Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    What is the Future for Magnetite Projects in Australia and Why Have Some of the New Projects Been So Problematic?

    By D Connelly

    Magnetite orebodies generally means mining lower grade iron ores, crushing and grinding with significant energy costs in processing and the capital costs being significantly higher than for direct shi

    Jul 13, 2015

  • AUSIMM
    The Use of Geotechnical Instrumentation to Optimise an Engineered Mine Design at Beaconsfield Gold Mine, Tasmania

    By P B. Hills, R J. Walton

    Geotechnical instrumentation has been implemented as a key step for monitoring and optimising an engineered mine design for managing seismicity at the Beaconsfield Gold Mine. Measurements of displacem

    Jan 1, 2008

  • AUSIMM
    Northparkes Mines - New Performance Benchmarks for Underground Mining

    For more than 15 years after the Northparkes orebodies were first discovered in 1976, the project was delayed by the need to find an economic way of mining the low-grade E26 deposit. The decision to

    Jan 1, 1997

  • AUSIMM
    Macroinvertebrate Tolerance across a Range of Conductivities in the Isaac River Catchment (Central Queensland)

    By L Stitz, S Kinnear, L D. Fabbro

    Sensitive and tolerant species of macroinvertebrates were present across a wide range of conductivity concentrations in the Isaac River catchment in Central Queensland, indicating the need for further

    Nov 26, 2013

  • AUSIMM
    The Legacy of Underground Coal Mining – Mine Subsidence: Ipswich Coal Measures Case Study

    By B W. Ham

    The legacy of underground coal mining may be a land surface which, in parts, may be unstable in the long term. A case study analysis has been undertaken to explain some of the hazards and how the risk

    Jul 16, 2014

  • AUSIMM
    An Advanced Modelling Technique for Scale-Up of Batch Flotation Results to Plant Metallurgical Performance

    By O N. Savassi

    A rigorous methodology for prediction of flotation plant performance is presented, which is based on a standardised batch flotation test called the MFT. The work is part of the FLEET program, develope

    Jan 1, 2005

  • AUSIMM
    Thin spray liners for face support at Kanmantoo

    By B Roache

    Ground support installation into the face of development headings has become an accepted practice at many Australian hard rock mines. Ground support is installed in the development face to reduce pers

    Mar 29, 2023

  • AUSIMM
    Development of a Low-cost Instrument for Barometric Pressure Surveys

    By A S. Derrington

    High-accuracy, solid-state digital reference barometers have proven to be well suited to conducting underground barometric pressure surveys. The only problem is their expense; at least A$4000 each. Fo

    Aug 31, 2015

  • AUSIMM
    Operations versus Projects - How Do People Think and What are the Implications?

    By B Clements, G Lane

    The operations and project environments are very different, but overlap in many areas. The development of mineral processing projects is goal oriented, is schedule focused and is a contractual environ

    Oct 29, 2012

  • AUSIMM
    Challenges and Opportunities in the Development of a Cultural Heritage Management Strategy at the Lihir Gold Mine, Papua New Guinea

    By J Cook

    In this paper we present a case study of the challenges and opportunities associated with the development of cultural heritage management strategies at the Lihir gold mine in Papua New Guinea. We disc

    Jan 1, 2009

  • AUSIMM
    Barium Dispersion in Drainage Sediments in Arid Climatic Regimes

    By Bush P. R, Hale M, Dixon C. J, Wheatley M. R

    Barium anomalies in drainage sediments can act as indicators of barite mineralization and path- finders for lead-zinc mineralization. Their detection in an arid climate has been investigated in t

    Jan 1, 1988

  • AUSIMM
    Steaming Coal Evaluation by Pilot Combustion Testing

    The Australian Coal Combustion Testing and Research Facility has been operating commercially for one year and during that period coal product evaluations have been conducted on behalf of four coal

    Jan 1, 1987

  • AUSIMM
    The Discovery of the Wabu Ridge Gold Skarn, Irian Jaya, Indonesia

    By L Soebari, W Sunyoto

    The Wabu Ridge Gold Skarn deposit is located at elevations of up to 3100 metres above sea level, in the Central Highlands of Irian Jaya, Indonesia, 35 km NNW of the Grasberg porphyry deposit. Wabu is

    Jan 1, 1999

  • AUSIMM
    Minimising Blast Damage to the Extraction Level of Northparkes Mine's E26 Block Cave

    Optimal drill and blast design is a process often neglected by many underground hard rock mines. This is even more important to the new mine where ring designs need to be implemented and refined in

    Jan 1, 1995

  • AUSIMM
    Impact of Electronic Blasting Detonators on Rock Quarry Environment, Productivity and Energy Savings

    By M Bilodeau, G Caro, R Beaudoin, D Labrie

    In 2005, Dyno Nobel Canada Inc, DynoConsult and CANMET-MMSL used their pool of expertise in blasting, ground control, open pit and underground mining, mineral processing, information technology and ap

    Jan 1, 2007

  • AUSIMM
    The Influence of Liner Wear on Milling Efficiency

    By P Toor

    Due to the high energy consumption of milling, it is desirable to improve the efficiency of this process. One alternative to reduce energy and material consumption while optimising production yield in

    Aug 8, 2011

  • AUSIMM
    ‘We’re Metallurgists, not Magicians!’

    By E McLean

    The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its

    Aug 8, 2011

  • AUSIMM
    Understanding Mineralisation Controls – A Case Study of the Chesney Deposit

    By J Channell, G Phillips

    "The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai

    Aug 18, 2014

  • AUSIMM
    Development and Implementation of the Garford Dynamic Bolt at the Kanowna Belle Mine

    By R Lachenicht, J Player, A Thompson, E Villaescusa

    Kanowna Belle Gold Mine is a deep, high-stress, sublevel open stoping mine located near Kalgoorlie. Seismic activity during the development cycle presented problems, including concerns regarding the e

    Jan 1, 2008

  • AUSIMM
    Olympic Dam open stope observations, tactics and characterisation

    By G Capes, L Morizzi, N Mitkas, E Jones, D Grant

    This paper describes the mining setting for the sub-level open stoping (SLOS) mining method used at Olympic Dam (OD), and investigates the range of stope performance conditions encountered over 30 yea

    Mar 15, 2021