Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Utilizing The ?Advance And Relieve? Method To Reduce Horizontal Stress Affects On The Mine Roof, A Case Study (b5b945af-699f-46b0-ae56-a98434baad9f)By Dennis R. Dolinar
A room and pillar coal operation in central Pennsylvania was experiencing roof cutters and long running roof falls caused by high horizontal stresses. The roof conditions created hazards for the miner
Jan 1, 2000
-
Thrust Bolting: A New Innovation In Coal Mine Roof SupportBy Stephen C. Tadolini
A new innovation in coal mine roof support has been developed by the Bureau of Mines at the Denver Research Center. The technique, called "Thrust Bolting,"1 converts a traditional passive roof support
Jan 1, 1990
-
Mine Planning For Longwall And Pillar Retreat Panels Subject To Seam Interaction EffectsBy Thomas L. Vandergrift
Multiple-scam mining is becoming more common in the United States, especially in the East, where primary reserves arc being depleted, forcing mining companies to develop secondary seams, Although mine
Jan 1, 2000
-
Mine Panel Collapse - Two Case StudiesBy Hanjie Chen
A mine panel collapse may occur when pillar sizes are too small or the surrounding rock strata (roof or floor) yields. After a small pillar fails, its loading is rapidly transferred to adjacent pillar
Jan 1, 1999
-
A Case History Investigation of Two Coal Bumps in the Southern Appalachian CoalfieldBy David Newman
The Southern Appalachian coalfield has a long history of coal bumps that are attributable to a unique combination of topography, geology, and multiple seam mining. The high pillar stresses that genera
Jan 1, 2002
-
Investigation Of Subsidence Event Over Multiple Seam Mining Area (b421bdde-19e7-491b-bc6d-a4cce9ef42b4)By Kewal K. Kohli
An investigation was performed to determine the sequence of events which caused the 1987 surface subsidence and related damage to several homes in Walker County, Alabama, USA (see Figure 1). Surface a
Jan 1, 1992
-
Eclipse System Improves Resin Anchored Rebar BoltingBy Al Campoli
The majority of the 100 million roof bolts installed each year in the United States are 5/8 inch deformed rebar fully grouted into a one inch borehole. Commonly referred to as B-Series or No. 5 bar, t
Jan 1, 2002
-
Design Considerations For Angle BoltersBy Charles D. Albright
FMC built its first angle bolter in 1969. This was a single mast unit which could drill holes for conventional bolts or angle holes for installing roof trusses. From this drill we learned very quickie
Jan 1, 1982
-
Stooping Low Safety Factor Pillars At Goedehoop CollieryBy Gift Makusha
The Witbank Coalfield in South Africa contains up to five economically viable coal seams. These seams have been mined continuously for over 100 years and the reserve in now becoming depleted. The norm
Jan 1, 2003
-
Moonee Colliery: Renewing The Economic Viability Of A Mine Using Microseismic And Hydraulic Fracturing Techniques In Massive Roof ConditionsBy Peter Hayes
Moonee Colliery operates a longwall extraction system in the Great Northern seam of the Newcastle Coal Measures, approximately 100km north of Sydney, NSW. In the initial mine area of longwall block
Jan 1, 2000
-
A Study of Potential Fault Reactivation and Water Intrusion at a Longwall Coal Mine in AppalachiaBy Francis Kendorski
A longwall coal mine in Appalachia about 1,500 ft deep encountered a fault while developing a new longwall panel. The fault extended from mining depth to the surface near a secondary road and drainage
Jan 1, 2003
-
Laboratory and In Situ Results of a Slip Nut Yielding Rock Bolt SystemBy John D. VandeKraats
Yielding rock bolt systems have been developed to provide ground support while accommodating shifting, creeping, or swelling ground movements. The Dywidag Systems, Inc. (DSI) Slip Nut System is one su
Jan 1, 1998
-
A Novel and Effective Method to Develop Tension in a Roof BoltBy Phillip E. Gramlich
Through extensive practical experience and multiple studies, tensioned roof control systems have proven beneficial in difficult mining conditions. Due to increased mining of less desirable seams, ten
Jan 1, 2014
-
Forecasting Roof Falls with Monitoring Technologies - A Look at the Moonee Colliery Experience (4e80a5f5-32b0-43df-a54a-da0b54b2c984)By Anthony Lannacchione
There has been a persistent need to forecast roof falls so that miner's exposure to hazardous underground environments can be minimized. Several monitoring techniques have been developed and are
Jan 1, 2005
-
Evaluation of Anchorage Integrity for Grouted Bolts in Weak StrataBy W. C. Smith
Over the past several years, the Bureau of Mines has conducted studies on the performance of fully grouted resin bolts In underground mines. The effectiveness of resin-grouted bolts in maintaining a c
Jan 1, 1987
-
Case Studies Of Progressive Pillar Failure In Two Mines Using Wide PillarsBy Hamid Maleki
Results of geologic investigations, in-mine instrumentation, and numerical modeling are presented for two longwall mines in which pillars with large width-to-height ratios (8 to 9) are used. These inv
Jan 1, 2000
-
A New Approach to the Integrity Testing of Ground AnchoragesBy Andrew Starkey
Ground anchorage systems in the form of rock bolts are used extensively throughout the world as supporting devices for civil engineering structures such as bridges and tunnels. It is widely recognized
Jan 1, 2001
-
Determination of Effective Column Lengths for Resin-Grouted Roof BoltsBy W. A. Cincilla
The use of resin-grouted rock anchors continues to gain popularity in underground wall mines in the United States. It is estimated that during 1985, more than 30% and as many as 35% of all roof bolts
Jan 1, 1986
-
Protecting Underground Coal Miners From Rib FallsBy Michael Gauna
In 2010, the number of fatal rib falls in U.S. underground coal mines exceeded fatal roof falls for the first time ever. While recent trends have seen roof fall fatalities reduced by about 62% since t
Jan 1, 2011
-
Development of A Yielding Steel PostBy John P. Dunford
Ground support continues to be the most important safety consideration in underground mining. The Bureau of Mines has developed a yielding steel post with a capacity of 45 tons and b c1osure allowance
Jan 1, 1986