Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Mine-Wide Physical Property Trend Identification Using Portable Onsite Test Devices

    By Thomas L. Vandergrift

    The type and severity of coal mine entry failures are affected by the strength and stiffness properties of the roof, floor, end coal. Knowledge of the mine-wide trends of these properties Is valuable

    Jan 1, 1990

  • SME-ICGCM
    Analysis of a Stability Problem in an Underground Coal Mine Due to Floor Conditions

    By M Nombe

    Based on the analysis of a case study at POWELTON No.2 MINE, it was determined that mine stability problems had occurred due to floor softening. A fireclay (underclay) layer in the immediate floor was

    Jan 1, 2002

  • SME-ICGCM
    Tunnel Deformation Monitoring "Action Levels" In Coal Mines For Support/Reinforcement Design

    By Lorraine Kent

    Mine tunnel support using rockbolts was introduced in UK coal mines over the period 1987- 1992 and is now used in over 70% of all mine tunnels. In every case the reinforcement design has been based on

    Jan 1, 1999

  • SME-ICGCM
    Analysis Of Major Failure Through Integration Of Static And Dynamic Rock Mechanics Investigation

    By K. Y. Haramy

    Rock burst and coal mine bump research using static and dynamic rock mechanics instrumentation has been conducted for several decades. Research efforts typically have been conducted using static instr

    Jan 1, 1988

  • SME-ICGCM
    The Effect of Standing Support Stiffness on Primary and Secondary Bolting Systems (956b0a5f-7133-4b32-8a8e-517785f1d52a)

    By Stephen Tadolini

    Standing crib supports have been applied in underground mining programs to resist large roof movements and sustain high¬loads. The strength and deformation capability of these systems has been documen

    Jan 1, 2003

  • SME-ICGCM
    Failure Modes Of Mine Tunnels In Stratified Rock Structures With Reference To Stress Field Conditions

    By Hui Chen

    The paper describes the use of a physical model technique to investigate the failure modes of mine tunnels with reference to the in situ stress field. The characteristics of stratification commonly en

    Jan 1, 1993

  • SME-ICGCM
    The Characteristics Of Mining-Induced Fractures In Overlying Strata

    By Jialin Xu

    Bed separations position, size, development characteristics and their influence factors have been analyzed in-depth by experimental and theoretical methods. The results show that the key strata determ

    Jan 1, 2003

  • SME-ICGCM
    Mitigating Subsidence Influences on Residential Structures Caused by Longwall Mining Operations

    By Yi Luo

    The severity of disturbances caused by longwall mining subsidence to various residential structures can be re¬duced. The success of such mitigation efforts depends on accurate subsidence prediction, c

    Jan 1, 2003

  • SME-ICGCM
    Review Of Pillar Design Equations Including The Effects Of Constraint

    By C. Babcock

    This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships

    Jan 1, 1981

  • SME-ICGCM
    Geo-Mechanical Property And Failures Of Weak Roof Shales In Coal Mines

    By Yunqing Zhang

    Weak shales refer to those with lower strength, thinly- laminated structure, sensitivity to moisture and weathering as well as significant time dependent behavior. It has been said that many future co

    Jan 1, 2004

  • SME-ICGCM
    A Methodology for Fault Pre-Consolidation prior to Longwall Retreat: A Case Study from Kestrel Coal

    By Dion Pastars

    Kestrel Coal has undertaken a surface-to-seam consolidation program of faulted ground prior to longwall retreat in the 304 panel. Micro fine cement is used to improve the rock mass quality and the

    Jan 1, 2007

  • SME-ICGCM
    Developments in Sealant Support Systems for Ground Control (21st international Conference on Ground Control in Mining)

    By Deno Pappas

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) has been evaluating developments in sealant support systems from a gr

    Jan 1, 2002

  • SME-ICGCM
    Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry Stability

    By Jinsheng Chen

    Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron

    Jan 1, 2002

  • SME-ICGCM
    Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)

    By S. J. Mitchell

    An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz

    Jan 1, 1984

  • SME-ICGCM
    Assessment Of Underground Structural Design

    By Eugene D. Krupa

    Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is

    Jan 1, 1990

  • SME-ICGCM
    Mistakes, Misconceptions, and Key Points Regarding Secondary Roof Support Systems (b87a5324-ac75-480a-90d7-e642733c14a4)

    By Thomas M. Barczak

    Roof support systems are necessary to provide stable mine openings and much research has been conducted to design a variety of roof support systems that will function in various manners to ensure that

    Jan 1, 2001

  • SME-ICGCM
    Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone Strata

    By J. R. Koehler

    The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f

    Jan 1, 1995

  • SME-ICGCM
    Imaging Ahead Of Mining With Radio Imaging Method (RIM-IV) Instrumentation And Three-Dimensional Tomography Software

    By Larry Stolarczyk

    A clear vision of the future coal mining industry was developed into a hierarchy of technology needs by the National Mining Association (NMA) and the Chief Executive Officers of the mining industry. A

    Jan 1, 2003

  • SME-ICGCM
    Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar Behaviour

    By I. L. Follington

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to

    Jan 1, 1992

  • SME-ICGCM
    The Stress And Failure Paths Followed By Coal Mine Roofs During Longwall Extraction And Implications To Tailgate Support

    By Ross Seedsman

    Discussion on the design of roof support in tailgates has often been conducted without a clear statement of the stress and failure conditions acting. There is general agreement that in the tailgate th

    Jan 1, 2001