Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Higher Grade Bullion Production at Misima

    Misima Mines Pty Ltd (MMPL) operates a large open cut gold mine on Misima Island in the Louisiade Archipelago in Papua New Guinea. Misima Island lies approximately 600 km east-south-east of Port Mo

    Jan 1, 1994

  • AUSIMM
    Pre-feasibility and Feasibility Studies : A case for Improvements

    The paper reviews some characteristic features of feasibility studies and discusses the need for a wide scope at the pre-feasibility stage. The performance of recent Australian gold mines against th

    Jan 1, 1991

  • AUSIMM
    Operational Geotechnical Engineering at the Ok Tedi Mine, Papua New Guinea

    By Cortes JP

    In a dynamic environment such as the Star Mountains of Papua New Guinea Geotechnical Engineering for the Ok Tedi Project must be described as both interesting and challenging. To be effective a rea

    Jan 1, 1997

  • AUSIMM
    Use of Electronic Detonators at Cracow Gold Mine (cae53c6c-ca7c-4748-be49-2a87f16e60c2)

    By N Strong

    Cracow is a high-grade; low-tonnage underground gold mine located approximately 500 km north-west of Brisbane in Central Queensland. It is a steeply dipping, narrow vein, epithermal gold and silver de

    Jan 1, 2008

  • AUSIMM
    Nickel-Ore Formation in Island-Arc Magmatism, Kamchatka

    By Grinenko VA

    Mineralogical, chemical, and isotopic data have been obtained for samples from 11 volcanoes and 4 kortlandite intrusives on Kamchatka.Similarities and differences in ore-bearing and barren intrusives

    Jan 1, 1990

  • AUSIMM
    Pilot Reactor for Flash Smelting

    By Smith T. N, Wild M. B, Elliot B. J

    The process of flash smelting of nickel sulphide ores, as practised at the Kalgoorlie Nickel Smelter, is described. The critical variables in the operation of this process are identified. The design

    Jan 1, 1991

  • AUSIMM
    Load Transfer Mechanisms in Reinforcing Tendons

    By Tarrant GC

    Cement and resin encapsulated tendons are widely used in the stabilisation of mine roadways. One of the main factors in controlling the efficiency of the reinforcement is the ability of the tendon

    Jan 1, 1992

  • AUSIMM
    Improving Health and Safety Through Conveyor System Training in a Virtual Environment

    By R Engle, R P. McMahan, D A. Bowman, S Schafrik, W Thabet

    Preventing injuries and fatalities related to conveyor system use in the mining industry is important and increases uptime while decreasing lost time. The research presented here is funded by the Nati

    Jan 1, 2008

  • AUSIMM
    Mine Process Simulation ù A Strategic Tool as Well as a Process Optimisation Tool

    Mining is a high risk, high capital and potentially high reward undertaking. A large proportion of the risk comes from a lack of definition of the orebody (which also provides some of the potential) a

    Jan 1, 2003

  • AUSIMM
    Pilot Study on Blast Movement Monitoring at Geita Gold Mine

    By F Mwijage

    "The benefits of measuring blast movement to reduce ore loss and dilution have been recognised by many people for many years and various methods have been used with limited success. Geita Gold Mine is

    Mar 26, 2012

  • AUSIMM
    Pulp Density Soft-Sensor for a Grinding Circuit

    By Torres F, Cerda I, Gimenez P, Gonzalez G, Castelli L

    Slurry density measurement, specially in cyclone feed streams, is fundamental to grinding circuit control. With the purpose of increasing the availability of such a measurement, the design of a soft

    Jan 1, 1995

  • AUSIMM
    Economics of Narrow Vein Mining

    During the past five years there has been a transformation in the operating costs which apply to narrow vein mining. Mechanised methods including sublevel uphole retreat and narrow vein cut and fill a

    Jan 1, 1993

  • AUSIMM
    Comparison of Heap Leach Facility Designs

    By Carlson BL, Overton DD

    This paper compares the designs of heap leach facilities for four precious metal mining projects in the southwestern United States. These four proposed projects are of small-to medium-size relative to

    Jan 1, 1997

  • AUSIMM
    Evaluation of Sampling Methods for Industrial Slurries

    By Patridge A. C

    A pilot scale laboratory investigation of manual slurry sampling methods representative of those used in the minerals industry is described. Samples were taken from slurries made up from silica part

    Jan 1, 1995

  • AUSIMM
    Strategic Development of the Stage 5 Pit at Kidston

    The originally estimated mine life at Kidston (starting 1984) was 12 years. Through a continuing process of re-evaluation and improvement in the operation and by expanding the geological knowledge i

    Jan 1, 1994

  • AUSIMM
    Grindability of Indonesian Coals

    By Yu AB, Azahari HL

    Indonesia has the largest coal reserves in the south-east Asian region. According to estimates from the World Energy Confer- ence, it has reserves of 18 billion mt lignite, 4.4 billion mt sub-bitumi

    Jan 1, 1993

  • AUSIMM
    Telfer Underground - A Difficult Mine and the Associated Problems

    Teller Underground Mine was established to extract ore from the Middle Vale Reef located on the eastern flank of Telfer Main Dome.The mine is located below a 150 m deep open pit operation. The ore bod

    Jan 1, 1993

  • AUSIMM
    Sea Level Changes: Past and Present

    Evidence abounds for sea-level change having occurred throughout geological and recent time. Driven by climatic changes, by cycles of glaciation and deglaciations, and by tectonics the position of sea

    Jan 1, 1990

  • AUSIMM
    The Bisamu and Wunaki mineral occurrences, Lake Kopiago, New Guinea

    Lake Kopiago is located some 71km northwest of Tari in the Southern Highlands Province and lies on the northern edge of the Papuan Fold Belt. The area is underlain by middle Miocene carbonate and fine

    Jan 1, 1994

  • AUSIMM
    Petroleum Policies for an Uncertain Future

    I know the theme of the Congress is "The 21st Century - Mining for Mankind" but I hope you will understand why my address touches upon some near-term issues as well. With the world oil market the

    Jan 1, 1986