Search Documents

  • SME
    Niagara Tunnel Project

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.

    Jan 1, 2007

  • SME
    More Than 110,000 Attend ConExpo in Las Vegas

    By Steve Kral

    More than 111,350 mining and construction industry professionals from throughout the world gathered in Las Vegas, NV, March 19-23 for ConExpo-Con/Agg 2002 and IFPE 2002. The triennial event is the We

    Jan 1, 2002

  • SAIMM
    Fatigue Properties Of Fabricated Aluminium I-Beams

    By M. Matema

    Paper written on project work carried out in partial fulfilment of BSc (Eng.) Metallurgy and Materials Engineering Small and large welded aluminium specimens were tested in fatigue and the results

    Jan 1, 2005

  • ISEE
    Portable Continuous Velocity of Detonation Systems

    By Jackson R. Pressley, M L. Hopkins, R E. Danell, N T. Moxon, Andrew Bowman

    Efficient and cost effective blasting is achieved by closely matching the explosive energy to the strength of the material in which it is being used. Although there are many empirical relationships wi

    Jan 1, 1991

  • SME
    Factors Influencing Use Of Mineral Admixtures For The Past Decade In The Western US - Preprint 09-081

    By G. Hoffman

    Sustainable development has brought social, environmental and energy efficiency concerns together with management and governance of natural resources. Cement manufacturing, an energy- and natural reso

    Jan 1, 2009

  • NIOSH
    RI 2626 Hazards of Electric Sparks And Arcs In Coal Mines

    By L. C. IlsLey

    "There is an old saying that ""It is too late to lock the stable after the horse is stolen"". Is not this just what is being done by many mine operators today when it comes to buying safe electrical e

    Jul 1, 1924

  • DFI
    Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction

    By Brian R. Zuckerman

    The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State

    Jan 1, 2002

  • AUSIMM
    Investigations of Massive Sulphide Mineralisation Along the Kermadec Arc 1996 - 2005

    By G J. Massoth, K Faure, A G, R G. Ditchburn, I J. Graham

    From modest beginnings in 1996, research into the mineral potential of New ZealandÆs Exclusive Economic Zone has progressed into a major multidisciplinary component of GNSÆs recently funded 6-year æMi

    Jan 1, 2005

  • TMS
    Dust Forming Mechanisms In The Copper Converting Process

    By Bo Björkman

    A controlled dust generation whereby the dust generated would be enriched with specific metals would considerably facilitate the possibilities of recovering metals from such dusts. A basic understandi

    Jan 1, 1996

  • AIME
    Getting The Foreign Workman's Viewpoint

    By Prince Lazarovich, Hrebelianovich

    I WAS asked by the chairman of one of the Sessions on Employment Problems to talk about the viewpoint of the foreign workingman. I am not a workingman. I have never done what a work-hand might call an

    Jan 4, 1918

  • AUSIMM
    Kalgoorlie Tailings Retreatment Project- A Case Study

    The Kalgoorlie Tailings Retreatment Project (or "Kaltails") involves the reclamation and retreatment of approximately 50 million tonnes of gold tailing situated on the Golden Mile at Kalgoorlie, Wes

    Jan 1, 1990

  • NIOSH
    IC 8846 Pumped-Slurry Backfilling Of Abandoned Coal Mine Workings For Subsidence Control At Rock Springs, Wyo. - With An Appen On Hydraulic Model Studies For Backfilling Mine Cavities By E. J. Carlson, U.S. Bureau Of Reclamation, Denver. Colo.

    By G. J. Colaizzi

    The Bureau of Mines, at the request of local authorities in Rock Springs, Wyo., investigated and conducted through contracts a multistage program of exploratory drilling and pumped-slurry backfilling

    Jan 1, 1980

  • SME-ICGCM
    Prediction of surface movement with emphasis on horizontal deformation due to mining

    By Mao Bai

    In predicting the integrity of under-mined structures, surface horizontal displacements and curvatures are frequently of greater importance than the more homogeneous vertical displacements. Accurate e

    Jan 1, 1989

  • AUSIMM
    Modern Gas-Power Practice

    ALTHOUGH it has been a matter of about one hundred years since the idea of the internal-combustion engine entered the mind of the inventor, the practical application of its use was not attained till 1

    Jan 1, 1912

  • DFI
    Design-Build Support Of Excavation For Block 76, Salt Lake City, Utah

    By Rick Deschamps

    The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake

    Jan 1, 2009

  • NIOSH
    RI 7353 Electrowinning Aluminum From Aluminum Chloride - Operation Of A Single-Compartment Cell

    By D. E. Kirby

    The electrochemical reduction of AlC13 was investigated as a process for the production of aluminum. An externally heated, single-compartment cell with a rammed refractory lining was used with molten

    Jan 1, 1970

  • NIOSH
    OFR-28-74 Electromagnetic Location Experiments In A Deep Hardrock Mine

    By A. J. Farstad

    Electromagnetic location tests were conducted by Westinghouse Georesearch Laboratory under the sponsorship of the U. S. Bureau of Mines at the Galena Mine in Northwest Idaho. The objectives of these t

    Jan 1, 1973

  • SME
    Evaluation of Roof Bolter Canopy Air Curtain Effects on Airflow and Dust Dispersion in an Entry Using Blowing Curtain Ventilation Mining, Metallurgy and Exploration (fbebd4c9-e3f3-48b5-bb14-baf48bbb456f)

    By M. R. Shahan, W. R. Reed, J. P. Rider

    Roof bolter operators may be exposed to high respirable dust concentrations on continuous miner sections with blowing face ventilation when bolting is performed downwind of the continuous miner. One s

  • IOM3
    Stability analysis of open-pit copper mine by use of numerical modelling methods

    By B. B. Dhar

    Slope stability at the proposed mine in Rajasthan was analysed in two dimensions using a finite difference code. The properties of the rock material were determined in the laboratory and subsequently

    Aug 1, 1994

  • NIOSH
    OFR-59(3)-73 Phase II Final Report - Volume 3 Of 3 - Feasibility Study Of Surface Impregnation Equipment For The Chemical Stabilization Of Coal Mine Structures

    This report summarizes the work performed and results achieved on the above contract from October 18, 1971 through July 14, 1972 under Phase II, Task 1: Detailed Design of Prototype and Task 3: Suppor

    Jan 1, 1972