Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Novel xP-fan Calibration for Better Fine Fragment Detection in Optical GranulometryBy Thomas Palangio, Blessing Taiwo
Image-based fragmentation analysis is increasingly utilized in blasting operations to evaluate particle size distribution in a non-intrusive and efficient manner. However, the accuracy of optical gran
Jan 26, 2026
-
Improvements to Blast Performance by Use of a Low-Density Emulsion at Barrick Goldstrike's Meikle MineBy Tony Francelj, D. Scott Scovira, Remi Proulx
The Meikle Mine is a high-grade, underground gold mine that utilizes a primary and secondary stoping method with delayed backfill. The newly developed Rodeo Mine will start production using similar mi
Jan 1, 2002
-
The Investigation of Ground Vibrations Induced by Bench Blasting at Different Quarries at Catalca District in TurkeyBy Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Mehmet Aksoy, Deniz Adiguzel
The environmental problems arising from ground vibration has been faced and discussed frequently in various industries such as quarry, mining, civil works, shaft, tunneling, pipe line and dam construc
Jan 1, 2007
-
Perimeter Blasting with the ANFO-Spoon TechniqueBy Larry Ng, Keith McDonald
The benefits of controlled blasting techniques have gained increasing recognition by the mining industry in recent years. The utilization of an effective controlled blasting programme can result in a
Jan 1, 1994
-
Vibration impact reduction to the community through low density bulk emulsion.By E. Líder, J. Pavez, J. Rivera
The application of new technologies, methodologies, and the use of new products in mining operations is a practice that is becoming more common in the industry every day, added to the new challenges a
Jan 1, 2024
-
Airblast Reduction from Effective Blasthole StemmingBy Duane Skidmore, Francis Otuonye, Calvin J. Konya
Proper stemming not only affects the rock breakage process, but also controls the unwanted side effects of blasting such as airblast, ground vibration, and flyrock. Little research has been conducted
Jan 1, 1982
-
Knocking Down Barriers to QRA AcceptanceBy Jorge Flores, Dean Nichols
Some view quantitative risk assessment (QRA) as difficult to understand and complicated to use. They are comfortable with the proven reliability of quantity distance (QD) and question the benefits of
Jan 1, 2015
-
ApplicationofArcGISProinBlast-InducedGroundVibrationAnalysisinanOpenPit CopperMineBy Yong Pan, Purushotham Tukkaraja
It has been well understood that blasting is the cost-effective method for breaking rocks as compared with the mechanical systems. However, vibrations induced by blasting in open-pit mines could pose
Jan 1, 2019
-
Urban Tunneling for the MWRA's Boston Harbor Clean UpBy Gordon C. Petersen, Gary A. Almeraris
This paper describes the controlled blasting techniques required to mine a rock tunnel section of a main interceptor located in the Boston Metropolitan area. The 3m (10 ft) x 2.8m (9.25 ft) horseshoe
Jan 1, 1991
-
Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power PlantBy Thierry Bernard, Philippe Dozohne
May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate
Jan 1, 2001
-
A New Method of Reactive Ground TestingBy Gary Cavanough
The spontaneous exothermic reaction of ammonium nitrate explosives with sulphide-containing rocks, commonly referred to as reactive ground, is a site-specific condition that can lead to spontaneous de
Feb 6, 2023
-
Practical and Proven Methods to Control Blast Induced Coal Damage when Blasting OverburdenA major problem that has continued to plague the surface coal industry is blast induced damage to the coal seam. Atlas Powder Company has addresssed this situation through seven years of field researc
Jan 1, 1990
-
Considerations in Pre-Split Blasting for Mines and QuarriesBy J Lyall Workman, Peter N. Calder
"Presplitting is a technique mines and quarries may use to produce high quality final pitwalls. Damage from backbreak can be minimized, thereby insuring the final pit walls standat the designed angle.
Jan 1, 1993
-
Diamonds are a Driller's Best FriendBy Langdon T. Mitchell, Karl Ingmarsson
The title is not referring to jewelry; nor is it about diamond core drilling. This article is instead about an emerging application for diamonds, hard rock percussive drilling with diamond drill bits.
Jan 1, 1999
-
Blasting-Concern for Neighbors and OperatorsBy Kris Shukla
Noise and vibration produced by blasting generate curiosity and concern from neighbors. Experiments conducted in Sweden, Canada and U.S.A. have established that fine cracks in the plaster--the weakest
Jan 1, 1978
-
Demolition Blast of Heavily Reinforced Concrete Slab on Impermeable LayerBy Ye Yuan, Jaak Daemen, Shaguo Yuan
ABSTRACT: A 400m2 (480 yd2) heavily reinforced high-strength concrete slab 800mm (31 inch) thick had to be demolished. Underneath it was a 300mm (12 inch) thick underlying structure consisting of thre
Jan 1, 2010
-
Efficient Blasting for Bench Stability and Fragmentation Results ImprovementBy Javier Illanes Pizarro, Gustavo Huerta Valer, Jorge Cárdenas Miranda
Bench stability is the basis of sustainability in an open pit mining operation. Taking care of the pit walls while maintaining fragmentation results can prove a challenge. In this study, technical pro
Feb 6, 2023
-
Implementation of a Real Time Traceability System from Mine to PlantBy R. Ticona, J. Alarcon
In the continuous search to provide comprehensive solutions and identify opportunities to improve ore traceability, from the blastholes to mill feed, different ore traceability systems have been devel
Jan 1, 2024
-
Risk Assessment Software Applied To Large Bomb Detonations Near StructuresBy Joshua Hoffman, Rob Farnfield, Catherine Johnson, Braden Lusk, Morgan Lane
IMESAFR (IME Safety Analysis for Risk) is a quantitative risk assessment software tool developed by the Institute of Makers of Explosives (IME) and A-P-T Research, Inc. It is used for managing risk in
Jan 1, 2014
-
Detailed Planning Underscores Expansion of Vulcan's Chattanooga QuarryBy R L. Mayville
The author explains why the strategic location and important limestone reserves at Chattanooga Quarry led to a decision to extend operating life by continued benching down to lower levels. He discusse
Jan 1, 1984