Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Rock Classification For Portal Design

    By G. K. Rogers

    The portal, which is the near-horizontal, surface point of entry to an underground excavation, can often be an exceedingly difficult area in terms of ground control. Surface and subsurface failures at

    Jan 1, 1989

  • SME-ICGCM
    Influence Of Discontinuity Orientations And Strength On Cavability In A Confined Environment

    By L. J. Lorig

    Much of the present knowledge about caving behavior of rock masses has been obtained from empirical observations. Additional notions about caving have been developed through inferences derived from tw

    Jan 1, 1989

  • SME-ICGCM
    Destressing Practice In Rockburst-Prone Ground

    By J. Willan

    This paper addresses the problem of designing a destress blasting procedure to reduce the incidence of rockbursting in hard rock mines. A review is made of the developed theory and practice of destres

    Jan 1, 1984

  • SME-ICGCM
    Harworth Colliery: Rockbolted Support In Weak Roof At Depth

    By Dave Bigby

    Hatworth Colliery, operated by RJB Mining (UK) Ltd, is successfully mining the Deep Soft Seam at a depth of 1000m using single face retreat longwalling. The seam is characterised by a weak roof genera

    Jan 1, 1996

  • SME-ICGCM
    Pre-mining stresses at some hard rock mines in the Canadian Shield (2c76bca0-8dd2-4a44-bc9b-85524b3514cf)

    By B. Arjang

    ABSTRACT: Ground stresses are one of the significant factors in the context of rockbursts and underground instability at some hard rock mines in Canada. Overcoring strain relief measurements using tri

    Jan 1, 1989

  • SME-ICGCM
    Interaction Subsidence In The Sydney Coalfield, Nova Scotia

    By Peter Cain

    The paper presents previously unpublished results derived from an unique interaction moitoring program conducted in the Sydney Coalfield of Nova Scotia. An abandoned, sealed longwall gateroad was r

    Jan 1, 1996

  • SME-ICGCM
    Experimental Study Of Line Electrode Method To Detect Underground Cavities

    By F. Ziaie

    Line electrical resistivity method using physically infinite distance between current line electrodes is proposed to determine the location of mine workings. In this method at least three line electro

    Jan 1, 1989

  • SME-ICGCM
    Computer Modeling Of Rock Mass Geomechanic State In Longwall Design

    By V. D. Jalevsky

    A new methodology of an experimental-analytical approach has been developed. It is used in building an information geomechanic monitoring system for the modeling of geomechanic processes during coal s

    Jan 1, 1996

  • SME-ICGCM
    Monitoring Subsidence Over Submarine Coal Mines In The Sydney Coalfield By Bathymetric Methods

    By David Forrester

    Subsidence beneath the land surface has traditionally been monitored using the most accurate surveying methods of the day. Over the several hundred years of subsidence investigation, these techniques

    Jan 1, 1996

  • SME-ICGCM
    Multiple Seam Highwall Mining In Appalachia (428a0473-c28a-4ef9-81d1-1ed7e6911c69)

    By David Newman

    Multiple seam underground coal mining is ubiquitous in Appalachia. Many coal properties have from two to ten or more economically mineable coal seams. Because of the ability to penetrate 600-feet to

    Jan 1, 2009

  • SME-ICGCM
    Investigation of Some Alternatives to Timber Posts and Cribs

    By Gavin J. Faulkner

    This paper presents an investigation of some alternatives, and improvements to timber posts and cribs. The purpose is to find a cheaper, better, easy to install, and effective means to replace or impr

    Jan 1, 1986

  • SME-ICGCM
    Calcium Aluminate Kiders in Hard Rock and Coal Mining

    By Bernard Woolley

    The history of the use of calcium aluminates in mining is discussed including a review of very rapid hardening concretes, anchoring using cement capsules and pumped ground control systems. Specific re

    Jan 1, 1997

  • SME-ICGCM
    A Study On Stress Distribution And Reasonable Size Of Coal Pillar In A Coal Face

    By H. C. Li

    Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the wid

    Jan 1, 1992

  • SME-ICGCM
    Design Of Longwall Extractions Under Flooded Abandoned Workings In The Sydney Coalfield

    By Peter Cain

    Longwall extraction in the Phalen Scam in the Sydney Coalfield of Nova Scotia is carried out under flooded abandoned workings in the Harbour Seam 140 m above, and at depth of up to 700 m beneath the A

    Jan 1, 1996

  • SME-ICGCM
    The Load Transfer Properties of Post?Groutable Cable Bolts Used in the Australian Coal Industry

    By Rob Thomas

    Adequate load transfer is considered essential for optimum ground support and is increasingly important in weak roof and/or high stress environments. If adequate load transfer is achieved not only can

    Jan 1, 2012

  • SME-ICGCM
    Effects of In-seam and Near-seam Conditions and Asymmetric Pillar Loading on Coal Pillar Strength

    By Daniel W. H. Su

    The importance of incorporating fundamental principles of rock material response and failure mechanics into a pillar strength design model has been demonstrated. To accurately assess pillar strength,

    Jan 1, 1997

  • SME-ICGCM
    Time-Dependent Behavior Of Rocks: Laboratory Tests On Hollow Cylinder

    By Gilles Rousset

    This paper presents laboratory experiments conducted on hollow cylinders samples. The advantage of such a geometry is to approach in situ conditions around cylindrical openings (lined galleries, boreh

    Jan 1, 1989

  • SME-ICGCM
    Subsidence and Uplift Prediction in German and Polish Hard Coal Mining

    By Axel Preusse

    For the last 150 years, subsidence damage to the surface has been an unavoidable phenomenon associated with underground coal mining. In particular, the mechanization of mining methods in multiple seam

    Jan 1, 2012

  • SME-ICGCM
    Probabilistic Analysis of Blasting Impact on Open Pit Stability (95ce6127-68ed-453f-9268-476a1af1dd45)

    By Dae S. Young

    A new probabilistic approach is introduced for slope stability analysis including adverse impact of blasting vibrations. The material strength within a slope area is randomized in this bi-variate join

    Jan 1, 1984

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009