Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Thick Seam Underground Coal Mining By A Slice and Fill Method

    An approach to underground mining of shallow dipping, thick seam coal is proposed in broad outline. The method is based upon overhand slice and fill, with hydraulically emplaced washery refuse as

    Jan 1, 1976

  • AUSIMM
    The Assessment and Management of Coal Recovery in Open Pit Mines

    Scheduling the transformation of in situ coal to run of mine coal and its subsequent beneficiation to a saleable product involves the use of many `parameters' or `adjustment factors'. Thes

    Jan 1, 1998

  • AUSIMM
    The Future Of Thick Seam Mining-A European View

    Among the various methods of thick-seam mining already well-tried in practice longwall caving with extraction of a single slice, as thick as possible, abandoning the top and/or the bottom coal, se

    Jan 1, 1976

  • AUSIMM
    Engineering for Mining Infrastructure

    Infrastructure is defined as all those parts of a mining development which are not directly concerned with mining and mineral processing. Infrastructure is of significant and growing importance in

    Jan 1, 1974

  • AUSIMM
    Maintaining and Improving the Economics of Open Pit Mining

    Maintaining and improving the economics of open pit mining in the future requires understanding of the characteristics of open pit mining that are different to other mining or business activities, des

    Jan 1, 1992

  • AUSIMM
    Operational and Mine Planning Aspects of Continuous Surface Miners in Australian Open Cut Coal Mines

    The mine planning and operational aspects of applying Continuous Surface Miner (CSM) technology to Australian coal strip and open cut mines is investigated for both existing and planned deposits. CS

    Jan 1, 1989

  • AUSIMM
    Shamrock Gold Mine Gets into Production

    The Shamrock Gold Mine has been brought from exploration to production within three years. Mining of the openpit is scheduled for June 1990 with commissioning in April of the 180 000 TPA carbon-in-pul

    Jan 1, 1990

  • AUSIMM
    Gold Mineralisation along the Nam Xiang Fault, Vieng Kham Project, North-east Laos

    By M J M Cunningham, M Greentree, J H Liu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Palaeozoic rocks of north-eastern Laos are an attractive target for gold explorers due

    Mar 18, 2015

  • AUSIMM
    Extreme Reconciliation - A Case Study from Diavik Diamond Mine

    By K Thompson

    The Diavik Diamond Mine is a world-class operation located in an extreme environment 220 km south of the Arctic Circle in CanadaÆs Northwest Territories. The mine has a number of distinctive character

    Jan 1, 2006

  • AUSIMM
    Volcanic Origin of the Proterozoic Itabira Iron Formation, Quadrilßtero Ferrffero, Minas Gerais, Brazil

    By D M. Aranha, A R. Cabral

    Theories on the origin of the Itabira iron formation (itabirite) in Quadrilßtero Ferrffero (QF), as elsewhere in the world, are restricted by the apparent lack of adjoining volcanic units, severe synd

    Jan 1, 2005

  • AUSIMM
    Internet-Based Remote Machinery Control

    By W R. Hancock

    Control of complex machinery through the internet is investigated through the construction of a vehicle prototype developed using off-the- shelf hardware. The vehicle was able to be controlled remotel

    Jan 1, 2008

  • AUSIMM
    The Application of Hydromechanical Mine-scale Modelling for Large Block Caving Operations

    By A Flatten, F Reusch

    Recent advances in the disciplines involved in simulating large mining operations provide increasingly precise and accurate methods for the study of cave mechanics; however, in large regional-scale mo

    May 9, 2016

  • AUSIMM
    The Mt Keith Operation

    The Mt Keith Operation, 90 kilometres north of Leinster in the north-eastern Goldfields of Western Australia, was commissioned in October 1994. Based on a large tonnage, low-grade nickel sulphide o

    Jan 1, 1996

  • AUSIMM
    Water Systems for Distributing Cooling in Deep South African Gold Mines

    By De Carvalho J

    The average installed refrigeration capacity on South African gold mines has increased by about eighteen per cent annually for the past 15 years; both the number of installations and their duties h

    Jan 1, 1988

  • AUSIMM
    Process Integration and Optimisation - A Case Study in Productivity Improvement

    By J Col, D La Rosa, W Valery, A Jankovic

    Metso Minerals Process Technology Asia-Pacific and South America (MMPT) has been working with operations around the world to increase their efficiency through æMine-to-MillÆ or Process Integration and

    Jan 1, 2007

  • AUSIMM
    Procuring Control and Intelligent Traffic Systems for Major New Build Projects – Avoiding Pitfalls and Maximising Value

    By G M. Taylor

    The application of high technology to monitor and control fire life safety, critical functionality in tunnels and underground spaces generally has progressed at an ever accelerating rate over the past

    Sep 17, 2014

  • AUSIMM
    Paleoplacer Potential in the Mid-Proterozoic of the Northern Territory-A Study of the Westmoreland Conglomerate

    By Wygralk A, Hallenstein CP

    On a world scale, many Mid-Proterozoic fluvial sediments are prospective for low grade, large-tonnage gold deposits. A significant area of the Northern Territory is covered by such Mid-Proterozoic

    Jan 1, 1984

  • AUSIMM
    Managing Environmental Impact Assessments of Heavy Mineral Projects in Africa ù Potential Pitfalls and Proactive Planning

    Determining the environmental consequences of green field projects is becoming an increasingly important component of new projects. Feasibility studies are regarded by potential investors as incomplet

    Jan 1, 2001

  • AUSIMM
    Thermal Degradation of Lump Ore in the Top Shaft of Blast Furnaces

    By M Kilburn, A Edenton, M Adam, A Dehghan-Manshadi, R Smyth, L Lu

    The blast furnace is a counter current reactor. The counter current principle of the furnace makes it very efficient in transferring the heat and mass required to drive the reduction reactions inside

    Aug 12, 2013

  • AUSIMM
    An Integrated Procedural Approach that Increases Value to Underground Mine Planning

    The value derived by good mine planning is often underestimated as many mines steer their attention to the more immediate and more easily recognised successes made by the day-to-day operational æbush

    Jan 1, 2009