Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests

    By A. S. Moghaddam

    The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe

    May 1, 2007

  • CIM
    An interpretation of regional northwest-southeast folding in North America with special emphasis on Ontario: Structural and economic implications

    By S. V. Burr

    "A 28-year study of cross folds leads to the conclusion that the northwest-southeast folds recognized in many areas of North America are part of a regional pattern. Detailed examination of over 650 ge

    Jan 1, 1980

  • CIM
    Developing Canada?s North - The New Challenge

    By Jesse L. Duke

    Outline ?Understanding the context ?The Business, political, social and legal environment ?Recipes for Success (three Ps) ?Develop effective Partnerships/relationships ?Plan carefully ?Actively

    May 1, 2006

  • CIM
    The Horne Mine: Geology, History, Influence on Genetic Models, and a Comparison to the Kidd Creek Mine

    By Sergio Cattalani, David J. Kerr, Harold L. Gibson

    Abstract - The Horne mine was truly a world class Cu and Au deposit. Between 1927 and 1989, it produced some 260 t of Au and 1.13 Mt of Cu from 53.7 Mt of ore that averaged 2.22% Cu, 6.1 g/t Au and 13

    Jan 1, 2000

  • CIM
    Lithium: Usage, Demand and the Québec Lithium Mine

    By Charles Taschereau

    The statements made in this presentation contain certain forward-looking statements concerning potential developments affecting the business, prospects, financial condition and other aspects of Canada

    May 1, 2011

  • CIM
    Environment Driven Innovation of Hydraulic Excavators

    By Axel Doelcken

    ?? Liebherr excavators in standard configuration are generally designed to operate in an ambient temperature range between -12°C and +55°C (10.4 °F and 131°F). ?? To operate effectively and efficient

    May 1, 2008

  • CIM
    Intelligent Air Management for Energy Efficiency in Mining and Mineral Processing Operations

    By Arun .. J. Basu

    The paper introduces Intelligent Air Management (IAM) as the core activity of M&I Group of Companies (M&I) for providing a total solution to any air management problems for mining and mineral processi

    Apr 1, 2005

  • CIM
    The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground Voids

    Safe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such

    May 1, 2007

  • CIM
    Get More from Existing Mining Equipment Through Reliability

    Improved Process & Practices Result In: ? Reduction of undesirable downtime, & expensive secondary damage ? Improved equipment performance & health ? Extension of equipment life, & reduction of ope

    May 1, 2010

  • CIM
    Grinding Circuit Improvements at Barrick Goldstrike’s Roaster Facility

    By Jim Wickens, Andy Cole, John Pekrul

    "The roaster facility at Barrick Goldstrike Mine treats double-refractory sulfidic/carbonaceous gold ore. Prior to oxidation in the roasters, the ore is ground in two parallel dry grinding circuits ut

    Jan 1, 2003

  • CIM
    Real-Time Data Reconciliation for Process Control

    By Éric Poulin, Simon Gariépy, Mario Paredes Malca

    "While the design of a control strategy depends on the available process knowledge, its implementation depends on the available process information. On-line chemical analyzers are today widely spread

    Jan 1, 2006

  • CIM
    Comparison of Artificial Neural Networks and a Geostatistical Method in Grade Estimation

    By Hamid Mahmoudabadi

    In the present paper, the performance of four approaches based on neural networks and geostatistical method for grade estimation are compared and analyzed their performance to find a proper method. Fo

    Oct 1, 2009

  • CIM
    Visualization of Fine Bubbles and Their Role in Fine Particle Flotation

    By Wei Sun, Jaewon Choung, Zhenghe Xu, Zhangming Cui

    "High intensity conditioning has been demonstrated in a number of cases to enhance fine particle flotation. The improvement could be attributed to the enhanced formation of particle aggregates. Howeve

    Jan 1, 2006

  • CIM
    SAG Mill Operation at Cortez: Evolution of Liner Design from Current to Future Operations

    By Raj K. Rajamani, Sanjeeva Latchireddi, Dave Plummer, Stieger. Julius

    "The Cortez SAG mill liner design was recently modified to improve the mill operating energy efficiency. In addition to the expected benefits, the design change unexpectedly played a significant role

    Jan 1, 2007

  • CIM
    A Shaba-type Cu-Co(-Ni) Deposit at Luamata, West of the Kabompo Dome, Northwestern Zambia

    By Nicholas Macrae Steven

    Abstract - The Shaba-type Luamata Cu-Co(-Ni) deposit (11°50_S, 24°28_E) is located in a tectonic slice of Katangan Roan Supergroup (Mines Group) sedimentary rocks, surrounded by younger Kundelungu Sup

    Jan 1, 2000

  • CIM
    Continuous Countercurrent Ion Exchange (CCIX) Used In Hydrometallurgy - The Influence of Iron

    By Filip Rochette, Yvan De Busscher

    Extraction of minerals can be achieved by a variety of technologies; one of them is ion exchange. There are several ion exchange configurations and mechanical set-ups available, but only one technolog

    Jan 1, 2016

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004

  • CIM
    Chrome Grinding Balls at Campbell Mine

    By Bill Shand

    "Placer Dome - Campbell Mine is a gold mine located at Balmertown in the Red Lake District of North Western Ontario. During the last 50 years, the mine has produced over ten million ounces of gold.A c

    Jan 1, 2001

  • CIM
    Process Improvement Update at Brunswick Mine

    By Jodi Roberts, Curtis Deredin, Jean-Guy Paulin

    "Since the establishment of the Six Sigma quality improvement program in 2001, several projects have been successfully carried out in the copper-lead, zinc, copper separation, lead upgrading and bulk

    Jan 1, 2008

  • CIM
    In Situ Condition Monitoring of a Rail-based System

    By Jeffrey L. Pagnutti

    Train derailment can lead to loss of capital, damage to the environment, and loss of life. Machinery condition monitoring techniques can be used to develop a structural health monitoring system for r

    May 1, 2013