Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Thick Seam Underground Coal Mining By A Slice and Fill MethodAn approach to underground mining of shallow dipping, thick seam coal is proposed in broad outline. The method is based upon overhand slice and fill, with hydraulically emplaced washery refuse as
Jan 1, 1976
-
The Assessment and Management of Coal Recovery in Open Pit MinesScheduling the transformation of in situ coal to run of mine coal and its subsequent beneficiation to a saleable product involves the use of many `parameters' or `adjustment factors'. Thes
Jan 1, 1998
-
The Future Of Thick Seam Mining-A European ViewAmong the various methods of thick-seam mining already well-tried in practice longwall caving with extraction of a single slice, as thick as possible, abandoning the top and/or the bottom coal, se
Jan 1, 1976
-
Engineering for Mining InfrastructureInfrastructure is defined as all those parts of a mining development which are not directly concerned with mining and mineral processing. Infrastructure is of significant and growing importance in
Jan 1, 1974
-
Maintaining and Improving the Economics of Open Pit MiningMaintaining and improving the economics of open pit mining in the future requires understanding of the characteristics of open pit mining that are different to other mining or business activities, des
Jan 1, 1992
-
Operational and Mine Planning Aspects of Continuous Surface Miners in Australian Open Cut Coal MinesThe mine planning and operational aspects of applying Continuous Surface Miner (CSM) technology to Australian coal strip and open cut mines is investigated for both existing and planned deposits. CS
Jan 1, 1989
-
Shamrock Gold Mine Gets into ProductionThe Shamrock Gold Mine has been brought from exploration to production within three years. Mining of the openpit is scheduled for June 1990 with commissioning in April of the 180 000 TPA carbon-in-pul
Jan 1, 1990
-
Gold Mineralisation along the Nam Xiang Fault, Vieng Kham Project, North-east LaosBy M J M Cunningham, M Greentree, J H Liu
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Palaeozoic rocks of north-eastern Laos are an attractive target for gold explorers due
Mar 18, 2015
-
Extreme Reconciliation - A Case Study from Diavik Diamond MineBy K Thompson
The Diavik Diamond Mine is a world-class operation located in an extreme environment 220 km south of the Arctic Circle in CanadaÆs Northwest Territories. The mine has a number of distinctive character
Jan 1, 2006
-
Volcanic Origin of the Proterozoic Itabira Iron Formation, Quadrilßtero Ferrffero, Minas Gerais, BrazilBy D M. Aranha, A R. Cabral
Theories on the origin of the Itabira iron formation (itabirite) in Quadrilßtero Ferrffero (QF), as elsewhere in the world, are restricted by the apparent lack of adjoining volcanic units, severe synd
Jan 1, 2005
-
Internet-Based Remote Machinery ControlBy W R. Hancock
Control of complex machinery through the internet is investigated through the construction of a vehicle prototype developed using off-the- shelf hardware. The vehicle was able to be controlled remotel
Jan 1, 2008
-
The Application of Hydromechanical Mine-scale Modelling for Large Block Caving OperationsBy A Flatten, F Reusch
Recent advances in the disciplines involved in simulating large mining operations provide increasingly precise and accurate methods for the study of cave mechanics; however, in large regional-scale mo
May 9, 2016
-
The Mt Keith OperationThe Mt Keith Operation, 90 kilometres north of Leinster in the north-eastern Goldfields of Western Australia, was commissioned in October 1994. Based on a large tonnage, low-grade nickel sulphide o
Jan 1, 1996
-
Water Systems for Distributing Cooling in Deep South African Gold MinesBy De Carvalho J
The average installed refrigeration capacity on South African gold mines has increased by about eighteen per cent annually for the past 15 years; both the number of installations and their duties h
Jan 1, 1988
-
Process Integration and Optimisation - A Case Study in Productivity ImprovementBy J Col, D La Rosa, W Valery, A Jankovic
Metso Minerals Process Technology Asia-Pacific and South America (MMPT) has been working with operations around the world to increase their efficiency through æMine-to-MillÆ or Process Integration and
Jan 1, 2007
-
Procuring Control and Intelligent Traffic Systems for Major New Build Projects – Avoiding Pitfalls and Maximising ValueBy G M. Taylor
The application of high technology to monitor and control fire life safety, critical functionality in tunnels and underground spaces generally has progressed at an ever accelerating rate over the past
Sep 17, 2014
-
Paleoplacer Potential in the Mid-Proterozoic of the Northern Territory-A Study of the Westmoreland ConglomerateBy Wygralk A, Hallenstein CP
On a world scale, many Mid-Proterozoic fluvial sediments are prospective for low grade, large-tonnage gold deposits. A significant area of the Northern Territory is covered by such Mid-Proterozoic
Jan 1, 1984
-
Managing Environmental Impact Assessments of Heavy Mineral Projects in Africa ù Potential Pitfalls and Proactive PlanningDetermining the environmental consequences of green field projects is becoming an increasingly important component of new projects. Feasibility studies are regarded by potential investors as incomplet
Jan 1, 2001
-
Thermal Degradation of Lump Ore in the Top Shaft of Blast FurnacesBy M Kilburn, A Edenton, M Adam, A Dehghan-Manshadi, R Smyth, L Lu
The blast furnace is a counter current reactor. The counter current principle of the furnace makes it very efficient in transferring the heat and mass required to drive the reduction reactions inside
Aug 12, 2013
-
An Integrated Procedural Approach that Increases Value to Underground Mine PlanningThe value derived by good mine planning is often underestimated as many mines steer their attention to the more immediate and more easily recognised successes made by the day-to-day operational æbush
Jan 1, 2009