Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Rock Mass Characterisation and Stope Design

    By Karina Forster

    Rock mass characterisation is a critical component of effective stope design. Unexpected excessive stope dilution or uneconomic stope sizes can be the result of rock mass characterisation that is not

    May 1, 2006

  • CIM
    On the Surface Permeability of Indiana Limestone

    By P. A. Selvadurai

    This paper presents the results of a research investigation leading to the development of a technique for the measurement of the surface permeability of Indiana Limestone. The tests are conducted on a

    May 1, 2009

  • CIM
    Improved Concentrate Grade and Recovery through the Application of the 6 Sigma Methodology at Noranda Matagami Mill

    By Martin Plante, Denis Hamel, Marie-Pier Bédard, Jeff McLaughlin

    "The results and methodology for the optimisation of the zinc flotation circuit at the Matagami Mill using the 6-Sigma methodology are shown in detail while only the base line and final results are pr

    Jan 1, 2001

  • CIM
    A pilot-scale evaluation of the effect of grind size on the recovery of a UG2 platinum ore

    By Trevor Harris, Martin Harris

    "This paper evaluates the effect of grind size on the flotation performance of a platinum ore from the UG2 reef of the Bushveld Igneous Complex, in South Africa. The study was conducted on the Mintek

    Jan 1, 2002

  • CIM
    Adapting to Ore Characteristics at Lac des Iles Mine

    By Erin N. Legault-Seguin

    The Lac des Iles Mine (LDI) is located approximately 100 km northwest of Thunder Bay, ON. The mine has been in operation since 1993. The initial mine production was 2,300 mtpd and increased to 15,000

    May 1, 2009

  • CIM
    Social Implications of Mining Operations on Nearby Communities - A Case Study

    By Steven Townend

    Mining-related activities have been known to create a challenging operating environment for mining companies located in close proximity to communities. Issues such as noise, vibrations from mining ope

    May 1, 2011

  • CIM
    Low-Grade Cu-Au Deposits: Predicting the Relationship between Copper and Gold Performance in Flotation and the Potential for Gravity Gold Recovery

    By Jan E. Nesset, Phillip J. Mackey, Joo Y. Kim, Giovanni Di Prisco, André R. Laplante

    Understanding the appropriate gold recovery to associate with copper recovery when assessing laboratory testing on porphyry deposits is often complicated by several factors including variable and/or c

    Jan 1, 2005

  • CIM
    Vibration analysis of mining shovels

    By P. N. Saavedra, E. A. Salamanca

    "The maintenance strategies in the mining industry are changing from operative and periodic inspection strategies to a condition-based, predictive maintenance strategy centred in vibration analysis pl

    Jan 1, 2002

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    Improvement in Copper Flotation-In Terms Of Recovery and Concentrate with the Use of Specialty Chemical- Flex 31

    By Robert S. MacPhail, Chilombo Henry, Arnold Kabamba, David Mukelebai, Suresh Thirunagari, Bukali Victor, Yoram Kapai, Chomba Leonard, Kanna Amarasingham

    "FLEX 31 is a chemically enhanced sodium isopropyl xanthate. Developed by Charles Tennant & Co (Canada) Ltd and has shown improved collection properties over SIPX for sulphide minerals flotation. Impr

    Jan 1, 2016

  • CIM
    The Strength and Flow Performance of Glassfill Technology

    By Euler De Souza

    Backfilling in Canadian mines has been practised for close to 100 years and evidence anticipates the application of mine fill technology at an increasing rate during the foreseeable future. The evolut

    Apr 1, 2005

  • CIM
    Cut off Grade Optimizer Integrating Contaminant Constraints

    By Sebastián H. Troncoso

    Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block

    Oct 1, 2009

  • CIM
    Peñoles Mines - Mexico. Lessons learned on Concentrator’s Commissioning and Expansions

    By Rodolfo Espinosa Gómez

    "Industrias Peñoles, S.A. de C.V. – Mining Division, has initiated in the last ten years, six Mining Operations (Bismark, Tizapa, Ciénega, La Herradura, Rey de Plata, and Francisco I. Madero) and it h

    Jan 1, 2004

  • CIM
    CERM3 and its contribution to providing sustainable research for the mining industry

    By M. Veiga, L. Lavkulich, R. Pakalnis, M. Ghomshei, S. Baldwin, J. A. Meech

    "On July 26, 2000, the Canada Foundation for Innovation announced an award of $1.3 M dollars for The Centre for Environmental Research in Minerals, Metals and Materials, CERM3, at The University of Br

    Jan 1, 2003

  • CIM
    The Role of Copper Ions in Sphalerite - Pyrite Flotation Selectivity

    By T. K. Dichmann, J. A. Finch

    "Microflotation, laboratory batch, and in-plant minicell continuous tests were conducted to determine if copper ions not only activate sphalerite but also depress pyrite when the minerals are together

    Jan 1, 2000

  • CIM
    Fundamental Study of Reactive Oily Bubbles in Sulphide Flotation

    By Carolyn Kenney, Jianjun Liu, Zhenghe Xu

    "The flotation of fine particles has been a challenge to scientists and engineers in mineral processing. A novel concept of reactive oily-bubbles as carrier to float fine particles is described in thi

    Jan 1, 2003

  • CIM
    Changes to drill pattern and adequate inter-row delay time improve blasting performance (1255a8ec-f486-4f0e-a99f-bee3df1f60e5)

    By P. H. Oliver

    "The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row del

    Jan 1, 2003

  • CIM
    Changes to drill pattern and adequate inter-row delay time improve blasting performance

    By P. H. Oliver

    The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row dela

    May 1, 2003

  • CIM
    Gold Deposits, Exploration Realities, and the Unsustainability of Very Large Gold Producers

    By H. R. Bullis

    "Abstract- This paper discusses what appears to be a flaw in the current belief, widely held within the gold mining industry and investment community, that the creation of ever-larger gold mining comp

    Jan 1, 2001

  • CIM
    Barrick Goldstrike Grinding Expert System

    By Steve Custer, Tim Kahl, Sue Parker

    "The primary objective of the Barrick Goldstrike expert system is to achieve the desired liberation size for the autoclave circuit while maximizing throughput. In addition, when downstream limitations

    Jan 1, 2001