    Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo Dam

    By Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro

    "San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million

    Jan 1, 2015

  • DFI
  • DFI
    Micropiles in an Urban Setting – TBTA Verrazano Narrows Bridge HOV/BUS Ramps, Brooklyn, NY and Nysdot Kosciuszko Bridge Replacement, Brooklyn, NY

    By M. D. Riegel, Brian T. Felber

    "Construction of foundation elements in an urban environment is often complicated by multiple constraints such as existing foundations, utility conflicts, maintenance and protection of traffic on high

    Jan 1, 2016

  • DFI
    Full Scale Load Test Program Confirms the Design of a Rigid Inclusions Solution for the Support of an MSE Wall in Southern New Jersey

    By Susan Rafalko, Mike Walker, John Sankey, Sherif Aziz, Alex Potter-Weight, Mary Nodine, Frederic Masse

    "After several successful projects on the Garden State Parkway and New Jersey Turnpike for support of single-stage MSE (Mechanically Stabilized Earth) walls using rigid inclusions (Controlled Modulus

    Jan 1, 2015

  • DFI
  • DFI
    Dynamic Analysis of a Base-Isolated Bridge, Seattle, Washington

    By Greg Nutson, Jeremy Butkovich, Bill Perkins, Hollie Ellis, Paul Bott

    "Dynamic soil-structure interaction (DSSI) analyses are becoming more common in bridge designs, especially in seismically active areas. Because of its proximity to two active fault zones, the Evergree

    Jan 1, 2017

  • DFI
    Contribution of Inner Frictional Resistance to Bearing Capacity of Open-Ended Piles

    By Janaka J. Kumara, Takashi Kurashina, Yoshiaki Kikuchi, Takahiro Yajima

    "The inner frictional resistance of open-ended piles depend heavily on the degree of soil plugging. Many factors including pile diameter, relative density and end conditions of the piles influence the

    Jan 1, 2017

  • DFI
    Analytical and Field Estimates of Shaft Resistance in Socketed Piles: Bandra-Worli Sea Link, Mumbai

    By Sunil S. Basarkar, Dilip M. Dewaikar, Rajesh H. Gajjar

    "A load transfer program AXPILE was developed for simulation of the loadmovement characteristics of socketed piles of the Mumbai reg ion. This program used empirical relationships for ultimate shaft r

    Jan 1, 2005

  • DFI
    Residual Load Development Case Study In Driven Cast-In-Situ Piles

    By Packer M. L

    Residual load development in driven precast piles has been widely researched in recent decades, however, cast-in-situ piles are often falsely assumed to be unaffected by this mechanism. In contrast to

    May 1, 2022

  • DFI
    Outline and Execution Control System of Dry Jet Mixing (DJM) Method

    By Shigetoyo Yasui, Masahiro Saitou, Nobushige Yasuoka, Keisuke Tsujimoto

    "The Dry Jet Mixing (DJM) Method was developed and has been put to practical use on the initiative of the Public Works Research Institute and Japan Construction Method and Machinery Research Institute

    Jan 1, 2015

  • DFI
    Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)

    By Jeffrey M. Taylor, Arturo Ressi di Cervia

    "Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con

    Jan 1, 2004

  • DFI
    Performance of Cement Deep Mixing Method in 2011 Tohoku Earthquake

    By Shoji Higashi, Nobuhiro Honda, Takeo Asanuma, Tatsuo Nagatsu, Masaki Kitazume, Sachihiko Tokunaga, Shigeru Kubo, Hidenori Takahashi, Tsuneyasu Onishi, Yoshiyuki Morikawa

    "Various kinds of civil engineering structures and facilities were seriously damaged in the earthquake in Tohoku and Kanto regions of Japan on 11 March 2011 due to the greatness of its magnitude. In c

    Jan 1, 2015

  • DFI
    Foundations Of The 'Kö-Galerie' In Düsseldorf Using Top/Down Building Technologies

    By P. Arz

    With a total of five basement levels, ground floor and a further six levels above grade, construction of the Kö-Galerie building, on the Königsallee, in the centre of Düsseldorf, was completed with al

    Jan 1, 1989

  • DFI
    Design, Construction, And Testing Of A Precast UHPC Pile

    By Thomas L. Vande Voort

    The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural systems of bridges in the United States as two grand challenges in br

    Jan 1, 2008

  • DFI
    Author index

    Abouleid,A.F.327 Ajdic, I.451 Albert, L.F. 221,307 Alem, A. 525 Asama, T. 431 Avgherinos, P. J. 373 Baker Jr, C.N. 331 Balossi Restelli, A. 171 Beckwith,G.H.33 Bellini, A. 469 Ber

    Jan 1, 1994

  • DFI
    Engineering Successful Dewatering in Arid Urban Areas: Abu Dhabi Dewatering Guidelines

    By M. Melih Demirkan, Juan J. Gutierrez, Raghav Ramanathan

    "As the capital of the United Arab Emirates (UAE), Abu Dhabi is one of the world’s fastest-developing cities. To sustain its significant growth rate, Abu Dhabi must surmount challenging engineering pr

    Jan 1, 2017

  • DFI
    Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore (97785a40-c93d-4648-ae71-8e34822bf6ed)

    By George C. Webb

    A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in

    Jan 1, 2003

  • DFI
    Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore

    By George C. Webb

    A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in

    Jan 1, 2005

  • DFI
    Use of APG Piles for Support of New Hospital Replacement Wing in a Site Susceptible to Excessive Ground Settlement Ventura, California

    By Maria Flessas, Justin Ray, Danielle Steinmetz, Brian Zuckerman

    "The Ventura County Medical Center Hospital Replacement Wing project consists of the construction of a 2- to 3-story building with a basement encompassing the entire footprint and two corridors connec

    Jan 1, 2016

  • DFI
    Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)

    By Monique Nykamp

    "INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the

    Jan 1, 2007