Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Practical Method of Handling Methane in a Fully Mechanized High Output Coal Face

    By Yuanping H

    There is a practical method of handling methane in a fully mechanized high output coal face when the methane outflow rate from the face is too high to be handled by ventilation alone, a combined m

    Jan 1, 1988

  • AUSIMM
    Development of Automated Lead Ingot Casting Machines at the Broken Hill Associated Smelters Pty. Ltd.

    By Dawson RD

    For the past 45 years, the casting of refined lead ingots by The Broken Hill Asso- ciated Smelters Pty. Ltd. (B.H.A,S,) at Port Pirie has been mainly by use of manually operated rotary casting whee

    Jan 1, 1975

  • AUSIMM
    Horizontal Cyclone Plant Trials at Bouganville Copper Limited

    By Noreen D

    At Bougainville Copper Limited comparison testwork was conducted between "horizontal" cycloning and conventional vertical cycloning. Horizontal cycloning reduces circulating load and allows increase

    Jan 1, 1988

  • AUSIMM
    The Interaction Between a Tunnel/Cavity and Nearby Structures

    By Abdalla MH

    The deformation resulting from the presence of a tunnel may signifcantly affected, nearby structures and need to be considered during design of both tunnel and structure. The aim of this paper is t

    Jan 1, 1987

  • AUSIMM
    Feasibility Study on Cemented Backfill in Longwall Coal Mine for Surface Subsidence Control

    By Caigen Wang, Wending Ma, Xiexin Mi

    The urgent need for the control of surface subsidence caused by longwall coal mining in densely populated areas of China has led to a feasibility study on the effectiveness of longwall goaf cemented b

    Jan 1, 1998

  • AUSIMM
    Opening Address (c74147d9-e807-4319-b483-6be99c947374)

    This is the seventh major symposium organised by Illawarra Branch over the past five years and the fifth dealing with various aspects of coal. It is clear that all of you here need no convincing that

    Jan 1, 1975

  • AUSIMM
    Making Mines Perform Better

    The procedures for an audit and review process upon which continuous improvement programs may be based are described. The case for regular audits of mining operations to establish performance trends i

    Jan 1, 1992

  • AUSIMM
    The Regulatory Environment for Expert Reports NCSC and ASX Requirements

    I stand here as a financial advisor who has been particularly close to the whole concept of reporting, independence and all the issues that are brought together in Release 149. However, I was asked

    Jan 1, 1989

  • AUSIMM
    Rehabilitation Following Mineral Sand Mining On North Stradbroke Island, Queensland

    North Stradbroke Island is a large sand mass offshore from south east Queensland. Dredging for mineral sands commenced there in 1956 and the rehabilitation discussed in this paper was commenced in

    Jan 1, 1976

  • AUSIMM
    Effect of Confinement on Ground Vibrations Due to Blasting

    By Silitonga M

    Generally, the acceptable parameter for predicting the intensity of ground vibration due to a blast is the amount of explo ive u ed and the distance from the explo ion. A eries of closely controlled t

    Jan 1, 1984

  • AUSIMM
    Fair Hill formation and German Creek Coal Measures in the Goonyella-German Creek District

    Operations at two open cut mines have so far commenced on two out of the five potentially mineable seams in the Fair Hill - German Creek Coal Measures. Due to seam splitting, up to seven mining unit

    Jan 1, 1974

  • AUSIMM
    Interactive Data Exploration

    Interactive data exploration is essential for visualising grade distribution and geological controls on orbodies. Quick and appropriate computer techniques for making daily 'value adding'

    Jan 1, 1998

  • AUSIMM
    Dissolution of Copper, Arsenic, Antimony and Bismuth in Silicasaturated Iron Silicate Slags

    By Jimbo I, Ogawa O

    A series of experiments was carried out to investigate the solubilities of copper, arsenic, antimony and bismuth in silica-saturated iron silicate slags under controlled oxygen partial pressures a

    Jan 1, 1980

  • AUSIMM
    Staffing Arrangements at Queensland Mines LimitedÆs Nabarlek Uranium Treatment Plant

    Queensland Mines Limited operates a small uranium treatment plant at Nabarlek in the Arnhem Land Aboriginal Reserve, some 265 km due east of Darwin. It was the wish of the local Aboriginal people

    Jan 1, 1984

  • AUSIMM
    The Reaction of Ammonium Nitrate with Black Shale at Mt Whaleback

    By Bellairs P, Stewart JC

    On 20 December 1983 at 8.40am blast- hole 57 of Blast RN177 prematurely detonated follwed by a violent deflagration of blast- hole 59 at 10.40am. The blastholes were 380mm diameter drilled in black

    Jan 1, 1986

  • AUSIMM
    Reserve Estimation and Mine Planning - Kidston Gold Mine

    By Tullemans FJ

    This paper describes the general approach to ore reserve estimation and mine planning used at the Kidston Gold Mine. The geological setting and exploration is briefly summarized for background informa

    Jan 1, 1986

  • AUSIMM
    Real-Time Image Analysis of Size and Shape Distributions of Rock Fragments

    An image analysis system has been built which automatically digitizes camera input of rock fragments, analyses the digitised data to determine the sizes and shapes of the rock fragments, and outputs

    Jan 1, 1988

  • AUSIMM
    Technologies Related to Coal Resource Development and International Cooperation in the Pacific

    Now that Japan has achieved a remarkable high growth and joined the ranks of economic powers, she is required to take a stance proper to her new position toward international co- operation among We

    Jan 1, 1987

  • AUSIMM
    Analysis of the Productive System for the Fully-Mechanised Coalface Using Simulated Model of the System Dynamic

    By Lu Fujun, Chen Xuewei

    This paper will analyse the cause-effect relationship of the main factors influencing the production of the fully-mechanised coalface by mainly using the basic system dynamics theory. On the basics

    Jan 1, 1998

  • AUSIMM
    The Role of Water Quality in the Future Industrial Development of the Ross River Basin, Qld

    Within the Ross River Basin, the following types of water were collected and analysed; 19 streams, 24 wells and bores together with 19 samples from the Ross River Dam. The waters were found to con

    Jan 1, 1978