Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Syama Gold Mine – the Journey towards a Class-leading Gold MineBy R Sinclair, D Landwehr, I Hunter
"The Syama Gold Mine, located in southern Mali, was established in 1990 by Broken Hill Propriety Limited (BHP). The operation began treating oxide, and in 1994 it transitioned to processing hard and r
Oct 10, 2016
-
Ventilation considerations and modelling of lithium battery fires inunderground miningBy C M. Stewart
Lithium battery electric powered vehicles and machines (BEVs) continue to gain traction inunderground mining use, with predictions they will dominate the underground light and heavy vehicle fleets for
Oct 12, 2022
-
Screen Media Aperture Size Measurement Using MetsoÆs Screen TrackerBy G van Niekerk, M Wortley
Screening is a critical part of many mineral processing circuits and keeping the aperture of the screening media within specification is vital to ensure efficient performance of the processing plant.
Sep 26, 2011
-
Holistic Management of Sulfides at Rio Tinto Iron Ore's Pilbara Mine SitesRio Tinto Iron Ore (RTIO) manages eleven mines in the Pilbara region, Western Australia. Three of these mines have previously or are currently mining black shale that contains varying amounts of pyrit
Jan 1, 2009
-
Tailings process optimisation through automation and controls integrationBy R Williams, M Baxter, D Zink, R Cunningham
The purpose of this paper is to discuss the efficient operation of a tailings dewatering circuit comprising a thickener and filter press through proper control and automation. It is common to see thi
Jul 23, 2018
-
Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based SimulatorsBy P Wood, S Leveritt
This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy
Sep 18, 2012
-
Newmont Tanami Operations – Tailings Storage FacilitiesBy S Thacker, M Noakes
The Newmont Tanami Operations (NTO), formerly the Granites Gold Mine, commenced operation in the mid-1980s with tailings deposition evolving over the past three decades as production has increased and
Jul 27, 2015
-
Big Bell Coming Back for Seconds, Thirds and FourthsIn October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t
Jan 1, 1998
-
Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil DumpBy R Van Laeren, G Langerak, S Fityus, K Koosmen
Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal
Jul 27, 2015
-
Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western AustraliaBy D R. Anstey
The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from
Jul 11, 2011
-
Ramp-up and long-term performance of the Albion Process™ plant at GeoProMining Gold ArmeniaBy D Walker, A Tsvetkov, P Voigt, O Kloiber-Deane
The GPM Gold Operation has been employing an Albion Process™ plant at its Sotk (Zod) gold mine in Armenia since 2014. Long term data from the operation is now being published for the first time. The
Aug 29, 2018
-
Operational readiness – what is it and how to get it done?By A G. L Pratt
Operational readiness is a commonly used term in mining and many other industry settings. However, translating this term into a coherent scope of work that is practical and meaningful is a challenge f
Mar 29, 2023
-
Multicomponent modelling and simulation of the Minas Rio iron ore grinding circuitBy T M. Campos, J Silva, L M. Tavares, J Lichter, L P. Alves, B K. N Rocha, H D. G Turrer
The depletion of the richest ore deposits and the increase in number of mining projects involving deposits with complex mineralogy, higher competence and lower grade has led to an eminent need for imp
Aug 24, 2022
-
Pyrite depression at Boliden Tara using F-250 – a biopolymerBy Y Peng, C Burns, Y Mu, R A. Lauten
In both laboratory flotation experiments and from analysing the composition of the lead concentrate at the Boliden Tara lead-zinc mine in Ireland, it has been found that F-250 may replace cyanide as a
Aug 29, 2018
-
Application study of UAV technology in tailings pond monitoringBy T Zhao, K Wang, Z Zhang
Tailings pond safety monitoring is vital for preventing dam failures and ensuring environmental safety. Unmanned Aerial Vehicles (UAVs) can enhance tailings pond monitoring with flexible operational c
Sep 1, 2024
-
Slope radar monitoring – a partnership and infrastructure case study of scalability, reliability and availabilityBy E Shilov, R Dixon, L Tovey
BHP Western Australian Iron Ore (WAIO) operations use a suite of slope monitoring systems which are deployed to operational areas based on the ground control risk. Slope Radars are one system used wit
Nov 29, 2022
-
Telfer Project Process Plant DesignBy R Dunne, G Lane, S Ha, D Dreisinger
The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine
Jan 1, 2003
-
Test Work and Design of a Gravity Circuit for Iron Road’s Central Eyre Iron ProjectBy G J. Showers, P Botman, A G. Hunt
Iron Road Limited (Iron Road) is currently evaluating the feasibility of producing 21.5 Mt/a of high-grade (>66 per cent Fe) magnetite concentrate from a 3.7 Bt resource (JORC) located at Warramboo
Jul 13, 2015
-
Active explosion barrier conformance to the Australian Recognised Standard 21 – a total mine solutionBy A Späth
Active explosion barriers are used to contain and suppress a methane gas and/or coal dust explosion propagation, including localised mine fires. Early research indicated that these active explosion ba
Oct 12, 2022
-
The evolution of structural and lithological domaining on the Spotted Quoll nickel sulfide mineral resource estimateBy A D. Wulfse, C M. D Barton
Underground fractured aquifers in the Ernest Henry deposit are to a large extent controlled by deposit scale brittle structures. The underground mine has been subdivided into nine water zones based on
Mar 22, 2022