Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Hydrogen Reduction of Copper and Nickel in the Processing of Copper Bleed Solution of Indian Sea Nodules

    By B. D. Pandey, D. Bagchi, Premchand

    During the separation and recovery of metals from the ammoniacal leach liquor of Indian Ocean nodules by solvent extraction-electrowinning (SX-EW) in close-loop operation, the copper electrolyte conta

    Jan 1, 2004

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • CIM
    Improving the Gold Gravity Performance: an Investigation into the Laboratory and Plant Gravity Recoveries

    By Sunil Koppalkar, Guillaume Noel, Ahmed Bouajila, Makni Sami, Claude Gagnon

    "Gold gravity recovery circuits utilizing enhanced gravity separators have become an integral part of many of the modern gold processing plants. Thus, efforts to improve the operating efficiency have

    Jan 1, 2011

  • CIM
    Underground Milling of Uranium Ores

    By Chuck Edwards

    "Cameco operates the high-grade McArthur River uranium mine in northern Saskatchewan, and is constructing the high-grade Cigar Lake uranium mine. Cameco has studied the concept of underground milling

    Jan 1, 2007

  • CIM
    The Weird World of the Nanoscale

    By Michael B. Cortie

    The young field of nanotechnology has as its objective the design and construction of useful devices made of nanoscale materials. Objects or structures which have at least one important dimension in t

    Oct 1, 2003

  • CIM
    Geomechanics Strategies for Rockburst Management at Vale Inco Creighton Mine

    By F. Malek

    At Creighton Mine, magnitude events are a regular occurrence due to depth and major seismically-active structures. Over the last ten years, major advances have been made in research and development to

    May 1, 2009

  • CIM
    New Technologies for Improved Processing of Base and Precious Metals Containing Ores

    By J. Lee, M. Peart, T. Bhambhani, D. R. Nagaraj, P. Riccio

    "Over the past decade or so, our efforts have focused on developing the rationale and concepts for new technology in reagent development and optimization in the processing of base and precious metals.

    Jan 1, 2013

  • CIM
    Development of an Audit Procedure to Diagnose the MOP Flotation Circuit at SQM Chile

    By Carlos F. Perucca, Maria Virginia Ramírez A.

    "Chile based SQM S.A., exploits potassium chloride rich salts at the Salar de Atacama, in northern Chile. The process includes the solar evaporation of natural brines existing in the Salar salt bed, f

    Jan 1, 2004

  • CIM
    Metallurgical mapping of the San Nicolas deposit

    By A. H. Winckers

    "The San Nicolás deposit is a complex fine grained polymetallic volcanogenic massive sulphide deposit located in central Mexico.Metallurgical testwork was carried out in 1999 and 2000 to develop a flo

    Jan 1, 2002

  • CIM
    Experiences with a New Generation Automated Long Hole Drilling Rigs at LKAB Kiruna Mine in Northern Sweden

    By Patrik Ericsson

    During the 90?s Atlas Copco and LKAB developed a pioneering fully automatic long hole production drilling system based on the Atlas Copco Simba W469 drill rigs. These drill rigs have since then drille

    May 1, 2007

  • CIM
    Barrick?s Global Approach to Ground Control Management

    By J. Ran

    Ground instability is among the major causes of serious incidents and production disruptions in the mining industry and has a significant impact on safety. Mining companies may have operations in a nu

    May 1, 2006

  • CIM
    Recovery of thermal coal from waste dumps near Stellarton, Nova Scotia

    By L. C. Bird, N. T. L. Landgren, M. W. Mikhail

    "Through funds made available in 1972 by the Nova Scotia Department of Mines and Energy (DME) and the federal Department of Regional Economic Expansion, a program was initiated to recover saleable coa

    Jan 1, 1981

  • CIM
    Hydraulic versus cable in 1988

    By Brian Reid

    "This paper studies the progress made by hydraulic shovel manufacturers over the last few years, particularly in the areas of productivity increase and operating cost reductions.Five years ago, it was

    Jan 1, 1988

  • CIM
    Simulation Numérique Du Dma Dans La Halde Sugar Shack South De La Mine Questa, Nouveau-Mexique

    By René Lefebvre

    Numerical simulations of the physicochemical processes related to acid rock drainage (ARD) in the Sugar Shack South rock pile of the Questa Mine were performed with the TOUGH AMD simulator. The object

    Nov 1, 2002

  • CIM
    Development of a Cadmium Removal Process for Vale’s Long Harbour Hydrometallurgy Plant

    By P. C. Holloway, A. Tshilombo, T. Xue, M. J. Collins, R. Lopetinsky, I. Mihaylov, I. M. Masters

    The Voisey’s Bay deposit contains a trace amount of cadmium, which reports to solution during pressure leaching of the nickel concentrate at Vale’s Long Harbour Hydrometallurgy Plant, and must be remo

    Jan 1, 2019

  • CIM
    Numerical Analysis of the Early Response of Paste Backfill in a Vertical Stope

    By N. E. Mkadmi

    Backfilling increases the stability of underground stopes and may help reduce the environmental footprint from the mining operation. The barricades holding the backfill in place must be designed to pr

    May 1, 2011

  • CIM
    The Schaft Creek Porphyry Cu-Mo-Au Deposit

    By James Scott

    Outline Deposit Overview and Brief History ?Geologic Setting ?Local Geology ?Petrography ?Geochemistry ?Mineralization ?Geochronology ?Conclusions Deposit Overview ?Porphyry Cu-Mo-Au ?Disco

    May 1, 2006

  • CIM
    Probabilistic practical optimization of production scheduling for multi-element deposits

    Optimizing production scheduling in open pit mines is important for managing cash flows of mining operations. This paper describes a new, probabilistic, mixed integer programming (MIP) formulation whi

    Jan 1, 2006

  • CIM
    Spheroidization of a medium carbon HSLA fastener-grade steel

    By P. P. Sinha, D. N. Bhatia, B. R. Ghosh, R. K. Gupta

    Medium carbon, low alloy, high-strength steels containing Ni, Cr, and Mo are used for the fabrication of various types of high-strength fasteners required for launch vehicle structures. Cold heading p

    Jan 1, 2007

  • CIM
    Electromagnetic Wire-Rope Testing --- Disparate LMA Results, an Ongoing Problem

    By Marcel M. Djivre

    Electromagnetic wire rope testing is the only practical non-destructive method to evaluate the current condition of wire ropes in general, and in the mining industry in particular. The method has been

    May 1, 2004