Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Long hole plug – addressing the hazard of bogged rods in ‘upholes’

    By G Noonan, S Thomas, M Limbert

    Stuck drill rods (often referred to as bogged rods) in production ‘upholes’ are a common problem in the underground mining industry. Bogged and broken off drill rods have the potential to fall out of

    Oct 16, 2017

  • AUSIMM
    An Investigation of Heave and Fragmentation Related to Explosive Properties

    By Vestre J, Kure K, Bergqvist I

    Existing practical laboratory tests for comparative strength determination of commercial explosives consist of the lead block test, the ballistic mortar test, the bubble test etc. These tests are ca

    Jan 1, 1990

  • AUSIMM
    Mine Shafts – Planning, Optimising and Constructing

    By D J. Kilkenny

    Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq

    Mar 21, 2011

  • AUSIMM
    Slag volume effects on direct-reduced iron (DRI)-based electric furnace steelmaking

    By Q Zhuo, P C. Pistorius, M N. Al-Harbi

    A likely increasingly important pathway for future low-carbon ironmaking and steelmaking is the combination of gas-based direct reduction with electric furnace steelmaking (DRI-EAF route), or with ele

    Aug 21, 2024

  • AUSIMM
    Reserve Data for Project Planning

    Efficient project planning during the detailed feasibility to final engineering stages of a project requires not only the accurate prediction of the grade, tonnes and recovery, but their degree of v

    Jan 1, 1987

  • AUSIMM
    Fine Coal Dewatering by Compaction in Bins Exhibiting Reliable Discharge

    This paper firstly reviews the requirements for container and hopper design for reliable discharge. Discussion is then directed to the evaluation of the consolidation stresses acting in both in both t

    Jan 1, 1998

  • AUSIMM
    The BHP Metallurgy Research Facility

    By Hart A. T, Lanigan P. G

    BHP is currently undertaking research into plasma are metallurgical processing at the Central Research Laboratories (CRL), Shortland. The use of high intensity plasma arcs for melting and smelting

    Jan 1, 1987

  • AUSIMM
    The SNIM Guelb II Project in Mauritania – Process Design Challenges

    By G Cooper

    The Société Nationale Industriel et Minière (SNIM) is expanding its ore and concentrate production capacity in Mauritania, West Africa. This government-controlled mining company has bee

    Jul 11, 2011

  • AUSIMM
    The Thermodynamics of Zinc Oxide in Iron Silicate Slags

    By Lee H. G, Li H, Hayes P

    Slag from the smelting of lead can contain up to 20 per cent zinc as an oxide. An understanding of the lead smelting process and of the subsequent fuming process for the recovery of zinc is enhanced

    Jan 1, 1993

  • AUSIMM
    Underground Footwall Monitoring at the Sublevel Caving Mine – Kiirunavaara, Sweden

    By M Svartsjaern, D Saiang and K Mäkitaavola

    The Kiirunavaara mine is a large-scale (28 Mt/a) iron ore mine located in northern Sweden. The mine is owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB) using sublevel caving (SLC). The

    May 9, 2016

  • AUSIMM
    Mineral Sands Resource Security – Underpinning Market Share in a Global Growth Context

    By R Kjar

    Globally, it is anticipated that the mineral sands industry will enter a period of short supply. Demand for both titanium dioxide and zircon is forecast to continue increasing, with new projects neede

    Oct 5, 2011

  • AUSIMM
    Making a positive change – evolving the modern Integrated Remote Operations Centre (IROC) to optimise and support carbon-neutral value chains

    By G McCullough, J Els, J Bassan

    Integrated Remote Operations Centres (IROCs) have a crucial role in optimising a mine’s carbon emissions, especially as industry faces an imperative to achieve net-zero emissions on an accelerated tim

    Sep 18, 2023

  • AUSIMM
    Are our closure planning and regulatory processes adequate to identify, quantify and appropriately transfer residual risks after successful mine rehabilitation?

    By P B. Swart, P D. Erskine

    Despite an increasing focus by media, communities and activists driving an elevated regulatory focus in Australia and indeed some other mining jurisdictions, the mining industry globally has had limit

    Jul 25, 2018

  • AUSIMM
    Integrated Automatization of Longwall Mining System

    By Esaki M, Nishimura K

    This paper describes the results of the field application tests at Miike Colliery on the integrated automatization of the longwall mining system for medium thick coal seam. The purpose of the rese

    Jan 1, 1987

  • AUSIMM
    Environmental Impact Assessment For A Silica Sand Quarry In A New South Wales Coastal Recreation Reserve

    By Longworth C. R

    Competing requirements for land usage sometimes make the correct all- ocation difficult. The decision can be complicated by many factors such as local resident pressure, previous government decisio

    Jan 1, 1976

  • AUSIMM
    Integrated Expert Control System for Grinding and Flotation

    By Jarvensivu M, Ylinen R, Jamsa-Jounela S-L

    The paper presents a new integrated system for control of concentration processes. The system is based on cluster-based modelling taking the ore quality into account and a new on-line particle size

    Jan 1, 1993

  • AUSIMM
    Blast Vibration Monitoring and Elastic Wave Reflection Models to Assess Blast-Induced Damage to Mine Infrastructure - An Underground Case Study

    During underground mining, rock mass changes can occur as a function of the mining sequence and excavation processes. Mining-induced rock mass damage can occur due to redistribution of static stresses

    Dec 6, 2010

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    A Fortunate Life – 45 Years in Heavy Minerals

    By A R. Sale

    This paper highlights two aspects of the mineral sands industry in Australia: the development of the industry from approximately 1870 through to 1980, and the author’s experience in the industry from

    Oct 5, 2011

  • AUSIMM
    Addressing challenging applications of intensive cyanidation in gravity gold recovery

    By J Carrillo, A King

    Gravity recoverable gold (GRG) is largely distinguished from other gold by its non-mineralised, metallic form, its high degree of liberation from the ore and its appreciable particle size. The gold mi

    Aug 29, 2018