Search Documents

  • SME
    Borehole Hoisting For Shaft Sinking And Development At Brunswick Mining And Smelting Corporation Limited, Bathurst, New Brunswick

    By W. R. Dengler, R. S. Brown

    In 1974, Brunswick Mining and Smelting Corporation Limited started a 48 million dollar expansion programme at their property in Bathurst, New Brunswick. A portion of the expansion plans includes a 26

    Jan 1, 1976

  • AUSIMM
    The Structure of the Rosebery Ore Deposit, Tasmania

    The pyrite-sphalerite-galena and barite orebodies at the Rosebery mine are concordant with the shale host rock and have been deformed into one system of folds with an associated axial plane cleavage.

    Jan 1, 1972

  • DFI
    Micropiles And Anchor Piles - The Liberty Bridge

    By Daryl W. Wurster

    The Liberty Bridge in Greenville, South Carolina is a curved, cable-stayed, pedestrian bridge with primary support provided by two towers. The bridge is part of the Falls Park redevelopment. The bridg

    Jan 1, 2006

  • CIM
    A Short History of Mineral Processing

    By Fathi Habashi

    "Crushing and grinding of ores and their beneficiation by washing away gangue minerals has been practiced since ancient times. Primitive crushing was done by hand pounding the ore with a hard stone th

    Jan 1, 2009

  • CIM
    Performance Enhancement of Semi-Autogenous Grinding Mills Through the Use of Instrumentation Based on Acoustic Signals

    By David G. Almond

    "Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations having large SAG mills fitted with variable speed drives. Problems associated wi

    Jan 1, 2005

  • SAIMM
    Empirical Observations of Dilution in Panel Caving

    By R. L. Castro

    The extraction of ore in panel caving operations also involves the coextraction of non-economic material, known as dilution. Forecasting, avoiding, and understanding the mechanics of dilution is criti

    Jan 1, 2014

  • ABM
    MICROESTRUTURA, MICRODUREZA E PARÂMETROS TÉRMICOS DA LIGA DE SOLDA Sn-40%Bi-2%Ag

    By Vítor Covre Evangelista da Silva

    Esta proposta objetivou desenvolver uma análise teórico/experimental da influência de 2% Ag (em peso) em uma liga de solda Sn-40%Bi solidificada unidirecionalmente em regime transitório de fluxo de ca

    Aug 16, 2017

  • SAIMM
    An Integrated Limestone/Lime Process For Partial Sulphate Removal

    By A. J. Geldenhuys

    This paper will focus on two topics, namely (1) an innovative process for the neutralization and partial sulphate removal of acid streams produced during coal mining and processing and (2)optimization

    Jan 1, 2003

  • SME-ICGCM
    Mitigating the Effects of High Horizontal Stress on Ground Control in An Underground Stone Mine: A Case History

    By John Ellenberger

    The nature of a stone deposit is rarely defined through exploration and engineering design, but more through the actual experience encountered as the mine develops; hence, issues with ground control a

    Jan 1, 2012

  • SME
    Tellurium Resources In New Mexico

    Tellurium (Te) is one of the least abundant elements in the crust and tends to form minerals associated with copper, lead, zinc and iron sulfide deposits. Today, most tellurium production comes from t

    Feb 27, 2013

  • SME
    Niagara Tunnel Project

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.

    Jan 1, 2007

  • SME
    More Than 110,000 Attend ConExpo in Las Vegas

    By Steve Kral

    More than 111,350 mining and construction industry professionals from throughout the world gathered in Las Vegas, NV, March 19-23 for ConExpo-Con/Agg 2002 and IFPE 2002. The triennial event is the We

    Jan 1, 2002

  • SAIMM
    Fatigue Properties Of Fabricated Aluminium I-Beams

    By M. Matema

    Paper written on project work carried out in partial fulfilment of BSc (Eng.) Metallurgy and Materials Engineering Small and large welded aluminium specimens were tested in fatigue and the results

    Jan 1, 2005

  • ISEE
    Portable Continuous Velocity of Detonation Systems

    By Jackson R. Pressley, M L. Hopkins, R E. Danell, N T. Moxon, Andrew Bowman

    Efficient and cost effective blasting is achieved by closely matching the explosive energy to the strength of the material in which it is being used. Although there are many empirical relationships wi

    Jan 1, 1991

  • SME
    Factors Influencing Use Of Mineral Admixtures For The Past Decade In The Western US - Preprint 09-081

    By G. Hoffman

    Sustainable development has brought social, environmental and energy efficiency concerns together with management and governance of natural resources. Cement manufacturing, an energy- and natural reso

    Jan 1, 2009

  • TMS
    Dust Forming Mechanisms In The Copper Converting Process

    By Bo Björkman

    A controlled dust generation whereby the dust generated would be enriched with specific metals would considerably facilitate the possibilities of recovering metals from such dusts. A basic understandi

    Jan 1, 1996

  • NIOSH
    RI 2626 Hazards of Electric Sparks And Arcs In Coal Mines

    By L. C. IlsLey

    "There is an old saying that ""It is too late to lock the stable after the horse is stolen"". Is not this just what is being done by many mine operators today when it comes to buying safe electrical e

    Jul 1, 1924

  • AIME
    Getting The Foreign Workman's Viewpoint

    By Prince Lazarovich, Hrebelianovich

    I WAS asked by the chairman of one of the Sessions on Employment Problems to talk about the viewpoint of the foreign workingman. I am not a workingman. I have never done what a work-hand might call an

    Jan 4, 1918

  • DFI
    Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction

    By Brian R. Zuckerman

    The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State

    Jan 1, 2002

  • AUSIMM
    Investigations of Massive Sulphide Mineralisation Along the Kermadec Arc 1996 - 2005

    By G J. Massoth, K Faure, A G, R G. Ditchburn, I J. Graham

    From modest beginnings in 1996, research into the mineral potential of New ZealandÆs Exclusive Economic Zone has progressed into a major multidisciplinary component of GNSÆs recently funded 6-year æMi

    Jan 1, 2005