Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Deep-Sea Quay Wall for Offshore Wind Energy Terminal on Maasvlakte 2 Rotterdam – NL

    By Patrick van der Schaaf

    "During 2016, foundation piling works were completed to allow for the construction of a production and storage/handling terminal in Rotterdam. It is there that steel foundations will be produced for o

    Jan 1, 1900

  • DFI
    Bi-Directional Load Testing Of A Pile Bored Using Bentonite Mud In Guinea Bissau

    By Frédéric Rocher-Lacoste

    On July 2nd, 2007, LCPC and LOADTEST performed a static loading test with an Osterberg-cell on a bored pile of 1600 mm diameter. The 56.50 meters deep test pile constructed by Trevi Spa for Soares da

    Jan 1, 2008

  • DFI
    Identification and Quantification of Pile Relaxation

    By Patrick J. Hannigan, Alex Ryberg, Rozbeh B. Moghaddam

    Driven piles are widely used for foundation support. In the vast majority of cases, an increase in pile capacity occurs with time which is referred to as “set-up.” However, in a very limited number of

    Jan 1, 2019

  • DFI
    Guidelines for Soil Mixing

    "1.0 INTRODUCTIONThese Guidelines reflect the state-of-the-practice of the Deep Mixing Method (DMM) in North America. DMM is an in situ mixing process that breaks down the soil structure; injects bind

    Jan 1, 2016

  • DFI
    Hybrid Design Approach for Anchored Retaining Walls in Complex Geology

    By Christopher J. Ramsey, Don W. Dotson

    "An existing four lane section of US 27 was widened to eight lanes. The project lies in the rugged Valley and Ridge Province of the Appalachian mountains starting at the Tennessee River in Chattanooga

    Jan 1, 2015

  • DFI
    High Strain Testing Of Augered Cast Piles At Miami Fort Power Station

    By C. Michael Morgano

    Static tests are costly and time consuming, so they are not always the best answer [ ]

    Jan 1, 2005

  • DFI
    Cockatoo Island Seawall Seepage Barrier

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    Cockatoo Island Seawall Seepage Barrier (b791f2b4-d692-4b8a-afba-0ecd9b385be1)

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    Geophysical Methods For Site Characterization For Marine Foundations

    By Richard E. Sylwester

    Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is pri

    Jan 1, 2013

  • DFI
  • DFI
    Case Study: The Use Of Post Tensioned Piles For Wind Turbine Foundations

    By Amr Sallam, Ahmad Mohamed, Mohamed Alrowaimi

    Renewable energy, in the form of wind and solar, has emerged as main source of energy in the modern society. The wind industry has substantially grown over the last two decades to become a key player

  • DFI
    Soil Mixing for the Rio Puerto Nuevo Project in San Juan, PR: A Case History

    By Filippo Maria Leoni, Wesley Schmutzler, Matteo Bertoni

    "Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project (Project) in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 92 inch ID forced sewer main relocation and to

    Jan 1, 2015

  • DFI
    Case Study: Soil Setup For Piles Driven Into Eastern Coastal Plain Deposits In Virginia

    By Sushant Upadhyaya, Deniz Karadeniz, Ahmed Mohamed

    Soil setup analysis provides opportunities for efficiencies in pile foundation design and installation. Soil setup gain with time was evaluated as part of the foundation design and installation for tw

  • DFI
    Inspector?s Guide To Augered Cast-In-Place Piles - Second Edition - Title ? Table Of Contents - 1.0 General

    This manual is limited to Augered Cast-in-Place (ACIP) piles constructed using a hollow stem continuous flight auger. 1.1SCOPE AND LIMITATIONS The intent of this manual is to provide guidelines

    Jan 1, 2010

  • DFI
    Current Practice For Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control

    By Rudolph P. Frizzi

    Structures supported on ACIP and DD piles perform successfully when quality control is maintained from the initial site subsurface investigation through pile design, bidding, and construction. The fou

    Jan 1, 2005

  • DFI
    Inspector?s Guide to Augered Cast-in-Place Piles

    By Matthew E. Meyer

    The intent of this manual is to provide guidelines for observing and documenting the installation of ACIP piles. The manual may also serve as a guide for the training of inspection personnel. It is ex

    Jan 1, 2010

  • DFI
    Characteristics of Strength Development of Fiber-Reinforced and Cement Improved Soft Clay of Shanghai (c152f4a9-990c-402e-baf3-fbbcafc7e905)

    By Mu Chen, Ye-Shuang Xu, Dong-Wei Hou, Shui-Long Shen, Huai-Na Wu

    "This paper presents a laboratory investigation on the mechanical behaviors of the cement-clay admixture improved by polypropylene fiber. Cement can significantly improve the clay admixture. The fiber

    Jan 1, 2015

  • DFI
    Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)

    By John C. Niedzielski, A. Frances Ackerman

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l

    Jan 1, 2017

  • DFI
    Foundation Innovations Ensure Successful Bridge Replacement

    By Mark S. Greenleaf, Alec D. Smith, Mary Vittoria-Bertrand, Heather B. Scranton, Jean Louis Z. Locsin

    "Rhode Island’s new $163.7 million, 2,265 ft (690 m) long, four-lane Sakonnet River Bridge sits just south of the existing bridge in Portsmouth/Tiverton. The bridge, a critical transportation system l

    Jan 1, 2015

  • DFI
    Environmental Considerations Regarding The Danish Landworks For The Fixed Link Across The Øresund - Synopsis

    By Uwe Hess

    For the Danish landworks for the coming fixed link between Denmark and Sweden across the Øresund the focus has been on the environmental aspects of the construction and operation of the facilities. Th

    Jan 1, 1996