Shaft Project at Newstan Mine

    By D Piason

    Newstan Mine commenced mining operations in 1887 and has since undertaken extensive mining within the Young Wallsend, Great Northern, Fassifern, Borehole and West Borehole coal seams using a range of

    Aug 31, 2015

  • AUSIMM
    The Development of the Aircore Sampling System

    By J M. Wallis

    Heavy mineral sand exploration drilling prior to the 1970s generally utilised open hole auger and air-blast type drilling. However, mining reconciliations were poor and limitations on accuracy and pre

    Oct 5, 2011

  • AUSIMM
    Flotation control using froth stability: past, present and future

    By C Smith, J Cilliers, K Hadler

    Unstable flotation froths, that burst before they overflow, produce no concentrate. Increasing the froth stability to improve recovery is therefore an obvious control strategy. Froth stability can be

    Aug 29, 2018

  • AUSIMM
    Pacific Highway Upgrade from Tintenbar to Ewingsdale (T2E), St Helena Tunnel

    By A M. Mueller

    St Helena tunnel is the centrepiece of the Pacific Highway upgrade from Tintenbar to Ewingsdale, abbreviated and commonly known as T2E. At the deepest point the twin tunnels run 45 m below the ridge l

    Sep 17, 2014

  • AUSIMM
    Tailings governance

    By T Alexieva

    Since the early 1900s the geotechnical community has investigated every significant failure of a tailings dam, improved our knowledge of the behaviour of the tailings storage facilities, developed ana

    Jul 23, 2018

  • AUSIMM
    Mining Reconciliation in Long Hole Open Stopes at George Fisher Mine

    By J J. Grobler

    The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified

    Mar 21, 2011

  • AUSIMM
    The MRMR Rock Mass Rating Classification System in Mining Practice

    By D H. Laubscher

    The in situ rock mass rating system û IRMR - leading to the mining rock mass rating system - MRMR - for jointed rock masses has been used (and abused) in mining operations around the world for the pas

    Jan 1, 2000

  • AUSIMM
    A Revolution in Raise Boring – The Development of the RBR900VF

    By R J. Wood

    Raise drilling (or raise boring) is not a new technology or methodology. The first raise drilling machine was developed by The Robbins Company (TRC) of the USA in 1962. TRC manufactured the first tunn

    Mar 24, 2014