Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Use of alternative drilling technologies during diamond drilling activities at Ernest Henry Mine – a fractured aquifer case study

    By E Philippa, J Vitanza, C Hawtin, B Miller

    B Miller , E Philippa , C Hawtin and J Vitanza

    Mar 22, 2022

  • AUSIMM
    Effect of Concentrate and Micropellet Addition on Iron Ore Sinter Bed Permeability

    By A M. Nyembwe, A M. Garbers-Craig, R Cromarty

    With the depletion of high-grade lump iron ore, concentrates have been identified as an alternative material for sinter making. Adding concentrates to the sinter mixture reduces sinter bed porosity an

    Jul 13, 2015

  • AUSIMM
    TiRON – A New Process for the Production of High-Grade Feedstock for TiO2 Pigment Manufacture

    By J M. Shekiro

    In the chloride process to manufacture TiO2 pigment, feedstocks containing higher TiO2 contents (high-grade ores or HGOs) are favoured in order to minimise production of undesirable by-products. Most

    Oct 5, 2011

  • AUSIMM
    The Mine Management System at Olympic Dam Mine

    The operations management system at Olympic Dam has evolved over a two-year period to the state described in this paper. This evolution has been driven largely by the requirements of the recent expans

    Jan 1, 2000

  • AUSIMM
    A Case Study of Water Management on Closure of an Open Pit Mining Operation in North Queensland, Australia

    By P Ritchie, E H. Briese, N A. Currey

    Kidston Gold Mines, located in semi-arid North Queensland, Australia is currently in its closure phase. Highly innovative and comprehensive rehabilitation strategies were employed at the site, includi

    Jan 1, 2003

  • AUSIMM
    The Benefits of using Photogrammetry in the Geological Interpretation of the Cosmos Nickel Mine

    By K Rees

    In the ideal world of an underground mining engineer, all narrow vein orebodies would be perfectly straight and continuous, thus would be a dream to mine. However, this is usually not the case. Narrow

    Mar 26, 2012

  • AUSIMM
    The Use of Polysulfide as an Alternative Sulfidising Reagent for the CPS Flotation of Oxide Copper Ores

    By G Tsatouhas, R Newell, K Y. Wong

    A sulfide ion selective electrode was used to control sulfidiser addition in the flotation testing of a synthetic and a naturally occurring ore containing malachite in order to compare the behaviour o

    Jan 1, 2005

  • AUSIMM
    Redevelopment of the Morning Star Gold Mine - ABSTRACT ONLY

    Morning Star Gold aims to enter the ranks of Australia's gold producers, revitalising the Eastern Victorian Goldfi elds in the second half of 2010 - the fi rst gold production in around 50 years

    Aug 1, 2010

  • AUSIMM
    Process optimization of Mount Morgan gold tailing retreatment plant

    By Hampshire MJ

    The tailing retreatment project rated at 10 000 t/day commenced operations in October 1982. The operation consists of dredging, feed preparation, cyanide leaching and carbon-in-pulp (CIP) gold reco

    Jan 1, 1986

  • AUSIMM
    Tubular Drainage and Lining Geocomposite for Mine Tailings and Heap Leach Pads

    By Y Durkheim, P Saunier, L Ameglio

    "In the last decade Afitex developed the Draintube™ geocomposite, which provides simultaneous drainage and waterproofing functions. This new type of drain tubes planar geocomposites (DTPG) differs fro

    Jul 27, 2015

  • AUSIMM
    X-ray Computed Tomography – a Geometallurgical Tool for 3D Textural Analysis of Drill Core?

    By M A. Jardine, J A. Miller, M Becker, M Harris

    "Although the role of texture has been increasingly recognised as a geometallurgical indicator of ore characteristics and their variability, the ability to appropriately quantify and correlate it with

    Jun 15, 2016

  • AUSIMM
    The effect of vane shear rotation speed on the estimation of tailings undrained strength

    By B Wentzinger, Y Keulemans

    This paper presents the results of a field study designed to assess the impact of vane rotation speed on the estimated undrained strength for two Australian bauxite tailings storage facilities. The va

    Jul 1, 2021

  • AUSIMM
    Investing in new process improvement technology: reducing the risk of implementation – a way forward

    By S H. Algie, E J. Knoblauch, I A. Lovatt, S G. Doig

    Mill operating teams are expected to engage in a perpetual quest for process improvement – pushing the boundaries of practical process limits and testing new technology to achieve the next step-change

    Aug 29, 2018

  • AUSIMM
    Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South Australia

    By A Querzoli, B Williams

    In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann

    Jul 25, 2018

  • AUSIMM
    Risk Assessment of Historical Mine Waste Using Chemical Analysis and Ocular Mineral/Rock Classification û A Comparison

    By S SSdbom

    A comparison was made between chemical analysis and ocular mineral/rock classification in health-based risk assessment of historical mine waste produced between 1625 and 1975. Large parts of the mine

    Jan 1, 2008

  • AUSIMM
    Project Controls for Large Mining Projects - The Client's Perspective

    Control of construction projects is the responsibility of the Project Leaders who have the authority to make decisions. Project Controls cost and scheduling systems provide the Leaders with timely inf

    Jan 1, 1993

  • AUSIMM
    The Status of Mine Water Pollution in South Africa

    This paper presents an overview of the current status of mine water management in South Africa. The regulatory framework within which mine water management operates is set out, based on the principles

    Jan 1, 2003

  • AUSIMM
    Spatial Modelling and Optimisation of Geometallurgical Indices

    By M J. Newton

    As part of the AMIRA P843 project Keeney and Walters (2008) describe how the principal components analysis (PCA) method can be used to identify classes of samples with similar metallurgical characteri

    Sep 5, 2011

  • AUSIMM
    Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study

    By D Blair, T Scutts, L Fergusson

    This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh

    Jul 16, 2014

  • AUSIMM
    Benchmarking and cross validation of the multivariate conditional simulation model of the Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    The Olympic Dam deposit is truly a world-class IOCG-Ag deposit, the world’s fourth largest deposit of copper and the world’s largest known single uranium deposit. Traditional and non-traditional metho

    May 24, 2023