Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Cobaltite in the Broken Hill Lode (03939c9c-b588-4802-a8a6-05e63bc11f8d)

    The detailed work done by Stillwell and Edwards on the occurrence of cobaltite and safilorite-Iollingite at the South Mine, followed by its presentation as a paper to the Institute, calls for, a few n

    Jan 1, 1944

  • AUSIMM
    Safety at home – this is where mine safety starts

    By K Biegaj

    During the author’s 25+ year career in mine management in various parts of the world (mostly in Australia), the author has been privileged to live and work in mining towns (not FIFO) for more than 20

    May 5, 2022

  • AUSIMM
    A case study of technical, social and environmental challenges for a gold project development in Western Turkey

    By R Valenta

    Most developing projects face a range of technical and non-technical challenges, and examination of development histories can potentially provide insights into improved approaches to project developme

    Nov 21, 2018

  • AUSIMM
    Short Description of the Tar-Distillation Plant

    Mond gas-producer tar, and, in fact, all tars obtained from the retorting of coal where steam and air are admitted to the retort, are of entirely different chemical composition to the ordinary coal ta

    Jan 1, 1918

  • AUSIMM
    Safety is all around – state-of-the-art underground mining safety with Mobilaris Mining Intelligence

    By A Prill

    Safety First and zero accidents are the targets most mines in Australia are aiming for, but manual processes and procedures limit the capabilities and response time in emergency situations. Even with

    May 5, 2022

  • AUSIMM
    The Mining Cycle at Gympie Eldorado Gold Mines

    By I Levy

    At our Monkland Mine at Gympie, we operate a deep, narrow vein gold mine using hand held equipment, rail mounted haulage and narrow shafts. This is in many respects the old-fashioned way and is well s

    Jan 1, 1998

  • AUSIMM
    Advancing diversity and inclusivity in the resources sector – a human centred focus on equipment design

    By R Burgess-Limerick, D Lynas

    A number of standards and guidance materials currently exist to assist equipment designers. The ISO process, however, is a formal process and change often lags behind technology development. In some c

    Apr 16, 2024

  • AUSIMM
    A Poorman's Field or a History of Goldmining in East Nelson and Marlborough

    East Nelson and Marlborough, in the northeast of the South Island, contain a wide variety of metallic minerals, including gold, silver, copper, chromite, antimony and scheelite, but no sustained metal

    Jan 1, 1993

  • AUSIMM
    Elouera Colliery Mine Access - Design of a Portal and Tunnel in Soft Ground

    By H Bleuler

    A new portal and access drift was constructed by Concrete Constructions for BHPÆs Elouera Colliery, south of Wollongong.The portal area at the base of the Illawarra Escarpment is in soft colluvium mat

    Jan 1, 1999

  • AUSIMM
    Sampling and Blending to Optimise Revenue ù A Minerals Industry Perspective

    By D McInnes

    Rather than look at the problems associated with sampling, this paper deals with the issue of sampling and blending to optimise revenue û predominantly in the mining industry. An example of the use of

    Jan 1, 2005

  • AUSIMM
    Ensuring an Effective Principal Hazard Management Plan

    By A J. Clough

    There has been an unprecedented rise in the fatality rate in the Australian mining industry over the last few years. The factors behind this rise are not clear; however, it is noted that the increase

    Aug 31, 2015

  • AUSIMM
    Mines That Weren't Quite

    My purpose here today is to introduce an element of democracy into this seminar. In my experience, the mines of Australia can be divided into two categories; those that pay and those that don't.

    Jan 1, 1989

  • AUSIMM
    The Automation of Western Mining Corporation's Olympic Dam Underground Rail Haulage System

    By D Mee

    The Western Mining site at Olympic Dam, near the community of Roxby Downs in South Australia is one of the largest orebodies of its type in the world. It contains known reserves of over 10.6 M tonne o

    Jan 1, 2000

  • AUSIMM
    Mount Isa Copper Mines ù Role of the Mining Engineer

    By B J. Andrew, M R. Daley

    Mount Isa Copper Mines is a world-class mining operation producing approximately six million tonnes of ore per annum. With over 50 years of mining history and over 76 million tonnes of underground res

    Jan 1, 2005

  • AUSIMM
    Orebody Delineation and Reserve Estimation ù Seeking Common Sense from Extensive Investment in Fact

    The organisers of this function have suggested that this presentation should accomplish the following broad goals:set the technical tone for the conference to follow, implying some discussion of the æ

    Jan 1, 2000

  • AUSIMM
    On Bounding Techniques for the Optimum Pit Limit Problem

    By Giannini L. M

    The determination of the "optimum pit limit" of a mine has long been considered as a fundamental problem of mine planning. A number of mathematical techniques have been proposed to solve thi

    Jan 1, 1985

  • AUSIMM
    Risk Transfer in a Hard Insurance Market

    The current insurance market has been brought about by a number of pressures, including: collapsing investment returns; growing losses, both normal and catastrophic; and reserve strengthening. Th

    Jan 1, 2003

  • AUSIMM
    Stability of Metal-Cyanide and Hydroxide Complexes

    The aim of the study was to determine the ranges of stability and instability of the metal hydroxides and metal cyanide species that may be formed during the gold extraction process, Merrill-Crowe gol

    Jan 1, 1997

  • AUSIMM
    Project Management Procedures Adopted for Control of the Engineering Aspects of the Melbourne Underground Rail Loop Project

    By Smith G. A

    The scope and complexity of the Melbourne Underground Rail Loop Project and the budget restraints on the planning, design and construction of the works necessitated sound manage- ment procedures fo

    Jan 1, 1981

  • AUSIMM
    Pyroclastic Flow Deposits, East Zhejiang, Southeast China: Their Characteristics and a Petrogenetic Model (185a22d5-b2c3-4eb3-a463-e7a1dba57899)

    A geologic, petrographic and geochemical study has been performed on the pyroclastic flow deposits in the coastal area of East Zhejiang Province, Southeast China. This study leads to classification o

    Jan 1, 1995