Search Documents

  • SAIMM
    Measurement of in situ stresses in deep drillholes for a hydroelectric project

    By N. Kumar, A. K. Dhawan, A. Varughese, S. K. Khullar

    Abstract The in-situ stress field is one of the primary parameters influencing the performance of underground structures particularly in the Himalayas where there is strong influence of topography

    Jan 1, 2003

  • NIOSH
    OFR-57-82 Undercut And Fill System For Pitching Coal

    By Arnis Mangolds

    A study of the technical and economic feasibility of using a unique undercut and fill system developed by USBM engineers to mine steeply pitching coal is discussed. A brief resource assessment has ind

    Jan 1, 1981

  • SME
    Engineered Pumpable pHoam?: A New Innovative Method For Mitigating Ard

    If one can embrace the medical analogue, much of the mining industry currently suffers from a massive bacterial infection. When pyrite-bearing or sulfide-bearing rock formations, tailings, or mine was

    Jan 1, 2012

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • ISEE
    Analysis of Parameters of the Ground Vibration Produced by Bench Blasting at a Boron Open Pit Mine in Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Mehmet Aksoy, Kagan Ozdemire

    With increasing environmental constraints on the levels of disturbance induced by blasting operations upon nearby residents, there is an increasing need to be able to design cautious blasting with gre

    Jan 1, 2005

  • SAIMM
    The response of shotcrete to blast induced vibrations in mining

    By L. Malmgren, A. Ansell

    This paper deals with the influence from blast induced stress waves on the performance of shotcrete support in the Kiirunavaara mine. Time histories of stress waves from blasting were obtained from me

    Jan 1, 2003

  • SME
    Reflections on ilmenite roasting and magnetic separation

    By N. R. Allen, J. D. Steenkamp

    Oxidative roasting is applied on an industrial scale to beneficiate ilmenite concentrates from South African East Coast heavy minerals deposits - the aim is to increase the magnetic susceptibility of

    Jan 1, 2005

  • AUSIMM
    The Nokomai Gold Mining Project

    By G Boyd

    The Nokomai Gold Mining Project commenced production in January 1992. The Project continues a history of mining in theNokomai Valley which extended from 1863 to 1942. L & M Mining Limited have hel

    Jan 1, 1992

  • SAIMM
    Cobalt And Nickel Removal From Zincor Impure Electrolyte By Molecular Recognition Technology (MRT) - Pilot Plant Demonstration

    By G. J. van Tonder

    The use of Molecular Recognition Technology (MRT), a highly selective separation technology using specifically designed ligands (such as macrocycles), has been demonstrated to be an effective treatmen

    Jan 1, 2002

  • SAIMM
    Grain Size Modelling Of A Low Carbon Strip Steel During Hot Rolling In A Compact Strip Production (CSP) Plant Using The Hot Charge Route

    By W. Stumpf

    Mill log analyses and complementary hot deformation studies were carried out on the as-cast structure and on a hot rolled structure of the same low carbon steel (SAE 1006) that had been processed acco

    Jan 1, 2003

  • CIM
    New System Architecture and Communication Concepts for Automated Underground Machinery

    By Christoph Mueller

    Mining operations today are characterized by a high degree of mechanization and single machine automation. However, their potential for cost cuttings and increase of productivity in the future is quit

    May 1, 2006

  • NIOSH
    OFR-47-80 Interpretation Of Rock Mechanics Data (Vol. II) (A Guide To Using UTAH2)

    By William G. Pariseau

    A brief description of a two-dimensional elastic-plastic finite element program intended for mine stability analysis is presented that includes detailed instruction for input data preparation and how

    Jan 1, 1978

  • CIM
    Applications of geophysical methods to resource development in northern Canada

    By A. E. Taylor, A. S. Judge, P. T. Lafleche

    "Resource development in northern Canada has special requirements which derive from the unique environmental and eco-logical nature of the northern environment. In this paper several case histories in

    Jan 1, 1987

  • ISEE
    Advanced Technology for Blast Design, Execution & Assessment

    AQUILA Mining Systems Ltd., designs, develops and delivers systems for measurement, analysis, simulation, control and automation to the mining, construction and petroleum industries. The objective of

    Jan 1, 1994

  • NIOSH
    Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery Rooms

    By T. M. Barczak, S. C. Tadolini

    Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery e

  • TMS
    Study On Tin And Zinc Recovery And Pellet Preparation For Blast Furnace From Iron Concentrate Containing Tin And Zinc

    By Yuanbo Zhang

    Keywords: Complex Iron Ores, Roasting, Tin, Zinc, Pellets, Comprehensive Recovery. The complex iron ores containing tin, zinc are typical refractory ores. Large reserves of the ores are found in Ch

    Jan 1, 2005

  • AIME
    Reservoir Engineering - General - Steam Zone Growth in a Preheated Reservoir

    By P. J. Closmann

    Steam zone growth as a function of time has been calculated for the case of constant rate steam injection into a preheated reservoir. To simplify the calculation a linear temperature profile has been

    Jan 1, 1969

  • SME-ICGCM
    Factors Influencing the Occurrence of Coal Pillar Bumps at the 9-Right Section of the Olga Mine

    By David C. Oyler

    The Bureau of Mines conducted research at the 9-Right Section of the Olga Mine to determine the cause of bumps and aid in the development of appropriate control techniques. The purpose of this paper i

    Jan 1, 1987

  • SME
    Designing, Installing and Maintaining Clean, Stable and Efficient Conveyor Belt Systems

    By R. P. Stahura

    Conveyors are the lifeline of mining and processing operations. They continuously supply materials to and carry finished products and waste away from operations. When conveyors are running at less tha

    Jan 1, 1992

  • DFI
    Construction Productivity Advancement Research Program (CPAR)

    By Jesse A. Pfeiffer

    CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati

    Jan 1, 1989