Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South Australia

    By A Querzoli, B Williams

    In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann

    Jul 25, 2018

  • AUSIMM
    Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study

    By D Blair, T Scutts, L Fergusson

    This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh

    Jul 16, 2014

  • AUSIMM
    Benchmarking and cross validation of the multivariate conditional simulation model of the Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    The Olympic Dam deposit is truly a world-class IOCG-Ag deposit, the world’s fourth largest deposit of copper and the world’s largest known single uranium deposit. Traditional and non-traditional metho

    May 24, 2023

  • AUSIMM
    Ultrastand - An Innovative Cable Bolt

    Cable bolts are being used more extensively by the mining industry for many different rock reinforcement applications. The configuration of these bolts has evolved over the last 20 years to meet the i

    Jan 1, 1992

  • AUSIMM
    Scaled depth of burial application to increase blast efficiency in PT. Indo Muro Kencana

    By A Suwandhi, H Utama

    PT. Indo Muro Kencana (PT.IMK) is a gold mine that is located in Central Kalimantan, Indonesia. Drilling and blasting activity is applied in order to support mining production. Drilling and Blasting (

    Jun 22, 2022

  • AUSIMM
    Effect of the Recycling Load on the High Pressure Grinding Rolls' Performance - A Case Study with the Industrial Unit During Cement Clinker Grinding

    By H Benzer, N A. Aydogan

    It is well known that the high pressure grinding rolls (HPGR) can only be operated efficiently under choke feeding conditions in which a material bed is built up between the rollers to ensure interpar

    Jan 1, 2009

  • AUSIMM
    New perspectives in iron ore flotation – from fundamental studies to on-site pilot testing

    By L O. Filippov, A Piçarra, I V. Filippova, N P. Lima, K Silva

    The reverse cationic flotation using the starch as depressor of iron oxides is the most efficient upgrading process when is applied to the simple systems composed by hematite/magnetite and quartz. The

    Aug 24, 2022

  • AUSIMM
    Project Hobson – New Technology in Auckland

    By T Ireland

    The Project Hobson tunnel excavation was the first use in New Zealand of an earth pressure balance (EPB) tunnel boring machine (TBM). The tunnelling on the project was very successful and break-throug

    Mar 8, 2011

  • AUSIMM
    Optimisation of cemented rock fill strength for open stope support

    By J Player, R de Vries, E Villaescusa, H Saw, R Hassell

    The use of cemented rock fill (CRF) for support of open stope walls has increased in the Australian underground mines operations over the last five years due in part to its low capital cost. In open s

    Oct 16, 2017

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    Diversity in Leadership - 'Be Free, in a Unfree World'

    Diversity; what a wonderful topic. Diversity; the condition or quality of being diverse, different, varied to the point that the very word diversity means different things to different people. As on

    Jan 1, 1996

  • AUSIMM
    Coal Resource Planning in the Hunter Region

    By Short KC

    The Hunter Region, with a major part of the coal resources of New South Wales and a long history of coal mining, has experienced a rapid expansion of coal resource development in recent years. Whi

    Jan 1, 1987

  • AUSIMM
    Quality Assurance Standards for Mine Ventilation Models and Ventilation Planning

    By D J. Brake

    Most mine ventilation engineers are involved in ventilation planning and design in some capacity. Ventilation modelling software used by a competent experienced ventilation engineer is extremely usefu

    Aug 31, 2015

  • AUSIMM
    Risk Assessment Models for Post-Mining Land Use

    By C Smith, R I. Maczkowiack, P D. Erskine

    Open cut coal-mining has been conducted in the Bowen Basin region of central Queensland for almost five decades, and has disturbed an estimated area of 140 000 ha of agricultural land until 2011. Appr

    Jul 10, 2012

  • AUSIMM
    Anglo American Research LaboratoriesÆ (AARL) Experiences with Flotation Plant Modelling

    By V Ser, R Crosbie

    To date, Anglo American Research Laboratories (AARL) has carried out several projects, based on the techniques developed in AMIRA International LimitedÆs (the mineral industries research association)

    Jan 1, 2005

  • AUSIMM
    Groundwater modelling support for closure approvals at Ranger Uranium Mine

    By J Sigda, T Jones, D Staggs, J Ewing, C Cheng, J Pickens, S Paulka

    Mine-derived solutes from Energy Resources of Australia’s (ERA’s) Ranger uranium mine have been closely monitored for decades. Ranger is surrounded by the Northern Territory’s Kakadu National Park and

    Jul 1, 2021

  • AUSIMM
    Preconcentration in the pit – size matters

    By T BoBo, D La Rosa, P Cameron

    Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u

    Nov 10, 2020

  • AUSIMM
    Advances in Mathematical Modelling of Sintering Performance of Iron Ore Fines

    By T Raynlyn, R J. Holmes, J R. Manuel, A Poliakov, L Lu

    The prediction of sintering performance of iron ore fines and the possibility of targeted optimisation of specific sinter properties are very important for both the iron ore industry and related resea

    Jan 1, 2009

  • AUSIMM
    Analysis of premature failure of rock bolts and cable bolts failed in underground coal mines

    By P Craig, A Crosky, H Ramandi, S Saydam, H Chen

    Frequency of reports on premature failure of rock bolts and cable bolts have increased in past two decades. Such a failure threatens both the safety of underground mine workers and the economic viabil

    Nov 30, 2018

  • AUSIMM
    Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final Design

    By E C. F Hamman

    Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock

    Jan 1, 2007