Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Steelmaking - Technological Options

    During the last 125 years, the steel industry has witnessed revolutionary changes in the process of steelmaking. The Bessemer process was the predominant steel production technology during the last

    Jan 1, 1999

  • AUSIMM
    Steam-Fluidised Bed Drying and its Significance for Electricity Generation and Gas Production in the Latrobe Valley

    Currently raw brown coal is fired in the Latrotx; 'ahcc th,iki~, Lanying with it two major penalties, (a) boiler efficiency of 65 - 70 per cent (in terms of GCV), (b) much higher boiler cost th

    Jan 1, 1992

  • AUSIMM
    Mine Rehabilitation Case Studies on the West Coast

    By L Langer, R Simcock, M Davis

    Rehabilitation of mining sites helps to achieve the purpose 5(2c) of The Resource Management Act 1991 û æavoiding, remedying, or mitigating any adverse effects of activities on the environmentÆ. The e

    Jan 1, 1996

  • AUSIMM
    The Influence of Mining on Sediment Geochemistry of the Waitekauri Catchment, Waihi, New Zealand

    By J G. Webster-Brown, K L. Brown

    The Waihi Region is host to many low sulphidation epithermal Au-Ag deposits. The Golden Cross mine located at the head of the Waitekauri River, eight kilometres NW of Waihi, was a gold mining operatio

    Jan 1, 2003

  • AUSIMM
    Copper Waste Dump Leaching

    Copper waste dump leaching is growing in importance because of the.large tonnages (up to 250,000 ton/day) of low grade waste rock available from open cut mining of copper deposits and proof that contr

    Jan 1, 1967

  • AUSIMM
    Site Investigation of Saline Gold Tailings Storages in Western Australia

    By M Fahey

    Large volumes of tailings are produced annually by the goldmining industry of Western Australia. This material ishydraulically discharged into large storage facilities usingsub-aerial deposition metho

    Jan 1, 2001

  • AUSIMM
    The Tennant Creek Goldfield

    The Tennant Creek goldfield is situated in the Northern Territory, 360 miles north of Alice Springs, or a tot~l distance of 1,300 miles north of Adelaide, and 600 miles south of Darwin. The auriferous

    Jan 1, 1942

  • AUSIMM
    Transition from owner mining to contract mining – a structured tender process using a holistic approach

    By Y G. Anoman

    This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most e

    Jun 22, 2022

  • AUSIMM
    Water Treatment at Waikato North Head Mine Site

    By B Orchard

    New Zealand SteelÆs Waikato North Head mine, situated at the mouth of the Waikato River, supplies approximately 1.2 million tonnes per annum of titanomagnetite concentrate to the Glenbrook steel mill.

    Jan 1, 2002

  • AUSIMM
    Land Reclamation Trials and Practices at Martha Hill Gold Mine, Waihi, New Zealand

    By P E. H Gregg, R B. Stewart

    Reclamation field trials commenced in 1985, two years before the granting of the Mining Licence. The level of pasture production on varying soil depths (0 cm, 5 cm, 15 cm and 25 cm) overlying both tai

    Jan 1, 1995

  • AUSIMM
    Differences of Opinion in the Recent Geological Report on Broken Hill, N.S.W.

    IN the recent monograph on Broken Hill, N.S.W., by E. C. Andrews,* two independent petrological reports appear as Appendices 1 and n, by W. R. Browne and F. L. Stillwell respectively. In these conside

    Jan 1, 1924

  • AUSIMM
    Volcanics and Mineral Deposits Along a Plate Boundary

    Waitemata Tectonic Event(25 Ma ago) created a subduction system from the northeast of Northland, causing: (1) the emplacement of the Northland Allochthon (24-23 Ma) which provided argillaceous limesto

    Jan 1, 1997

  • AUSIMM
    An Integrated Agency Approach to Mine Site Environmental Management and Control in New South Wales, Australia

    The Department of Mineral Resources is the lead agency in mine site environment management and control inNew South Wales. The Department introduced a Mining, Rehabilitation and Environmental Managemen

    Jan 1, 1995

  • AUSIMM
    Western Lode Structures and Southward Extensions of the Boulder Mining Belt

    An intensely sheared and mineralized zone occurs in the quartz dolerite greenstone (or younger greenstone) mass on the western limb of the Kalgoorlie syncline. This zone comprises the western part of

    Jan 1, 1964

  • AUSIMM
    Calibrated Geotechnical Measurement to Provide a Quantitative Understanding of Rock Mass Conditions at the Tasmania Gold Mine, Beaconsfield, Tasmania

    Judicious placement of a range of geotechnical instruments was employed at the Tasmania gold mine, Beaconsfield, Tasmania, as a key strategy in the monitoring of rock mass conditions over the past fou

    Nov 25, 2010

  • AUSIMM
    The 2,600 Feet Level Exploratory Drive North at North Broken Hill Limited

    CONTENTSIntroductionNorthern ExplorationDrive ConceptionGeneralDriving CrewDrive Cross Section and Track DetailsVentilation by Electrically Driven FanTemperatures and HumidityFan PerformanceRock Drill

    Jan 1, 1946

  • AUSIMM
    Considerations on Quality Assurance/Quality Control and Sample Security

    By G Gosson

    An important requirement in every geological quality control program is that the identity and grades of the control samples (duplicates, certified reference materials (CRMs), and blanks) must remain æ

    Jan 1, 2008

  • AUSIMM
    Australian Participation in the Ocean Drilling Program: An Economic Geology Perspective

    The Ocean Drilling Program (ODP) is the largest international geoscience project in the world, and the state-of-the-art drill ship, the JOIDES Resolution, is permanently at sea. Each year there are si

    Jan 1, 1995

  • AUSIMM
    Arc Exploration from the Hydrothermal Plume Perspective

    By C E. J de Ronde, I C. Wright

    Oceanic subduction-related volcanic frontal arcs extend over 20 000 km within the western Pacific basin and over 21 500 km worldwide, yet they remain largely unexplored with respect to active seafloor

    Jan 1, 2002

  • AUSIMM
    VertiMill« - Development of Circuit Survey and Performance Evaluation Protocols

    By K Kermanshahi, J Allen, MáHilden, M Powell, S Mwansa, S Palaniandy

    Approximately 420 VertiMills« (VTM) have been installed in mineral processing plants throughout the world, mainly in tertiary and regrind applications plus several in secondary grinding duties. Metso

    Jul 15, 2013