Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Outstanding Issues In Understanding The Behaviour Of Thermally-Activated Pile FoundationsBy Teresa M. Bodas Freitas, Arianna Lupattelli, Peter J. Bourne-Webb, Diana Salciarini, Martina Zito, Donatella Sterpi
The thermomechanical response of thermally-activated (TA) piles under monotonic thermal loads is quite well understood and the remaining uncertainties relate to the effect of long-term, cyclic loading
May 1, 2022
-
Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load TestingBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l
Sep 8, 2021
-
Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont TowerBy Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich
"The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element
Jan 1, 2017
-
Pile Design Philosophies For Coralline And Weak Carbonate RocksBy Rahul Wankhade, Sunil S. Baswankar, Aditya S. Kharatkar
Despite advances in pile design methodologies and piling techniques at site, difficulties and uncertainties still exists for design of piles particularly in coralline deposits and weak carbonate rocks
Sep 1, 2022
-
Case Histories of Circular Secant Pile Access Shafts for TunnelsBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
Creative Solution For Sydney Data CentreBy M. Krzaninski, Y. Zou, A. Frost
The foundation solution for a data centre building in Sydney, Australia comprised two alternatives, the first of which incorporated the use of CFA piles founded in rock at approx. 27m depth to support
Nov 1, 2022
-
Framework for Risk-Based Electric System Deep Foundation DesignBy Steve Davidow, Ashely E. Evans, Peter M. Kandaris
"Annually thousands of deep foundations are constructed across North America supporting high voltage transmission line structures. However, a recent state of the practice survey by the Deep Foundation
Jan 1, 2017
-
The Use of Controlled Modulus Column (CMC) Ground Improvement for Support of Large WarehousesBy Brandon T. Buschmeier, Sonia S. Swift, Michael P. Walker, Frederic Masse
"Ground improvement has undoubtedly become a cost-efficient and effective solution to support the development of poor soil sites. Ground improvement elements, such as Controlled Modulus Columns (CMCs)
Jan 1, 2017
-
Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, DarwinBy J. Racinais, P. Vincent
"In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m
Jan 1, 1900
-
Solving Variable Bedrock Challenges With Ductile Iron PilesBy Kevin R. Johnson, Matt Caskey, Bryan Plaskett
Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical design and construction. These challenges can include constrained si
Oct 1, 2022
-
Fundamentals FirstBy Jeffrey C. Schuh, Logan Bloemer, Daniel P. Dietzler
Over the past 30 years, the authors have encountered numerous projects where recognizing the geology, soil properties and groundwater conditions, and considering alternative construction techniques ha
Jan 1, 2019
-
Linking the Installation Response of Screw Piles to Soil Strength and Ultimate CapacityBy James P. Hambleton, Sam A. Stanier
A perceived advantage of screw-type foundations is the ability infer aspects of foundation performance from quantities measured or observed during installation, especially the installation torque. A p
Jan 1, 2019
-
Gowanus Pumping Station; Jet Grout Bottom Seal and Deep Support ColumnsBy Paul C. Schmall, Kevin Clarke, Paul J. Lewis, John M. Stanbury
"The $200M rehabilitation of the more than 100-year-old Gowanus Flushing Tunnel and pumping station located on the Gowanus Canal in Brooklyn, NY required deep excavations in an extremely congested urb
Jan 1, 2016
-
Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground MetroBy Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani
With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s
Nov 1, 2022
-
Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway BridgesBy Reinaldo J. Villa, Joshua C. Adams
The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac
Sep 8, 2021
-
Excavation Support by Deep Soil Mixing- Challenges on Depth and Long Term ExposureBy D. Barber, A. D. Miller, P. A. Bray
The project was to develop an area within the existing West County Wastewater Treatment Plant which would enable the construction of a new Raw Wastewater Pump Station (RWPS) with a footprint of approx
Jan 1, 2017
-
Recycled Polymer Application During Pile Boring Operations: A ReviewBy Hitendrabhai S. Dewangan, Dr. Aashish A. Mehta
Pile foundation is widely used in construction of marine structures. In offshore & marine piling work, drilling/boring supporting fluid is used to stabilize the borehole (excavation) prior to tremie c
Sep 1, 2022
-
Ground Improvement By Means Of Stabilising ColumnsBy Georg Breitsprecher
The technique of Stabilising Columns (product names are for example "Stabilisierungssaulen" (STS) or "Coplan Stabilisierungs-verfahren" (CSV)) is gradually becoming well accepted for ground improvemen
Jan 1, 2006
-
Improvement Of Bearing Capacity Of Bored Piles By Grouting MethodBy Andrzej Tejchman
A method of improvement of a subsoil under bored pile base by injection is presented. The method employs a special chamber attached to the reinforcement at the bottom of the drilled borehole. The cham
Jan 1, 2002
-
Rectification Measures And Restoration Of Distressed Pump FoundationsBy V K. Panwar, Sampat Raj
At a Fertilizer plant located in the southern part of India, 74 numbers of pump foundations have shown non-uniform settlements causing the tilting of pump foundations under self-weight primarily due t
Nov 1, 2022