Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Changes In Seismic Measurements With Blast Induced Fracturing: A Field Experiment

    By Clifford J. Roblee

    In this paper, various seismic indicators are evaluated for ability to discern fractures induced into a rock mass by blasting. This is accomplished by presenting results from in situ crosshole seismic

    Jan 1, 1989

  • SME-ICGCM
    BORE Bolt: No Milled Notch? No Hot Notch? No Problem

    By Stephen C. Tadolini, Anand Bhagwat

    "Intrinsic supports installed in mines with limited seam or mining heights have always proven to be difficult when the required support length is longer. To date, three solutions have been used to ens

    Jan 1, 2018

  • SME-ICGCM
    Surface And Borehole Microseismic Monitoring Of Longwall Faces; Their Potential For Three-Dimensional Fracture Imaging And The Geomechanical Implications.

    By Styles P.

    To determine whether 130 felt earth tremors around Edwinstowe, Nottinghamshire U.K, which also experienced severe surface fissuring, were caused by coal extraction, a surface seismometer array was est

    Jan 1, 1992

  • SME-ICGCM
    Trial of Small Gateroad Pillar in Top Coal Caving Longwall Mining of Large Mining Height

    By Kun Li, Shuaishua Yue, Huigui Li, Yuan Ruifu, Yongxiang Xu, Huamin Li

    "Coal seams in Tashan Mine of Datong Coal Group in China average 49.2 ft (15m) thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 12.5 ft

    Jan 1, 2015

  • SME-ICGCM
    Development of a Risk Rating System for Use in Underground Coal Mining

    By Johann van Wjk

    Mandatory Codes of Practice to Combat Rock Fall Accidents came into force on South African Collieries in 1997. These were drawn up in accordance with guidelines issued by the Chief Inspector of Mines,

    Jan 1, 2002

  • SME-ICGCM
    The Potential of Using Coal Washing Plant Waste As a Backfill in Room and Pillar Mines

    By Anthony (Sam) J. S. Spearing

    Backfilling using coal waste is not a novel means for waste disposal throughout the world; yet, backfilling using a high density (paste) backfill is relatively new, except in Germany and Poland. One o

    Jan 1, 2013

  • SME-ICGCM
    Bailey Mine Slurry Impoundment Longwall Subsidence Monitoring

    By Richard J. Perin

    Subsidence monitoring was conducted in proximity to the 1-A and 2-A longwall panels at Consol Pennsylvania Coal Co.'s (CPCC) Bailey Mine slurry impoundment. Monitoring fullfills federal Mine Safe

    Jan 1, 1988

  • SME-ICGCM
    A Procedure for the Rapid Assessment of Coal Mine Roof Stability against Large Roof Falls

    By Ted Klemetti, Gabriel Esterhuizen, John L. Ellenberger

    "Advanced numerical models can be used to evaluate entry support systems in coal mines. However, these methods require specialized software and specialized skills to create the models and evaluate the

    Jan 1, 2015

  • SME-ICGCM
    Investigation of Electromagnetic Emissions in a Deep Underground Mine (0366ea57-3ba7-4a00-bec7-825a048e7e26)

    By Douglas Scott

    Highly stressed rock in stopes continues to be a primary safety risk for miners in underground mines because it can result in failures of ground that lead to both injuries and death. Spokane Research

    Jan 1, 2004

  • SME-ICGCM
    Load Deformation Behavior Of Simulated Longwall Gob Material

    By Deno M. Pappas

    The purpose of this U.S. Bureau of Mines study was to determine the material stiffness properties of the gob for use in numerical models of rock mass response to longwall mining. Photographs of actual

    Jan 1, 1993

  • SME-ICGCM
    Underground Mining Technology in Chinese Coal Mines

    By Jiachen Wang

    China is the largest coal producing country in the world. Coal is widely distributed in China and thus the mining conditions are complex and diverse. This paper summarizes the important achievements i

    Jan 1, 2014

  • SME-ICGCM
    Optimizing Secondary Roof Support With The NIOSH Support Technology Optimization Program (STOP) (9d51b6a2-7ba0-4aba-9b0e-5647ea8b90eb)

    By Thomas M. Barczak

    The decade of the 90's brought an unprecedented increase in the development of innovative technologies to provide more effective and easier to install roof support in underground mines. To facili

    Jan 1, 2000

  • SME-ICGCM
    Simulated Materials Modeling And Analysis Of The Overburden Strata Movement In Top Coal Caving Mining

    By Zhou Ying

    Based on the mining condition and roof lithology of the 2-3 coal seam at Gengcun Mine, the simulated materials modeling method was used to study the movement process and characteristics of overburden

    Jan 1, 2001

  • SME-ICGCM
    Evaluation Of Subsidence Parameters For Inclined Seams In UK Coalfields

    By X. L. Yao

    This paper analyses the effects of mining extraction geometry (width/depth ratio) and dip of seam on subsidence parameters based on a large Database, containing 120 longwall mining cases all within th

    Jan 1, 1990

  • SME-ICGCM
    The Broken Rock Zone Around Tunnels And Its Support Theory

    By Fangting Dong

    The broken rock zone (BRZ) and the tunnel support theory are investigated. The relationship between the BRZ and the related factors, the interaction between the BRZ and supports, and the function of s

    Jan 1, 1988

  • SME-ICGCM
    Causes of Massive Directional Roof Falls in Room and Pillar Mines - Two Case Studies

    By S. S. Peng

    In recent years many roof falls have been conveniently attributed to the adverse existence of a high horizontal stress. The normal practice of not conducting a follow-up study in a roof fall investiga

    Jan 1, 1999

  • SME-ICGCM
    Sidewall Fracturing In Coal Room And Pillar And Pillar Extraction Panels (fdea63a5-d54d-46e2-aad5-6c4f1c72e2f1)

    By André Vervoort

    In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic models pr

    Jan 1, 1992

  • SME-ICGCM
    Mine Convergence When Using Mobile Roof Supports In Pillar Recovery

    By J. R. Stoltz

    To date, there has been limited formal research dealing with the use of Mobile Roof Supports (MRS) for pillar recovery. This paper, which is a portion of a larger project, presents convergence data fr

    Jan 1, 1999

  • SME-ICGCM
    Critical Roof Span Approach To Selection Of Proper Coal Mine System

    By Antoni Kidybinski

    Coal mining both with longwall and room-and-pillar method often encounters severe operational difficulties due to had roof conditions. Rooffalls at entry cross-cuts or along the rib line in longwalls

    Jan 1, 1982

  • SME-ICGCM
    A Decade of Mobile Roof Support Application in the United States

    By Larry Howe

    Second, or retreat mhng with Mobile Roof Supports (MRS) has now been part of coal mining in the United States for a decade Their utilization has evolved into mining applications which vary in seam hei

    Jan 1, 1998