Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Moveable Mineral Processing Miniplant

    By P. Wells, P. Quinn

    "A moveable flotation miniplant was designed and constructed at the research laboratory of Inco Technical Services Ltd. to address the need for flowsheet development with a limited amount of ore (such

    Jan 1, 2003

  • CIM
    Improving Mining & Minerals Plant Performance ? Operations and Maintenance Working Together using new Information Technology

    By Gregory A. Johnson

    Operations and Maintenance departments have long had an adversarial relationship. The widespread evolution and adoption of modern management techniques such as Reliability Centered Maintenance (RCM) a

    Feb 1, 2008

  • CIM
    The Use of Diagnostic Testwork and CIP/CIL Modeling to Improve the Metallurgical Performance at Two IAMGOLD Operations

    "A simple approach to optimizing the performance of an operating carbon in pulp (CIP) or carbon in leach (CIL) plant is presented. It is possible to reproduce the performance of an operating CIP or CI

    Jan 1, 2011

  • CIM
    The Hydrometallurgical Production of Cobalt

    By W. Kunda, J P. Warner

    SHERRITT GORDON Mines Limited annually produce 300,-000 pounds of pure cobalt by processing a nickel-cobalt-copper-iron sulphide ore which is mined at Lynn Lake, Manitoba. The ore (containing 0.04 per

    Jan 1, 1962

  • CIM
    Numerical Modeling of Standard Rock Mechanics Laboratory Tests using a Finite/Discrete Element Approach

    By S. Stefanizzi

    In the present paper, numerical simulations based on a finite/discrete element approach are used to study deformation and failure process during standard rock mechanics. FEM/DEM modeling has been used

    May 1, 2009

  • CIM
    The Importance of Efficient Mass Flow Balance in Crushing and Screening Plants

    By Fernando Romero Lage

    The purpose of this paper is to analyze detailed crushing and screening configurations and the interrelationship as they relate to mass flow balance, operating efficiency, plant availability and final

    May 1, 2010

  • CIM
    Precious-Metal-Bearing Volcanogenic Massive Sulphide Deposits, Campo Morado, Guerrero, Mexico

    By Robert Cluff

    The Campo Morado precious-metal-bearing, volcanogenic massive sulphide district occurs in a Lower Cretaceous felsic volcanic sequence in a northerly trending belt in the Guerrero Terrane in northeaste

    May 1, 2006

  • CIM
    Developments in at-Face/in-Pit Processing Technologies

    By Martin Stoklossa

    Surface mining operations typically require run-of-mine material to be sized for further processing. In-pit crushing facilities serve this need, as stationary, semi-mobile or fully mobile units. Altho

    May 1, 2008

  • CIM
    Control System Performance Assessment-Best Practices

    By Michel Ruel

    "PID loops – also known as base layers or regulatory controls – form the foundation of any plant’s control layer and it is generally accepted that PID loop health has a direct impact on the plant’s bo

    Jan 1, 2011

  • CIM
    Crystallex’s Las Cristinas Gold Project (7d5d7696-3ce9-4e3a-a905-204bcf9d3fae)

    By J. R. Goode

    "The Las Cristinas deposit contains about 10.2 million ounces of gold at a grade of 1.3 g/t. The deposit comprises a layer of fully oxidized saprolite (SAPO), a layer of sulphide-enriched saprolite (S

    Jan 1, 2004

  • CIM
    Evaluation of the Effect of Mixing Method, Sequence and Time on the Properties of Gelfill

    By C. Doucet

    Since 2001, CANMET Mining and Mineral Sciences Laboratories (MMSL) have worked with Falconbridge Ltd. (now Xstrata Nickel) to evaluate trends in the strength development and water retention properties

    May 1, 2007

  • CIM
    Flotation Circuit Design for Adanac Moly Corp using a Geometallurgical Approach

    By Dave Bulled

    "This paper describes the design of a molybdenite flotation circuit using FLEET technology applied to kinetics data produced from laboratory flotation testing and distributed across the blocks of a mi

    Jan 1, 2007

  • CIM
    Development of a Two-Stage Middlings Circuit at Inco’s Clarabelle Mill Part 1: Laboratory Studies

    By Manqiu Xu, Glen Robertson, Steve Wilson, Pete Quinn

    "The middlings circuit, once called the pyrrhotite rejection circuit, at Inco’s Clarabelle mill was a single flotation stage. It used to process a combined feed consisting of the main flotation scaven

    Jan 1, 2000

  • CIM
    Operating Practices at Peñoles Concentrators – Mexico

    By Rodolfo Espinosa

    "Industrias Peñoles, S.A. de C.V. in Mexico, has nine mining operations, six managed by Peñoles (base metal mines) and three managed by Fresnillo plc (precious metal mines). Seven of the operations us

    Jan 1, 2011

  • CIM
    Implementation of Cyanidation by Size Class at Sleeping Giant Mill

    By Gilles Landry, Mohamed Ourriban, Pierre Pelletier, Ahmed Bouajila, Claude Gagnon

    "This paper summarizes the work carried out to develop and implement the gold cyanidation by size class (CSC) process, a novel concept aiming to reduce cyanide consumption.First, the authors will pres

    Jan 1, 2009

  • CIM
    Integration of Sensor Technologies at a Bucket Wheel Excavator for Identification of Material Type and Detection of Interface Layers

    By Martin Kesting

    The world wide growth dynamics and the continuously growing demand for energy, results in increasing energy prices. Looking from this point, the efficient exploitation of fossil fuel deposits has beco

    Oct 1, 2009

  • CIM
    Steel Media Wear: Experimentation, Simulation and Validation

    By Tapiwanashe Chenje, David Hewitt, Peter Radziszewski

    "Steel media wear is a major cost component in mineral processing. In the case of existing operating mill, steel media wear prediction can be used to help compare the performance of steel media from d

    Jan 1, 2009

  • CIM
    Assessing the Returns to Copper Exploration, 1989-2008

    By R. A. Leveille, M. D. Doggett

    "Economic returns for the copper industry have been assessed by building cash flow models for each of the 100 new mines brought into production over the past 20 years. Ninety-one of the 100 new mines

    Jan 1, 2009

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • CIM
    EKATI Safety Guarantee A Conversation for an Extraordinary Possibility

    By Richard Morland

    Some simple and fundamental objectives To challenge and inspire our people to embrace safety as a value ?A stand for safety as a value ?A stand for our people ?A stand by our people ?Prevent harm

    May 1, 2010