Mine-Wide Physical Property Trend Identification Using Portable Onsite Test DevicesBy Thomas L. Vandergrift
The type and severity of coal mine entry failures are affected by the strength and stiffness properties of the roof, floor, end coal. Knowledge of the mine-wide trends of these properties Is valuable
Jan 1, 1990
-
Analysis of a Stability Problem in an Underground Coal Mine Due to Floor ConditionsBy M Nombe
Based on the analysis of a case study at POWELTON No.2 MINE, it was determined that mine stability problems had occurred due to floor softening. A fireclay (underclay) layer in the immediate floor was
Jan 1, 2002
-
Tunnel Deformation Monitoring "Action Levels" In Coal Mines For Support/Reinforcement DesignBy Lorraine Kent
Mine tunnel support using rockbolts was introduced in UK coal mines over the period 1987- 1992 and is now used in over 70% of all mine tunnels. In every case the reinforcement design has been based on
Jan 1, 1999
-
Analysis Of Major Failure Through Integration Of Static And Dynamic Rock Mechanics InvestigationBy K. Y. Haramy
Rock burst and coal mine bump research using static and dynamic rock mechanics instrumentation has been conducted for several decades. Research efforts typically have been conducted using static instr
Jan 1, 1988
-
The Effect of Standing Support Stiffness on Primary and Secondary Bolting Systems (956b0a5f-7133-4b32-8a8e-517785f1d52a)By Stephen Tadolini
Standing crib supports have been applied in underground mining programs to resist large roof movements and sustain high¬loads. The strength and deformation capability of these systems has been documen
Jan 1, 2003
-
Failure Modes Of Mine Tunnels In Stratified Rock Structures With Reference To Stress Field ConditionsBy Hui Chen
The paper describes the use of a physical model technique to investigate the failure modes of mine tunnels with reference to the in situ stress field. The characteristics of stratification commonly en
Jan 1, 1993
-
The Characteristics Of Mining-Induced Fractures In Overlying StrataBy Jialin Xu
Bed separations position, size, development characteristics and their influence factors have been analyzed in-depth by experimental and theoretical methods. The results show that the key strata determ
Jan 1, 2003
-
Mitigating Subsidence Influences on Residential Structures Caused by Longwall Mining OperationsBy Yi Luo
The severity of disturbances caused by longwall mining subsidence to various residential structures can be re¬duced. The success of such mitigation efforts depends on accurate subsidence prediction, c
Jan 1, 2003
-
Review Of Pillar Design Equations Including The Effects Of ConstraintBy C. Babcock
This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships
Jan 1, 1981
-
Geo-Mechanical Property And Failures Of Weak Roof Shales In Coal MinesBy Yunqing Zhang
Weak shales refer to those with lower strength, thinly- laminated structure, sensitivity to moisture and weathering as well as significant time dependent behavior. It has been said that many future co
Jan 1, 2004
-
A Methodology for Fault Pre-Consolidation prior to Longwall Retreat: A Case Study from Kestrel CoalBy Dion Pastars
Kestrel Coal has undertaken a surface-to-seam consolidation program of faulted ground prior to longwall retreat in the 304 panel. Micro fine cement is used to improve the rock mass quality and the
Jan 1, 2007
-
Developments in Sealant Support Systems for Ground Control (21st international Conference on Ground Control in Mining)By Deno Pappas
During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) has been evaluating developments in sealant support systems from a gr
Jan 1, 2002
-
Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry StabilityBy Jinsheng Chen
Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron
Jan 1, 2002
-
Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)By S. J. Mitchell
An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz
Jan 1, 1984
-
Assessment Of Underground Structural DesignBy Eugene D. Krupa
Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is
Jan 1, 1990
-
Mistakes, Misconceptions, and Key Points Regarding Secondary Roof Support Systems (b87a5324-ac75-480a-90d7-e642733c14a4)By Thomas M. Barczak
Roof support systems are necessary to provide stable mine openings and much research has been conducted to design a variety of roof support systems that will function in various manners to ensure that
Jan 1, 2001
-
Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone StrataBy J. R. Koehler
The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f
Jan 1, 1995
-
Imaging Ahead Of Mining With Radio Imaging Method (RIM-IV) Instrumentation And Three-Dimensional Tomography SoftwareBy Larry Stolarczyk
A clear vision of the future coal mining industry was developed into a hierarchy of technology needs by the National Mining Association (NMA) and the Chief Executive Officers of the mining industry. A
Jan 1, 2003
-
Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar BehaviourBy I. L. Follington
A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to
Jan 1, 1992
-
The Stress And Failure Paths Followed By Coal Mine Roofs During Longwall Extraction And Implications To Tailgate SupportBy Ross Seedsman
Discussion on the design of roof support in tailgates has often been conducted without a clear statement of the stress and failure conditions acting. There is general agreement that in the tailgate th
Jan 1, 2001