  • DFI
    Driven Piles In Glacial Deposits Exhibiting Time Dependent Capacity

    By Upendra L. Karna

    The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor

    Jan 1, 2006

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2003

  • DFI
    Site Management Towards Pile Execution At Qurashiya Bridge

    By Emad W. Shublaq

    Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur

    Jan 1, 1992

  • DFI
    Analysis Of Load Tests Of Drilled Shafts. For Support Of Overhead Signs

    By Roy H. Borde

    The design of foundations to support overhead signs is primarily based on providing adequate resistance against horizontal wind loads. The typically used subgrade reaction model for the load-deflectio

    Jan 1, 1988

  • DFI
    A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place Piles

    By Sridhar Krishnan

    This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p

    Jan 1, 2006

  • DFI
    Mitigating Settlement with Pile-Supported Approach Slabs

    By Reda M. Bakeer

    "An approach slab is the roadway segment that immediately follows a bridge intended to provide a smooth transition between the two elements. Some approach slabs have developed rough rideability with t

    Jan 1, 2017

  • DFI
    Displacement And Pore Pressure Monitoring During Installation Of Drilled Displacement Piles

    By Lisa M. Splitter

    Drilled displacement piles were constructed as the foundation for a proposed 10-story building in San Francisco, California. At the study location, the stratigraphy consists of 14 to 21 feet of fill

    Jan 1, 2009

  • DFI
    Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems

    By Howard A. Perko

    Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me

    Jan 1, 2008

  • DFI
    Geotechnical Investigation For Deep Foundation Projects In Shanghai Area ? Synopsis

    By E. R. Wang

    This paper outlines the engineering properties of shallow soil in Shanghai area. The main points that should be paid attention to during deep foundation investigation, and general conditions of experi

    Jan 1, 2010

  • DFI
    Practical Experience With Nondestructive Testing Of Augered Cast-In-Place Piles

    By Bernard H. Hertlein

    All methods of deep foundation construction present challenges to the contractor and engineer that vary according to the method employed, and the geotechnical conditions in which it is being used. Aug

    Jan 1, 1997

  • DFI
    Ground Movements - A Hidden Source Of Loading On Deep Foundations

    By Harry G. Poulos

    Ground movements can arise from a large number of sources and can have a significant effect on nearby piles and deep foundations. The loading of the piles by ground movements is a different mechanism

    Jan 1, 2006

  • DFI
    High Risk Control For Piling And Deep Foundations - A Systematic Approach

    By Martin van Staveren

    In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu

    Jan 1, 2006

  • DFI
    Reflections On Our Industry - Foundation Vs Geotechnical

    By Arturo Ressi di Cervia

    From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in

    Jan 1, 2000

  • DFI
    Effects Of Mineral And Polymer Slurries On Drilled Shafts - 1. Introduction - 1.1 History Of And Principles Of Mineral Slurries In Drilled Shaft Construction

    By Michael W. Neill, O&apos

    Drilling slurry has become an effective aid to the construction of drilled shafts in caving and/or waterbearing soils. Historically, drilling slurry made of bentonitic clay and water was first used in

    Jan 1, 1991

  • DFI
    On The Effects Of Sand Grading On Driven Pile Performance

    Precast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i

    Jan 1, 1989

  • DFI
    Field Trials for Deep Mixing in Land Remediation: Execution and Early Age Monitoring, QC and Lessons Learnt

    By Ziyad Abunada, David O’Connor, Abir Al-Tabbaa

    "Abstract Contaminated land remediation using soil mix technology (SMT) is a relatively recent development which has been shown to be a cost effective and versatile system with numerous environmental

    Jan 1, 2014

  • DFI
    Bending Strength Of Threaded Micropile Connections

    By Steven R. Musselman

    The bending strength and flexural stiffness of a micropile at its threaded connection is less than its intact strength and may fail due to thread slippage or by fracture through the pin (reduced cross

    Jan 1, 2007

  • DFI
    Use Of Micropiles And Soil Nail Piles In State Of California Earthquake Retrofit Project No.#569 - Deep Foundations Institute Seattle, Washingon October 7-9, 1998

    By Ron Bromenschenkel

    The State of California, Department of Transportation is currently retrofitting a major interchange near the San Francisco area. The project is located in a highly traveled area of Oakland with light

    Jan 1, 1998

  • DFI
    Construction Productivity Advancement Research Program (CPAR)

    By Jesse A. Pfeiffer

    CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati

    Jan 1, 1989

  • DFI
    I-470 Mine Remediation

    By Sheryl D. Gallagher

    The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the

    Jan 1, 2009