Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Electrical Measurements of Coal Measure Rocks for Electromagnetic Applications in Mining Industry

    By Nikolay Boykov

    Subsurface imaging technologies are part of the electromagnetic (EM) geophysical methods. EM technologies such as radio imaging method (RIM), ground penetrating radar (GPR), and drill string radar (DS

    Jan 1, 2006

  • SME-ICGCM
    Mining Method For Extracting An Eight Metre Coal Horizon Containing A Sandstone Layer

    By Freddie Hunter

    An underground mining method for extracting an eight metre (26') coal horizon, containing a sandstone layer. A decrease in the thickness of the rock strata between the number two and number th

    Jan 1, 2003

  • SME-ICGCM
    Cable Bolting with Low Air Power ? A Solution?

    By Matt Leeming

    Several of the underground mines in the UK require a significant number of cable bolts to be installed, remedially, to control worsening roadway conditions. Often the access is limited and the only po

    Jan 1, 2007

  • SME-ICGCM
    Some Thoughts on Calibrating LaModel

    By Keith Heasley

    In many practical situation where the LaModel program in used to analyze the mechanical response and failure of the mining environment, there are very few actual field measurement from the site availa

    Jan 1, 2008

  • SME-ICGCM
    Relationship between the Width of Strip Pillar Yield Zone and Recovery Ratio

    By Wenbing Guo

    The stability of strip pillar is the key to successful strip pillar mining. In analyzing the stability of the strip pillar, the width of yield zone must be determined. The determination of the width

    Jan 1, 2006

  • SME-ICGCM
    Roadway Strata Management in the New South Wales Underground Coal Mining Industry

    By Rob Thomas

    Strata management is a critical and now necessary requirement in the New South Wales underground coal mining industry. As a formal and structured process, strata management allows ground supp

    Jan 1, 2007

  • SME-ICGCM
    Comparison of the Mark-Bieniawski and Wilson Pillar Equations Using Site Specific Data

    By Vincent Scovazzo

    This paper compares the two most common pillar design equations used worldwide by John T. Boyd Company; the Mark-Bieniawski Equation, an empirical approach, and the Wilson Equation, an analytical appr

    Jan 1, 2008

  • SME-ICGCM
    Mitigating Longwall Subsidence Effects on a Large Industrial Building

    By Yi Luo

    The efforts to mitigate longwall subsidence influences on various residential and farming structures by many coal mining companies have been successful in the recent years (Luo, et al, 2003). The succ

    Jan 1, 2005

  • SME-ICGCM
    Seismic Tomography, an Ideal but Immature Tool for Coal Bump Prediction

    By Erik Westman

    Coal bumps remain one of the industry?s most devastating but least understood phenomena. If changes to the internal conditions of the rock mass could be observed there is hope that bumps could be fo

    Jan 1, 2008

  • SME-ICGCM
    Advancements in the Use of High-Modulus Polymer Mining Grids to Speed Longwall Recovery

    By Thomas A. Bailey

    Since the advent of longwall mining, various methods and materials have been used during relocation to control the intrusion of the gob in the shield/panline area. (figure 1) Controlling this gob is c

    Jan 1, 2006

  • SME-ICGCM
    Coal Pillar Loading Mechanisms and Progress in Pillar Design

    By David Hill

    The Australian underground coal mining industry is increasingly operating in an environment that challenges traditional concepts of coal pillar design, against a background of heightened expectations

    Jan 1, 2008

  • SME-ICGCM
    The Origin and History of U.S. Mine Resin

    By Carl Tom Blevins

    Resin was first introduced to U. S. mines in 1971 and first produced in 1973. The original polyester roof bolt resin was very expensive and limited to a single cartridge size and a single slow gel ti

    Jan 1, 2006

  • SME-ICGCM
    Stability Mapping as a Tool for Production Planning at Bowie No. 3 Mine

    By Collin Stewart

    Bowie Resources, LLC (Bowie) has been using the Stability Mapping System (SMS) developed by Dr. Keith Heasley, West Virginia University, since 2005. Seven three-entry longwall gateroads, four longwall

    Jan 1, 2007

  • SME-ICGCM
    Risk Assessment of Surface Fracture Endangered Ranges Over Shallow Mine Workings

    By Peter Fischer, Heinz-Jiirgen Kateloe, Anton Sroka, Axel Preusse

    "Since mining in Germany has a long history, there are still many locations where the surface fracture problem has to be solved. Shallow mine workings from an earlier era can affect the surface in a d

    Jan 1, 2010

  • SME-ICGCM
    Using Major Hazard Risk Assessment to Appraise and Manage Escapeway Instability Issues: A Case Study (d1d3dd49-2f0a-44af-8ddf-69de3f441c2d)

    By Anthony Iannacchione

    A Major Hazard Risk Assessment (MHRA) was developed in Australia after a series of mine disasters in the 1990?s. A MHRA is used to help prevent major hazards, i.e. fire, explosion, wind-blast, outbur

    Jan 1, 2007

  • SME-ICGCM
    Coal Mine Geology in the U.S. Coal Fields: A State-of-the-Art-Review

    By Frank E. Chase

    During the past quarter century, coal mine geologists have evolved from providing a qualitative description of drill core and coal reserves into quantitative geotechnical specialists who bridge the ga

    Jan 1, 2006

  • SME-ICGCM
    Sublevel Caving Mining Method for Extra-Thick Coal Seams

    By H. Nan

    Using the case of Qianqiu Mine, Yima Coal Mining Administration, theoretical analysis, laboratory physical simulation, and underground observation were performed to study the major parameters for full

    Jan 1, 2006

  • SME-ICGCM
    Multiple-Seam Inter-Burden Stress Distribution Using Strip-Pillar Mining Method

    By Jin He

    Based on the simple-beam theory, a stress analysis model was established for undermining in multiple seam strip-pillar mining when the strip pillars were not columnized; the effects of various mining

    Jan 1, 2006

  • SME-ICGCM
    The Initial Collapse of the Overburden Over Longwall Panels

    By Gennaro Marino

    Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing

    Jan 1, 1987

  • SME-ICGCM
    Why Dead Load Suspension Design for Roadway Roof Support Is Fundamentally Flawed Within a Pro?Active Strata Management System

    By Russell C. Frith

    Risk-based roadway roof support design is now a critical part of the Australian Coal Industry. Safe and efficient mining demands that roof support be tailored to the prevailing geotechnical conditions

    Jan 1, 2011